The n3He Experiment Michael Gericke for the n3He collaboration

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

FARADAY ROTATION Gennady Voronov In this experiments we experimentally determine the Verdet constant of a glass rod with specification SF-59 to be rad/mT*cm.
1 FNPB “Common Magnet” Design Introduction Geoff Greene UT/ORNL.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
The n- 3 He Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration FnPB PRAC ORNL, TN
The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN
Measurement of the Positive Muon Lifetime to 1 ppm David Webber Preliminary Examination March 31, 2005.
Proposal Update: the n- 3 He Parity Violation Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration FnPB PRAC Meeting ORNL,
The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN
The n 3 He Experiment Probing the Hadronic Weak Interaction Abstract: Although QCD has had tremendous success in describing the strong interaction at high.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
N- 3 He Experiment: overview and updates Christopher Crawford University of Kentucky n- 3 He Collaboration Meeting ORNL, TN
Report of the NTPC Test Experiment in 2007Sep and Others Yohei Nakatsugawa.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
Status update of n- 3 He experiment DOE FnPB Review, ORNL D. Bowman, S. Penttila Oak Ridge National Laboratory M. Gericke University of Manitoba.
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Normalization of the NPDGamma Experimental Data F. Simmons, C. Crawford University of Kentucky, for the NPDGamma collaboration Background: NPDγ Experiment.
Systematics of the SNS n- 3 He Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration APS April Meeting Denver, CO,
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Beam Polarimetry Matthew Musgrave NPDGamma Collaboration Meeting Oak Ridge National Laboratory Oct. 15, 2010.
The new set of MWPCs for CB Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni.
The HYSPEC Polarized Beam Spectrometer Mark Hagen, Barry Winn, Melissa Graves-Brook Neutron Scattering Science Division David Anderson, Xin Tony Tong Neutron.
Status Report for KEK-PS E391a KEK IPNS G.Y.Lim 14 April 2003.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
MICE Phase 1 Koji Yoshimura KEK June
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
The NPD  Experiment David Bowman IScientific goals IIStatus.
Yousef I. Makdisi DIS03 St. Petersburg April 24,2003 Polarized Jet target status The overall view The Dissociator stage The Atomic Beam stage The RF transitions.
DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April DoE, Germantown MD.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
The n- 3 He Parity Violation Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration NSAC Review Meeting Chicago, IL,
CLAS12 Drift Chamber Prototyping
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
CDMS II Shielding To Installation To Construction From Design.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
The n- 3 He Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration FnPB PRAC ORNL, TN
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
ELENA installation progress F. Butin / ELENA collaboration.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
CLAS12 Forward Tracking: Status and Challenges
(On Behalf of CMS Muon Group)
WBS 1.03 Readout Systems Scope, Cost and Schedule
SNS Injection Fields and Coils
Requirements for the ELENA Electron Cooler
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Fundamental Neutron Physics BL-13
Transverse RF Spin Rotator for the n-3He experiment
Preparation of the CLAS12 First Experiment Status and Time-Line
The NPDGamma Experiment at the SNS FnPB
n3He Experiment: Spin Flipper and Neutron Polarimetry
The Parity Violating Longitudinal Asymmetry in
Resonant Frequency Spin Rotator For the n3He Experiment
Advanced Research Electron Accelerator Laboratory
Cryomodule Assembly Plan
A. Freyberg Aug 2016 ECT’16 =>
The n-3He Experiment Christopher Crawford for the n-3He Collaboration
(On Behalf of CMS Muon Group)
Setup for testing LHCb Inner Tracker Modules
Polarized 3He target installation
Presentation transcript:

