Lecture was elaborated with the help of grant project of Ministry of Education, Youth and Sports, FRVŠ n. 2005 „Innovation of Subject Financing of Building.

Slides:



Advertisements
Similar presentations
General introduction to Community legislation in the field of Public procurement the classical sector – Directive 2004/18/EC Mr. Jari Kallio DG MARKT Directorate.
Advertisements

John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Contractors’ Day, June 2008 to the Framework Partnership Agreement & the Specific Grant Agreement Financial Guidelines for co-ordinators and co-partners.
1 FOREIGN INVESTMENT IN CUBA Republic of Slovenia October 15, 2013.
Geldy Saryev Head of Industry, Transport and Communications Financing Department of the Ministry of Finance of Turkmenistan.
Financial Assistance Workshop Contract versus Grant.
Ukraine - Externally financed project funds management, accounting and reporting State Treasury Service of Ukraine Director of Department of Methodology.
Model Rules on EU Administrative Procedures Book IV – Contracts Presentation for the ReNEUAL Conference 2014 EU Administrative Procedures – European Ombudsman.
Monitoring and Evaluation in Humanitarian Aid: Quality Procedures PROJECT – STRAND 1 – Training and Capacity Building.
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Construction Contracts and Project Delivery Methods
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
1 «Public Procurement System of the Republic of Azerbaijan» Elshad Samedzade PhD Web-site:
Purchasing Policy and Procedures Chapter 3. The Term “Policy”  Refers to set of purposes, principles, and rules of action that guide an organization.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems General Conditions of Contract and Special Conditions of Contract.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
Medical law and its place in the system of law and legislation in Ukraine. Legislative provision in healthcare in Ukraine.  The concept, object, method.
Tutorial:Business Academy Topic:Fixed Assets - Valuation Prepared by : Ing. Jana Šustrová Projekt Anglicky v odborných předmětech, CZ.1.07/1.3.09/
For a better built environment 1 By Mr Mfezeko Gwazube Built Environment Professions in South Africa 24 FEBRUARY 2011.
Instruction of NCP to Procurement and Small Scale Contracting funded from the EEA and Norwegian Funds Czech-Norwegian research programme CZ09.
RURAL CREDIT IN ROMANIA - PRE - ACCESION PERIOD- Brussels, January 27, 2011 MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
European models and practices in public financing of NGOs Nilda Bullain European Center for Not-for-Profit Law (ECNL)
An exposure to COMPLIANCE AUDIT By- Vishal Chawre DAG(A/c & VLC) O/o AG(A&E), Nagpur.
Chapter Financial Accounting versus Managerial Accounting Financial accounting is for external reporting Managerial accounting: Reports are generated.
METAC Workshop March 14-17, 2016 Beirut, Lebanon National Accounts Compilation Issues Session 8.2: Government final consumption expenditures.
Introduction to Management Accounting
Production tax.
CO-OPERATION IN CONSTRUCTION SECTOR CONSTRUCTION CONTRACTS Dr
LIMITED LIABILITY COMPANY
Financing projects on maritime domain
Contract Award Procedures
Content of Tender Dossier Instructions to Tenderers
FEASIBILITY ANALYSIS, PROJECT REPORT AND BUSINESS PLAN
Evaluation Grids Evaluation Grids.
Costs and Economics of Construction
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Workshop ESF and tendering 11 October 2006, Brussels Directive 2004/18/EC Tendering of public contracts Robert Wein, European Commission Disclaimer:
General government market/non-market distinction
ELECTRICAL ENGINEERING
Introduction of the Building Company’s Economy
Building completion insurance
Price of Building Work
Principles of Company’s Economy
THE EMPLOYER Right, of access to the site.
Comparison of Planned and Real State of Building Order
Labour
The Government Role in BOT
Building order returns and costs control
a. Financing b. Designing c. Construction d. Operating
Avv. Roberto Panetta LL.M. Ph.D. ISCL Secretary General
Andrea Sundstrand Associate Professor
Process of Building Order
Distribution, sale, marketing
Finances in the Building Company
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
TURKISH TAXATION SYSTEM
Principles of Company’s Economy
Introduction – Identification of Basic Bindings in the Company
Building Order Cash-Flow Management, Invoicing
Market and non-market output
Sources for Financing of Building Order
Lecture was elaborated with the help of grant project of Ministry of Education, Youth and Sports, FRVŠ n „Innovation of Subject Financing of Building.
The Role of Private Sector in Capital Budgeting
Financial Plan of Building Order
Property Management Depending on the Sources Difficulty
Accounting
Prices in Civil Engineering
GENERAL GOVERNMENT Marga Hüttner.
Presentation transcript:

Lecture was elaborated with the help of grant project of Ministry of Education, Youth and Sports, FRVŠ n. 2005 „Innovation of Subject Financing of Building Order“ Building Order

Subject of a Building Activity Activity of a building company is based on a realization of building orders Building order Supply of outputs, works and services for purpose of creating of new building object or adapting of an existing object A result of a building order realization can be: New building: newly created building object having a character of long-term tangible property and creating a compact or at least technically separate part of a building Reconstruction of an object: construction work including interference with building constructions Modernization of an object: construction work substituting existing parts of an object by more modern parts and increasing availability and usability of an building object Extension of an object: additional building 22.2.2019 Financing of Building Order

