Line Blockage Guidance for IWA,COSS or PC

Slides:



Advertisements
Similar presentations
1 Welcome Safety Regulatory Function Handbook April 2006.
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 8 – Worker engagement & communication Version: September 07.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Choose and Book Archive New functionality from November 2012.
ALO Planning & Assurance Requirements
Fair culture investigations
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Advancing Excellence in America’s Nursing Homes A Review of 2 Clinical Tools: Pressure Ulcer and Restraints.
X-Call Version 2.0 user guide A manual to explain how to identify arrived patients and call into a preferred location. A manual to explain.
Charging and financial assessment Care Act Outline of content  Introduction Introduction  Conducting the financial assessment Conducting the financial.
Line Blockage Guidance for Planners & GZAC
GZ Planner Guide Issue 03 Green Zone Access User Manual for Planners *** ISSUE 03 DOCUMENT *** FOR OCTOBER 2005 CHANGES. If you identify errors in this.
E | W | E | W | NHS e-Referral Service Referring Roles Issued: 3 June.
Promoting Excellence in Family Medicine Enabling Patients to Access Electronic Health Records Guidance for Health Professionals.
Responding to Inspection Findings
 SOPs are often called the ‘bible’ for your daily operation and as such should bring consistency to the actions of your team.  SOPs tend to fall into.
/ 1 Line Blockage Guidance for IWA,COSS or PC Operational Close Call Line Blockage Group 24-Mar-14.
Chapter 13 Security Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives State the major responsibility.
Managing your project: Do's and don'ts Paul Webb DG Research and Innovation European Commission DG Research and Innovation.
Planning appeals Peter Ford Head of Development Management Planning Committee Training – 30 th July 2015.
Prime Responsibility for Radiation Safety
How to Submit An Amendment Tips from the 21 st CCLC Unit Updated September 17, 2009.
NEW FOR 2009 Faster, Easier, Friendlier. Before you start Any student, staff, or faculty member can file an accident/incident report. Accident reporting.
G045 Lecture 08 DFD Level 1 Diagrams (Data Flow Diagrams Level 1)
CE2303 Railway Engineering
E | W | E | W | NHS e-Referral Service Referring Roles Issued: 27 th.
APPRAISAL OF THE HEADTEACHER GOVERNORS’ BRIEFING.
DSQR Training Reliance System
Standard 019 Update Briefing
Standard 019 Update Briefing
Guide for the application of CSM design targets (CSM DT)
Getting Started with the Grants Portal Grants
Site Safety.
Orientation for the Resource Learning Center Part 5
IAEA E-learning Program
ISO
Understanding of Health and Safety
Getting Started with the Grants Portal Non-Grants
Safety Technical & Engineering
Governor Conference Saturday 25th November 2017.
Considerations If viewing this presentation in slide show format; you will not see all of the extra information supplied within the footnotes. If you want.
Standard 019 Update Briefing
Presentation Title: View > Header & Footer
NR/L3/OHS/019-IP Work Instruction Briefing
Standard 019 PDSW “One Year On”
Considerations If viewing this presentation in slide show format; you will not see all of the extra information supplied within the footnotes. If you want.
Safety Hour Discussion Pack
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
SL026/17 – Product Acceptance
Lifesaving Rule: Plant Exclusion Zones (RRV Operations) Key Principles
UNC Modification Proposal 0373
Our new quality framework and methodology:
Scenario 21: Restorative Approaches (A)
Rule Book Updates December 2018
IRRS REFRESHER TRAINING Lecture 4
Project Management Process Groups
ATS Architecture Design Solution Intent
Understanding your Workplace Specific Critical Controls
West Essex Business Planning Process
TRANSFUSIONS IN THE COMMUNITY
Legal and Organisation requirements for data recording
What is a Constitution?.
What is a Constitution?.
Welcome 1 This is a document to explains the chosen concept to the animator. This will take you through a 5 section process to provide the necessary details.
Drilling and Blasting Toolbox Talk : 07 Updated Oct 2015
What is a Constitution?.
M-Learning 4 Those Who Care
Changes to the Rulebook
That person will have been involved in the planning of the work.
Presentation transcript:

Line Blockage Guidance for IWA,COSS or PC Operational Close Call Line Blockage Group 1 24-Mar-14

Guidance to Signallers Rule Book TS1 (V01) Guidance to IWA/COSS/PC Handbook 8 (V02) Guidance to Planners NR/L2/OHS/019 (V03) 2 24-Mar-14

Background Following a number of issues of interpretation that have resulted in confusion between Signallers, Track workers and Planners regarding the “correct” signals to be agreed during the process of taking a line blockage . This subject has been discussed at the National Operational Close Call Line Blockage group. The intention is to produce further guidance for all groups that is acceptable across the three disciplines. Attached are three briefings, one for each group giving guidance on what is expected when planning a line blockage, requesting a line blockage and granting a line blockage Above all, the underlying principle is making sure that the correct protection is given to the track workers and that signallers and planners are supported in the decisions they are making. 3 24-Mar-14

