Module N° 10 – Phased approach to SMS implementation

Slides:



Advertisements
Similar presentations
FAASTeam CFI Workshop 8 Pilot Deviations Including Runway Incursions
Advertisements

Human Factors in Flight Operations A CAA Perspective
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
RECORD KEEPING Cooperative Development of Operational
Module N° 5 – State ALoS. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts Module 3 ICAO.
Module N° 6 – Prescription/Performance based environment.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
for Cabin Safety Inspectors
1 Documentation Legal Framework Air Navigation Orders Guidelines ATS Manual Airport Manual Safety Management Manual ICAO Annexes Licenses / Certificates.
Module N° 7 – SSP training programme
Module N° 4 – ICAO SSP framework
Module N° 3 – ICAO SARPs related to safety management
1 Welcome Safety Regulatory Function Handbook April 2006.
1 Regulation. 2 Organisational separation 3 Functional Separation.
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Session No. 3 ICAO Safety Management Standards. The Big Picture Two audience groups Two audience groups States States Service providers Service providers.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
ICAO AVIATION SAFETY PROGRAMMES
Module N° 1ICAO State Safety Programme (SSP) Implementation Course 1 Module N° 1 Introduction to SSP implementation course Revision N° 5ICAO State Safety.
Foreign Air Operator Validation & Surveillance
ICAO State Safety Program Requirements Canadian Perspective.
ICAO State Safety Programme (SSP) Implementation Course
ICAO Safety Management Systems (SMS) Course
Prescription / Performance
Module N° 6 – SMS regulation
Module N° 4 – Hazards.
Module N° 10 – Phased approach to SSP and SMS implementation
Module N° 7 – Introduction to SMS
Module N° 8 – SMS planning
Module N° 9 – SMS operation
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Site Safety Plans PFN ME 35B.
Break Time Remaining 10:00.
EMS Checklist (ISO model)
Presentation of the proposed Annex 19 – Safety Management
ICAO Harmonized Safety Management Requirements – The Safety Concern ICAO Harmonized Safety Management Requirements – The Safety Concern Captain Daniel.
Annex 19 Safety Management 1st edition
PP Test Review Sections 6-1 to 6-6
Basic safety management concepts
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
1 Vince Galotti Chief/ATMICAO 27 March 2007 REGULATING THROUGH SAFETY PERFORMANCE TARGETS.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Essential Cell Biology
1 Phase III: Planning Action Developing Improvement Plans.
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Energy Generation in Mitochondria and Chlorplasts
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Session No. 4 Implementing Service Providers SMS Implementing the State’s Safety Programme SMS Senior Management Workshop Rome, 21 May 2007.
FAA ICAO ANNEX 6 PROPOSAL & OVERSIGHT ISSUES IN DISPATCH
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
ICAO EUR HLSC Preparatory Seminar
APLA ORGULLO DE PERTENECER.
Module N° 8 – SMS planning
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Module N° 6 – SMS regulation Safety Management Systems (SMS) Course.
Module N° 10 – Phased approach to SMS Implementation Safety Management Systems (SMS) Course.
Module N° 6 – SMS regulation
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
ICAO EUR HLSC Preparatory Seminar
Milano-Linate Runway Incursion 8th October 2001
SAFETY PERFORMANCE TARGETS
Presentation transcript:

Module N° 10 – Phased approach to SMS implementation

Safety Management System System Building an SMS Module 1 SMS course introduction Module 2 Basic safety concepts Module 3 Introduction to safety management Module 4 Hazards Module 5 Risks Module 6 SMS regulation Module 7 Introduction to SMS Module 8 SMS planning Module 9 SMS operation Module 10 Phased approach to SMS Implementation Safety Management System Module 10 Phased approach to SMS Implementation System Module 8 SMS planning Module 9 SMS operation Module 6 SMS regulation Module 7 Introduction to SMS

Objective At the end of this module participants will be able to develop a proposal for an SMS standard, based upon a phased implementation, and explain the organization of a State’s safety programme.

Outline Why a phased approach to SMS? The four phases The State’s safety programme CAAs – Four steps to support SMS implementation Points to remember Exercise 10/01 – Model of SMS regulation – Outline of an SMS Standard Exercise 10/02 – Collision between two aircraft at Milano- Linate International Airport (See Handout N° 6)

Why a phased approach to SMS? To provide a manageable series of steps to follow in implementing an SMS. To effectively manage the workload associated with SMS implementation. To pre-empt a “ticking boxes” exercise. Four implementation phases are proposed. Each phase is based upon the introduction of specific SMS elements.

Phase 1 – Planning Provides: a blueprint on how the SMS requirements will be met and integrated to the organization’s work activities, and an accountability framework for the implementation of the SMS.