The n3He Experiment Michael Gericke for the n3He collaboration University of Manitoba for the n3He collaboration March 2014 FnPB Proposal Review & Advisory Committee Meeting 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Outline Brief overview of the experiment Schedule overview / summary (based on current status) Current status of construction and recent progress Beamline components Magnetic holding field Spin rotator Target/detector chamber Preamplifers and DAQ Installation and commissioning plans 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation The n3He Collaboration Spokespersons D. Bowman, M. Gericke, C. Crawford Local Project Manager S. Penttila Project Engineer Jack Thomison Work Subpackage Leaders G. Greene Neutronics L. Barrón Solenoid C. Crawford Spin rotator M. Gericke Target / detector D. Bowman Preamplifiers C. Crawford Data acquisition N. Fomin Online analysis J. Hamblen Integration D. Bowman Commissioning 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Experimental Setup FnPB cold neutron guide 10 Gauss solenoid 3He Beam Monitor RF spin rotator 3He target / ion chamber FNPB n-3He Measure PV spin asymmetry to 2x10-8 Longitudinal holding field – suppressing PC nuclear asymmetry: (1.7x10-6  sn  kn x kp (Hale) suppressed by two small angles RF spin flipper – negligible spin-dependence of neutron velocity 3He ion chamber – both target and detector 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Schedule Overview Complete component construction / bench testing now - May Preassemble in staging are May - June Facility summer maintenance break June-27 – Aug-15 Removal of NPDGamma June-27 – July -7 Installation of n-3He on beam line July-7 - Aug-15 IRR August Alignment of the experiment with beam Sep – Oct -2014 Commissioning; 60 days Oct – Nov - 2014 Measurement of PC transverse asymmetry; 15 days Dec - 2014 Facility winter maintenance break Dec - 2014 - Feb - 2015 Measurement of PV longitudinal asymmetry; 200 days Feb-2015 – Dec- 2015 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Experimental Setup 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Experimental Setup 22/02/2019 n3He SNS FnPB PRAC Presentation

Unistructure support – preliminary CAD model TOP VIEW 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Beamline Scope FnPB guide, polarizer, beam monitors – stays UNCHANGED PPS remains UNCHANGED Beam profile scanners, polarimetry Status All equipment is being used for NPDG experiment except the beam profile scanners XY-scanners in hand and tested Remaining work Design shielding and mounts for xy-scanner – April Design mount for 3He analyzer (polarimetry) – April Modify beamline shielding – April Chris Hayes, Kabir Latiful Josh Hamblen Geoff Greene 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Magnetic Field 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Magnetic Field Scope Magnetic field simulations to verify adiabatic spin rotation and uniformity Unistructure frame for Magnetic coils, Spin rotator, and Target/detector mounts directly onto existing NPDG stands on the beamline Design, construction, and testing of longitudinal solenoid 10 Gauss holding field, just like NDPG Status Calculations indicate adiabaticity, coils being machined (winding in parallel) 18(+1) coils, 15 cm apart, 70(52) cm sides, 150 A turns Materials for frame and coil supports are in hand Remaining work Machining of coil supports: April Coil completion: May Coil delivery to ORNL: June Andrés Ramirez, Libertad Barrón 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Spin Rotator 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Spin Rotator Scope Design of RF double cos-theta coil Machining forms for inner/outer coils, aluminum enclosure, mounts RF driver electronics Field mapping and testing Status Design complete Machining of coils complete Winding of coils Complete RF driver electronics exist and are being used for NPDG Remaining work Construction of enclosure: In progress Testing and field mapping: In progress Chris Hayes, Geoff Greene Chris Crawford 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Spin Rotator (Coils) Design and Construction: Complete Inner cylinder made from PVC Outer coils fabricated using 3D print Technology. 22/02/2019 n3He SNS FnPB PRAC Presentation

Spin Rotator (Photographs) 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Target / Detector 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Target / Detector Scope Vacuum enclosure with 1 atm 3He 144 channels of sense wires low leakage / noise good charge collection Status Vacuum enclosure in hand Wires soldered to frames Remaining work Assemble wire plane stack, readout plane: March HV test and vacuum tests March Fill with 3He: April Electronics noise testing with chamber April Mark McCrea Michael Gericke Seppo Penttila 22/02/2019 n3He SNS FnPB PRAC Presentation

Target / Detector (Housing) 12” Conflat end flanges 1 mm Al windows Fill gas: 1 atm 3He Feedthroughs: 4x signal, 2x high voltage, 2x vacuum 22/02/2019 n3He SNS FnPB PRAC Presentation

Target / Detector (Wire frame stack) 17 HV planes 16 signal planes 144 signal wires All wires soldered to frames Mounting hardware and fittings all constructed PCB readout boards will arrive late March Assembly March-April Testing starting in April 22/02/2019 n3He SNS FnPB PRAC Presentation

Target / Detector (Wire frame stack) 17 HV planes 16 signal planes 144 signal wires All wires soldered to frames Mounting hardware and fittings all constructed PCB readout boards will arrive late March Assembly March-April Testing starting in April 22/02/2019 n3He SNS FnPB PRAC Presentation