Principle of a Line Blockage What does the Planner, Signaller, PC, COSS or IWA need to understand when planning, requesting or granting a line blockage? Where is the work activity taking place? This should include the access to the site of work and any protection requirements. Which lines will be affected during the work activity? How will the activity be protected? What signals will be used to protect the activity? (a protecting signal must be identified for each line that will be affected by the work) e.g. Diagram 1 – Up Main L6 Diagram 2 AB4-AB19 What other signals will be kept at danger to protect any route that leads towards the line blockage? e.g. Diagram 1 – Up Branch L8 Diagram 2 AB6-AB8-AB21 What points need to be set so that trains can be signalled normally on unaffected routes? (away from the line blockage) e.g. Diagram 2 – Up Main AB15 Will the safety of the line be affected and what additional protection would be required? Agreement by all parties what additional protection is going to be used. 4 24-Mar-14

Agreeing the arrangements Handbook 8 states: Agreeing the arrangements You must agree all of the following with the signaller. the line to be blocked the nature of the work the locations between which the work will take place the amount of time needed to do the work the time after which permission can be given for the line blockage to start which signal will be kept at danger to protect the activity any additional protection needed If work will take place beyond points that need to be used for train movements The arrangements if single line working is taking place the arrangements to apply at each level crossings What does this mean to a PC, COSS or IWA when they are making a request for a line blockage? 5 24-Mar-14

Guidance - Protection arrangements The signaller and the COSS will have a safety conversation that clearly establishes: Where the work is taking place on the ground Where the work is on the Signallers panel Which running line (s) are affected by the work What are the protecting Signals (Single, Bi-Di or Rev) The safety conversation will then establish which protecting signals will be maintained at danger with reminder devices fitted to protect the work The Signaller will during the safety conversation further establish any other converging routes where signals will also be maintained at danger OR routes with points set and reminders fitted to protect the work (see diagram 1) The objective being to prevent any train entering the area where work is taking place and endangering staff or the safe passage of trains 6 24-Mar-14

Diagram 1 Simple Line Blockage 7 24-Mar-14

Guidance - Protection arrangements The Signaller will expect the IWA/COSS/PC to identify the line (s), specific location & nature of the work to be undertaken. In regard to signal protection on a BI-Directional running lines What are the protecting signals for each end of the section they are working on (see diagram 2) The Signaller & the IWA/COSS/PC will then discuss if any other signals are require to be maintained at danger to protect the staff (see diagrams 1&2) The Signaller WILL record details of all Signals maintained at danger on the RT3180. The IWA/COSS/PC should record & repeat the details on their RT3181 8 20-Mar-14

Diagram 2: Bi-directional lines & working clear of points Signaller will expect the IWA/COSS/PC to identify where they are working and what signals on that line are required as protection. (Signals highlighted in Red) The Signaller and IWA/COSS/PC will have a safety conversation that will agree which signals will be kept at danger to protect the activity (Signals highlighted in Blue) Also what Signals can be used as normal, this may include maintaining a set of points in a specific position, for routes that do not affect the site of work. (Signals highlighted in Green) 9 24-Mar-14

Summary of guidance for PC/COSS/IWA Which position the points will be kept in to enable signals to be cleared for any unaffected routes The time required to complete the work The nature of the work and any additional protection that is required If Patrolling what direction they are walking towards. The IWA/COSS/PC will identify the location of work and where he is with the signaller The IWA/COSS/PC will request signal protection for the line they are planning to working on The IWA/COSS/PC and Signaller will agree which signals will be kept at danger to protect the activity The signaller and COSS/IWA/PC as part of the safety conversation must also discuss and agree any additional working arrangements for Level Crossings or other degraded working arrangements that may be affected by the work activity 10 24-Mar-14

Guidance - Pre-planned arrangements The IWA/COSS/PC, under normal circumstances, should have a documented safe system of work arrangements pack including the RT9909 and RT3181 forms. The pre-planned arrangements will be published, as appropriate, in either the; Weekly Operating Notices (WON) Signal Box Instructions or formal Signal Box agreements Signallers Daily list issued by the GZAC process The RT9909 and RT3181 forms will contain details required by TS1 and Handbook 8 regarding line (s) affected, location and nature of work and the protecting signal for each line that work is on The IWA/COSS/PC will not have a document that defines each signal that will be maintained at danger or route that will be set by the Signaller to protect the work area. 11 20-Mar-14

Guidance - IWA/COSS/PC RT3181 contents The IWA/COSS/PC, have an RT3181 form where the columns in Section 2 – Blocking the Line are currently headed as shown below… It is completed to the convention illustrated Provided that the actual work mileage area is totally within the limits shown on the RT3181 – the arrangements can be implemented during the safety conversation. The Signaller will determine any other signals to be maintained at danger or routes to be set with appropriate reminder devices fitted during the safety conversation. From Controlled Signal From C/O Points To defined Exit location Running Line A Running Line B (Uni directional line) From Controlled Signal From C/O Points From Controlled+BiDi Sig To defined Exit location Running Line C Running Line D (BI directional line) 12 20-Mar-14