Phase 1 – Planning Identify the accountable executive and the safety accountabilities of managers. Elements 1.1 and 1.2 Identify the person (or planning group) within the organization responsible for implementing the SMS. Element 1.3 Describe the system (Air operator, ATC services provider, approved maintenance organization, certified aerodrome) Element 1.4

Phase 1 – Planning Conduct a gap analysis of the organization’s existing resources compared with the national and international requirements for establishing a SMS. Element 1.4 Develop an SMS implementation plan that explains how the organization will implement the SMS on the basis of national requirements and international SARPs, the system description and the results of the gap analysis. Develop documentation relevant to safety policy and objectives Element 1.6 Develop and establish means for safety communication Element 4.2

Phase 2 – Reactive processes Puts into practice those elements of the SMS implementation plan that refer to the safety risk management component – reactive processes. Elements 2.1 and 2.2 Training relevant to reactive processes: The SMS implementation plan components. The safety risk management component. Element 4.1 Documentation relevant to reactive processes : Elements 1.4 and 1.6

Phase 3 – Proactive and predictive processes Puts into practice those elements of the SMS implementation plan that refer to the safety risk management component – proactive and predictive processes. Elements 2.1 and 2.2 Training relevant to proactive and predictive processes. Element 4.1 Documentation relevant to proactive and predictive processes. Elements 1.4 and 1.6

Phase 4 – Operational safety assurance Development of acceptable level (s) of safety Development of safety indicators and targets SMS continuous improvement Elements 3.1, 3.2 and 3.3 Training relevant to operational safety assurance Element 4.1 Documentation relevant to operational safety assurance Element 1.6

The bridge State’s safety programme Civil Aviation Authority Service Providers SMS State’s safety programme

State’s safety programme Definition An integrated set of regulations and activities aimed at improving safety.

State’s safety programme Implementation Develop the State’s safety programme around the following four components: State’s safety policy and objectives State’s safety risk management State’s safety assurance State’s safety promotion

State’s safety programme components 1. State’s safety policy and objectives How the CAA will oversee the management of safety in the State. A definition of CAA requirements, responsibilities and accountabilities regarding the State’s safety programme. Similar to the equivalent SMS component.

State’s safety programme components 2. State’s safety risk management Establishment of controls which govern how service providers SMS will operate: Standards/requirements for service providers SMS Same processes as SMS Hazard identification and risk management Different outputs New/modified rules and/or regulations (i.e., controls) which govern how service providers SMS operate.

State’s safety programme components 3. State’s safety assurance Ensuring that the operation of service providers SMS follows established controls (standards / requirements) Oversight, inspections and audits Data tracking and analysis Data driven targeting of oversight on areas of greater concern/need.

State’s safety programme components 4. State’s safety promotion Support the integration of the State safety programme with the operation of service providers SMS Training, communication and dissemination of safety information Dual-track promotion Within the CAA Among service providers it oversees

State’s safety programme framework State’s safety policy and objectives 1.1 CAA safety standards 1.2 CAA safety responsibilities and accountabilities 1.3 Accident and incident investigation 1.4 Enforcement policy State’s safety risk management 2.1 Safety requirements for service providers SMS 2.2 Approval of service providers acceptable levels of safety State’s safety assurance 3.1 Safety oversight 3.2 Safety data collection, analysis and exchange 3.3 Safety data driven targeting of oversight on areas of greater concern or need State’s safety promotion 4.1 Internal training, communication and dissemination of safety information 4.2 External training, communication and dissemination of safety information

CAAs – Four steps to support SMS implementation STEP 1 – State’s safety programme gap analysis: Conduct a gap analysis vis-à-vis the current status in the State of the following: State’s safety policy and objectives 1.1 CAA safety standards 1.2 CAA safety responsibilities and accountabilities 1.3 Accident and incident investigation 1.4 Enforcement policy State’s safety risk management 2.1 Safety requirements for service providers SMS 2.2 Approval of service providers acceptable levels of safety State’s safety assurance 3.1 Safety oversight 3.3 Safety data driven targeting of oversight on areas of greater concern or need State’s safety promotion 4.1 Internal training, communication and dissemination of safety information 4.2 External training, communication and dissemination of safety information

CAAs – Four steps to support SMS implementation STEP 2 – CAA training programme: Develop a training programme for CAA officers to: provide knowledge of safety management concepts and ICAO SARPs on safety management in Annexes 6, 11 and 14, and related guidance material; and develop knowledge to certify and oversee the implementation of key components of an SMS, in compliance with the national regulations and relevant ICAO SARPs.

CAAs – Four steps to support SMS implementation STEP 3 – Implementation SMS SARPs: Develop SMS regulations for operators/service providers. Refer to the SMS components and elements as per the ICAO SMS training course. Prepare guidance material for the implementation of SMS. Refer to ICAO Doc 9859 and the ICAO SMS training course.

