Thursday Physics fill 1250 (with 13b) dumped at 10.30

Slides:



Advertisements
Similar presentations
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Advertisements

Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Goal of the week: Stable beams with trains of 200 & 248 bunches 1 OP summary of week 40 R. Bailey, J. Uythoven & J. Wenninger.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Friday 15th June 01:11 Injection.
Monday 14th March Second fill with pilot + 3 nominal bunches
Monday fill with 1092 bunches (6 h stable beams)
Thursday 09:30 VdM scan for CMS, standard ADT gain.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Summary week 31 Week 31 G. Arduini & O. Brüning
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Machine availability reaching well over 80%
Monday – recovery from MKI flashover
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary week 30 Week 30 R. Bailey & J. Wenninger
Wednesday 31 October: Morning
LHC commissioning Week 38
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
Thursday 10th May - morning
Week 36 plan Todo’s: And also: 12+b injection.
LHC Status Sun Morning 20-Mai
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 03/11 – The Plan Finish electron-cloud program:
Summary Thursday h21: Stable beams fill #1303.
Monday – Morning Fill 3265 stable beams since 1:31
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Mon Access for switching temperature probe DFB L7.
Friday 25 bunch fill dumped just before (BLM in 5)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Tue/Wed 12/ :00 Probe beam back again
Thursday – Morning Energy matching at injection with H CODs
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Sat morning Until 12:40: Loss maps at injection
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Thursday 20th July - morning
Monday 10th December - morning
Wednesday 26 October 2011.
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Wednesday 6.10 Morning: Quench test at 450 GeV
Friday 1st October : Van der Meer scans
Monday 152 bunch operation summary
Presentation transcript:

Thursday Physics fill 1250 (with 13b) dumped at 10.30 BLM crate exchange IR7 (10.30 to 17.00) Exchange of crate, check of fibre connections, check of dump request lines, check connections to BIS, etc CMS and ATLAS access in the shadow Beam again from 17.00 Quick attempt to clean up multi-bunch injection Beam 2 is OK Beam 1 losses .. Need to sort this out tomorrow Physics fill with 25b Try hybrid filling scheme B2 4 4 1 4 4 4 4 B1 4 4 1 4 12*1 Beams dumped just before 08.00 (single BLM in 5) 2/22/2019 LHC status

Giulia on shift We are filled !!! 25 on 25 ! We used the Multi_25b_16_16_16_hyb scheme. The following buckets are filled: B1: 1 1001 2001 3001 4001 5001 6001 7001 8001 8941 9941 10941 11941 12941 13941 14941 15941 17851 18851 19851 20851 21851 22851 23851 24851 B2: 1 1001 2001 3001 4001 5001 6001 7001 8501 8911 9911 10911 11911 12911 13911 14911 15911 17851 18851 19851 20851 21851 22851 23851 24851

Thursday Filling 25b Very good for TI8/B2 – in 4b groups. Close to BLM limits for TI2/B1 – even with single bunches. And it worked !!! 2/22/2019 LHC status

Thursday Ramp, squeeze, collide OK 1.2 MJ Peak L seen just after colliding ~2.8E30 cm-2s-1 In STABLE BEAMS peak L ~2.6E30 cm-2s-1 TOTEM RPs at 30/25 sigma (H/V) 1.2 MJ 2/22/2019 LHC status

Friday Morning Afternoon and weekend Multibunch injection studies (Beam 1) Afternoon and weekend Physics with 25 on 25 2/22/2019 LHC status

Interventions needed Magnetic probes in the machine for the studies related to the hump - access would be required in point 5 (GA, LW) 2 hours in the shadow 2/22/2019 LHC status