Target / Detector (Wire frame stack) 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Kabir Latiful Irakli Garishvili David Bowman Pre-amplifiers Scope 4 enclosures (one per vacuum feedthrough) with 36 channels each Circuit board designed locally at ORNL Connector to ion chamber vacuum port and cabling to DAQ module Status Prototype circuit board tested Achieved theoretical limit on some channels, testing in progress Remaining work Test cooled prototype inside enclosures Build final preamps Build cables Test all channels Measure instrumental asymmetries with spin rotator and target 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Data acquisition Kabir Latiful Irakli Garishvili Nadia Fomin Chris Crawford Scope 144 channels of 24 bit, 128 KS/s ADC Progress Basic software used to take and analyze data Extensive testing of two prototype systems Preliminary measurements of instrumental false asymmetry ADCs ordered, delivery: April 9th; custom firmware by end of May Two DAQ computers acquired; RAID array ordered Remaining work Test complete DAQ hardware: April–May Adjust software for final hardware and custom firmware: May–June 22/02/2019 n3He SNS FnPB PRAC Presentation

Instrumental false asymmetry measurement Measurements with RFSR, preamps, and ADC modules Trigger optically isolated Kabir Latiful Irakli Garishvili David Bowman Chris Crawford Divider Sig. Gen Amp. ADC RFSR optical isolator dirty ground clean ground Fake T0 Preamp 22/02/2019 n3He SNS FnPB PRAC Presentation

Instrumental false asymmetry measurement Data taken for 5 hours A = (2.64 ± 1.64) x 10-10 Will repeat measurements with delivered DAQ and wire chamber 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Schedule Overview Complete component construction / bench testing now - May Preassemble in staging are May - June Facility summer maintenance break June-27 – Aug-15 Removal of NPDGamma June-27 – July -7 Installation of n-3He on beam line July-7 - Aug-15 IRR August Alignment of the experiment with beam Sep – Oct -2014 Commissioning; 60 days Oct – Nov - 2014 Measurement of PC transverse asymmetry; 15 days Dec - 2014 Facility winter maintenance break Dec - 2014 - Feb - 2015 Measurement of PV longitudinal asymmetry; 200 days Feb-2015 – Dec- 2015 22/02/2019 n3He SNS FnPB PRAC Presentation

Integration / Pre-assembly Scope: Design of unistructure support frame Design, construction of mounting and alignment hardware Maintain 3d solid model of experiment Ensure components fit and that support frame matche the NPDGamma stands Status: Preliminary solid model exists Conceptual design for mounts and alignment Model is added to beamline model by SNS designers Remaining work: Final design of stand and mounting Construction of mounting, alignment hardware: April Assembly of complete system in staging area: May-June Alignment testing: June Caleb Wickersham Mark McCrea Jack Thomison Geoff Greene Josh Hamblen 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Alignment Mounting / alignment components Aperture / crosshairs for beam scan Support stand and xy-adjustment for theodolite Alignment V-block for trimming B-field Optical system and adjustable mount for target 10 mrad tolerance – no need for S/A crew 22/02/2019 n3He SNS FnPB PRAC Presentation

Commissioning / Run plan IRR #1 IRR #2 Scan beam profile upstream and transfer centroid to crosshairs Align the position / angle of target with theodolite / autocollimator Scan beam profile downstream Tune RSFR / measure polarization Align theodolite to crosshairs Measure physics asymmetry Align B-field to theodolite Field map in RFSR/Target region 22/02/2019 n3He SNS FnPB PRAC Presentation

n3He SNS FnPB PRAC Presentation Backups 22/02/2019 n3He SNS FnPB PRAC Presentation

2012 TRIUMF Summer Institute NN PNC (Michael Gericke) n3He Calculations Full four-body calculation of strong scattering wave functions Evaluation of the weak matrix elements in terms of the DDH potential (Work in progress on calculation of EFT low energy coefficients) DDH Weak Coupling (ApZ) n3He tp a1 -0.189 a0 -0.036 a1 0.019 a2 -0.0006 a0 -0.0334 a1 0.0413 M. Viviani, R. Schiavilla, Phys. Rev. C. 82 044001 (2010) L. Girlanda et al. Phys. Rev. Lett. 105 232502 (2010) 22/02/2019 2012 TRIUMF Summer Institute NN PNC (Michael Gericke)