CAAs – Four steps to support SMS implementation STEP 4 – CAA enforcement policy: As part of the State’s safety programme, revise the CAA’s enforcement policy. Operators/service providers allowed to deal with deviations/minor violations internally, within the context of the SMS, to the satisfaction of the authority. Gross negligence, wilful deviation and so forth to be dealt through established enforcement procedures.

A vision of the future – Integration State’s safety programme + Service providers SMS = Integrated safety system Protection Production State safety programme Organization’s management system (SMS) production processes Objective: Public Manage and control safety risk Achieve commercial goals and customer satisfaction Acceptance Oversight Risk management Safety assurance

Points to remember Reduce a complex task to series of manageable steps. Avoid a bureaucratic exercise (“Ticking boxes”). Element allocation under a particular phase may slightly vary depending upon the specific Annex. The State’s safety programme The CAAs four steps to support SMS implementation.

Exercise 10/01 – Model of SMS regulation – Outline of a SMS standard Phased approach to SMS implementation Exercise 10/01 – Model of SMS regulation – Outline of a SMS standard

Model of SMS regulation – Outline of a SMS Standard Group activity: A facilitator will be appointed, who will coordinate the discussion. A summary of the discussion will be written on flip charts, and a member of the group will brief on their findings in a plenary session.

Model of SMS regulation – Outline of a SMS Standard Group assignment: On the basis of what was presented and discussed in modules 6 to 9, develop a model of SMS regulation, that addresses the following three general areas: Scope and application Main definitions (Do not develop) General contents (Only headlines) of the SMS regulation

Phased approach to SMS implementation Exercise 10/02 – Collision between two aircraft at Milano-Linate International Airport (Handout N° 6)

Milano-Linate International Airport accident Group activity: A facilitator will be appointed, who will coordinate the discussion. A summary of the discussion will be written on flip charts, and a member of the group will brief on their findings in a plenary session.

Milano-Linate International Airport accident Scenario An MD-87 taxied to the holding point for runway 36R. Heavy fog had delayed the flight by more than one hour. While the visibility was improving, RVR was still only 225 metres. A Cessna Citation parked at the West Apron was cleared to taxi via taxiway Romeo 5 and to report reaching the first holding point. The crew read the clearance back correctly, but entered taxiway Romeo 6.

Milano-Linate International Airport accident ... Scenario The Cessna Citation’s crew called for clearance to proceed from the Romeo 5 holding point though it was in fact at the Romeo 6 holding point. The MD-87 was cleared for take-off. The Cessna Citation crossed the holding point for runway 36R-18L. The two aircraft collided. The MD-87 skidded off the runway into a baggage hangar adjacent to the passenger terminal.

Milano-Linate International Airport accident

Milano-Linate International Airport accident

Milano-Linate International Airport accident

Milano-Linate International Airport accident

Milano-Linate International Airport accident After analysis of evidence available and information gathered, it can be assumed that the immediate cause for the accident has been the runway incursion in the active runway by the Cessna. The obvious consideration is that the human performance issues related to the Cessna crew – during low visibility conditions – must be weighted against the scenario that allowed the course of events that led to the fatal collision.

Milano-Linate International Airport accident Equally it can be stated that the system in place at Milano-Linate aerodrome was not geared to trap misunderstandings, inadequate procedures, human errors and faulty airport layout. The aerodrome standard did not comply with ICAO Annex 14. No functional Safety Management System (SMS) was in operation.

Milano-Linate International Airport accident Group assignment – Task Nº 1 List the type of operation or activity. State the generic hazard(s) State the specific components of the hazard(s). State the hazard-related consequences and assess the risk(s). Assess existing defences to control the risk(s) and resulting risk index. Propose further action to reduce the risk(s) and resulting risk index. Establish individual responsibility to implement the risk mitigation Complete the following Table 10/01.

Table 10/01 – Hazard identification and risk management Existing defences to control risk(s) and risk index Further action to reduce risk(s) and resulting risk index Generic hazard Type of operation or activity Nº 1 2 3 4 5 Hazard-related consequences Risk index: Risk tolerability: Specific components of the hazard Responsible person

Milano-Linate International Airport accident Group assignment – Task Nº 2 The accident investigation has identified that no functional Safety Management System (SMS) was in operation at Milano-Linate International Airport. Therefore you should: Develop a SMS implementation plan for Milano- Linate International Airport Complete the Gantt the following Table 10/02 – SMS implementation plan.

Table 10/02 – SMS implementation plan Component/element Date:

Milano-Linate actual aerodrome layout

Module N° 10 – Phased approach to SMS implementation