Commission position on the introduction of CoP provisions for WLTP

Slides:



Advertisements
Similar presentations
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 70 th GRPE th January 2015 Geneva Chair: Petter.
Advertisements

Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 69 th GRPE 5-6 th June 2014 Geneva Chair Petter ÅSMAN.
Informal document GRPE st GRPE, 8-12 June 2015,
Informal Group on Gaseous Fuelled Vehicles (GFV) Report 64th GRPE June 2012 Informal document No. GRPE (64th GRPE, June 2012, agenda item 8 (a))
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 66 th GRPE 6-7 th June 2013 Geneva Chair Petter ÅSMAN.
Transposition of EURO VI requirements into UN/ECE R49 Status report GRPE 9-June 2011 Submitted by the expert of European Commission 1 Informal document.
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 72 nd GRPE th January 2016 Geneva Chair: Adolfo.
Informal document No. GRPE (72nd GRPE, January 2016,
Possible implementation of WLTP into a UN Regulation WP.29 Secretariat Informal document GRPE rd GRPE, 6-10 June 2016, agenda item 3(b)
WLTP Phase 2 Durability Task Force Update
Document No. WLTP-17-14e (WLTP IWG #17 – Geneva January 2017 )
WLTP Informal Working Group
Informal Group on Gaseous Fuelled Vehicles (GFV)
Informal Group on Gaseous Fuelled Vehicles (GFV)
WLTP Phase 2 Durability Task Force Update
1st Informal Group on WLTP Palais des Nations, Geneva
Electric Vehicles and the Environment (EVE IWG)
Transmitted by the IWVTA Informal Group
Transmitted by the IWVTA Informal Group
WLTP Informal Working Group
Note by the secretariat
WLTP Informal Working Group
Informal document GRPE-76-24
Report Task Force UNR46 5th Meeting OICA Paris, 26-27th September 2016
Transmitted by the IWVTA Informal Group
Informal document GRPE-75-18
Informal document No. GRPE (70th GRPE, January 2015, agenda item 3(b))
Informal document GRPE-77-21
Informal document GRPE-74-20
PN Levels in UN Regulation N°83.07
Note by the secretariat
Submitted by the experts of OICA
WLTP Informal Working Group
Informal document GRPE-78-14
IWVTA-GRPE Ambassador
Informal document GRPE Rev.1
Correlation Improvements
WLTP Informal Working Group
Discussion of OBD2 by “Correspondence Group” Japan’s proposal
Main subjects: priority 1, 2, 3
Informal document GRPE-78-23
WLTP-24-03e_UNR WLTP IWG 24th Session 18th -20th September 2018, Tokyo, Japan Update from WLTP Transposition Task Force September.
WLTP Phase 2 Presentation and discussion of the Term of Reference for the Durability Task Force Paris, April th WLTP IWG meeting DG GROW.C4.
Japan contributions on Transposition TF
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
Status report of TF-CS/OTA
WLTP Transposition – ‘new’ option for discussion
WLTP GTR 15 WLTP-09-18e Report by Drafting Coordinator, Serge Dubuc
Durability Task Force Update
WLTP Informal Working Group
WLTP Informal Working Group
Transmitted by the IWVTA Informal Group
Informal document GRPE-79-20
Request to GRPE for Approval of Prolongation of Mandate and
Informal document GRPE-79-19
Status Report Cop Taskforce
Informal document GRPE-79-11
Informal document GRPE-79-08e
Note by the secretariat
Informal document GRPE Rev.1
Adolfo Perujo (IWG chairman)
Development of new UNR WLTP and UNR83 08 series of amendments
Status report of OBD Task Force
WLTP-27-02e Informal document GRPE-79-xxe
Development of new UNR WLTP and UNR83 08 series of amendments
Japanese Stance on Candidates for IWVTA, Phase 2
UNECE WLTP COP task-Force Revision on testing Frequency
Transmitted by the experts of IWG ASEP
Informal document GRBP-70-23
Presentation transcript:

Commission position on the introduction of CoP provisions for WLTP Brussels, 12 Dec. 2018 DG GROW/C4

Background (1) The development of the Conformity of Production (CoP) provisions as one of the elements of Phase 2 of the WLTP IWG was agreed by the sponsors several years ago. The initial plan was to start a CoP Task Force (TF) already in 2016, however, due to the diesel emissions scandal and the extreme urgency for the Commission to act at European level, this had to be postponed. The CoP TF was finally activated at the 24th WLTP IWG meeting in Tokyo, which took place from 17-21 September 2018.

Background (2) In the meantime two important developments have occurred: The WLTP (including CoP) has been introduced in the European emission type approval legislation since 1st September 2017; The Transposition of the WLTP from the UNECE 1998 to the 1958 agreement was agreed by the sponsors and is currently ongoing. During the 24th WLTP IWG meeting in Tokyo, it was stressed by the chair of the Transposition TF that according to the 1958 Agreement, the CoP procedure is a necessary element for the transposition of the WLTP GTR into a UN Regulation WLTP.

Current situation (1) Regarding the Transposition project, the Commission has proposed to Japan to reconsider the timetable and agree on an extension of the project by one GRPE session. According to this Commission proposal, the informal UN R WLTP would be presented at the GRPE session of May 2019, together with the UN R 83 08 series. The working documents would be submitted by October 2019 for the GRPE session of January 2020.

Current situation (2) Even in the light of this postponement, which the Commission considers inevitable, the timetable for the completion of the Transposition project is quite tight and challenging. The following elements have to be worked out: GTR 15 and GTR 19 Level 2, level 1a, level 1b Approach for the Transposition UNR 83 08 Series CoP Durability

Current situation (3) Europe has already introduced WLTP in its Euro 6 emission type approval legislation since 1st September 2017. To do so, also the WLTP specific CoP provisions have been developed and introduced (which had not been developed in the GTR 15). The starting point was the CoP procedure in the UNR 83 and UNR 101, with all the necessary adaptation needed to move from the NEDC-based system to WLTP.

Commission proposal for the CoP In the light of the time schedule for the CoP and the Transposition project, and in the light of the work already done at European level, it would be highly inefficient to repeat such work. Therefore we propose that the CoP TF, using the European WLTP CoP as basis for the harmonised procedure, should proceed as follows: Assess the Japanese CoP procedure to identify similarities and differences; Collect existing CoP data to find the best solution where differences can be sorted out; Endeavour to propose a harmonised CoP procedure.

Questions?