Kinds of Building Production Building production it is possible to divide into following kinds: Basic structural production Includes supplies of building works realized own workers or sub suppliers These supplies it is possible next to divide into following kinds of production: Main building production Includes supplies of building works realizes mainly on fabric (foundations, horizontal and vertical constructions etc.) Associated building production Includes professions and handcrafts Subsidiary production Includes preparation of resources and facilities needed for basic structural production, e.g. production of intermediate products and production of building materials 22.2.2019 Financing of Building Order

Kinds of Building Orders According to the Investor From the aspect of a investor character (or sources of financing) it is possible to distinguish following kinds of works: Public order (state or institutions of public and self administration (towns, regions) or other organizational parts of the state) Private order Individual orders (investors are usually in a form physical persons that don’t realize the order in the frame of own business activity) Orders in the frame of a business sphere (investor is in the form of private person that realize the order in the frame of own business activity) 22.2.2019 Financing of Building Order

Law n. 137/2006 Coll., about public orders • Public order is realized based on agreement between submitter (public institution) and one or more contractors. Subject of public order is the delivery of supplies, services or realization of building works. Public order is based on the written agreement (§7). The submitter can be public, endowed or sector Public submitter – the state, municipal authorities or allowance organizations financed by state Endowed submitter – physical person or corporation, which submits the public order financed from more then 50 % by public sources Sector submitter – person, which realizes one of relevant activities (e.g. gas industry, power supply, supply of heat or water) 22.2.2019 Financing of Building Order

Classification of Public Orders according to the Subject According to the subject are divided into: PO for supplies §8 PO for services §10 PO for building works §9 Public order for supplies: Its subject is the purchase of goods Public order for building works Its subject is the realization of building works including relevant project works and engineering activity Public order for services - PO, which is not PO for supplies or PO for building works 22.2.2019 Financing of Building Order

Classification of Public Orders According to the Supposed Value According to the supposed value are public order classified in following way: PO exceeding the limit PO not exceeding the limit PO of low extension Financial limit in the case of public orders is defined by implementing regulations, which define the financial limit according to the particular categories of submitters and according to the kind of public order. Supplies and services min. 2 000 000 CZK without VAT, building works min. 6 000 000 CZK without VAT not reaching the financial limit Less then 2 000 000 CZK without VAT in the case of supplies and services, less then 6 000 000 CZK without VAT in the case of building works No duty to award this kind of order according to the law The public order must not be divided into small parts with smaller extension 22.2.2019 Financing of Building Order

Procurement of Public Orders Law about Public Orders defines these kinds awarding procedures: Open proceedings § 27 Close proceedings § 28 Parley proceedings with declaration§ 29 Parley proceedings without declaration§ 34 Competition dialog § 35 Simplified proceedings § 38 22.2.2019 Financing of Building Order

Kinds of Awarding Procedures Kinds of procurement proceedings Open proceedings Submitter calls on unlimited amount of applicants for the submitting of an offer Close proceedings Submitter calls on unlimited amount of applicants for the submitting of an application and for the presentation of a qualification, applicants fulfilling defined conditions are called for submitting of offers Parley proceedings with declaration Submitter announces to unlimited amount of applicants the idea to submit the public order in this kind of proceedings Parley proceedings without declaration Submitter announces to limited amount of applicants the idea to submit the public order in this king of proceedings Competition dialog Submitting of difficult orders, where the submitter is not able directly to define technical conditions or legal or financial requirements Simplified proceedings Submitting of public orders not exceeding the financial limit (in the case of building works deliveries not exceeding 20 mil. CZK) 22.2.2019 Financing of Building Order

Financing of Building Order Qualifying Criteria Qualifying criteria are: Basic qualification criteria No arrears of taxes Clean conduct-book No arrears of health and social insurance Not to be in the bankruptcy Professional qualification criteria Extract from Company Register Business license Economic and financial qualification criteria Balance sheet from past periods Amount of returns Insurance agreement (insurance of responsibility for lost caused to another person) Technical qualification criteria Reference buildings 22.2.2019 Financing of Building Order

Criteria for Submitting of Public Order Basic criterions for valuation of particular offers: Economic merit of the offer The lowest offering price The decision making according to the economic merit of the offer: The offer is valuated according to the particular criterions solved by submitter The submitter must define for each criterion scales usually expressed in % One of the criterion must be every time the offering price, next criterions are mostly: Operating costs Requirements for the maintenance Technical, quality, ecological and functional characteristics of the subject of the order 22.2.2019 Financing of Building Order

Submitting of Private Orders Tender, which features (the process, criteria, etc.) are chosen by investor (submitter) on his own For trouble free process of the (building) order must be concluded the contract for work created according to the Civil or Business Code 22.2.2019 Financing of Building Order

Financing of Building Order Contract for Work Price is agreed in the agreement about price mentioned in the contract for work Parties to contract are investor (buyer) and supplier Contract is agreed in the sense of the business code (law n. 513/1991 Coll.) Terms of contract for work: I. Parties to contract – investor, supplier II. Subject of delivery – building object, building work III. Time of delivery – time of finishing of the delivery IV. Price of delivery V. Payment conditions – the way of paying for deliveries VI. Qualitative and technical conditions VII. Realization of work VIII. Handover and takeover of building object – way of handover IX. Responsibility for defects, guarantee, warranty claims X. Avoidance of contract XI. Sanctions XII. Next agreements 22.2.2019 Financing of Building Order

Financial Difficulty of the Building Order, Budget Costs for building part are calculated as a sum of costs: for particular building works materials not included in the building work (valuated as a specification) shift with materials For calculation is prepared the item budget 22.2.2019 Financing of Building Order

Overview of Groups of Building Sections Number Title of group of building sections General construction and works 1 Earthworks 2 Foundations, special foundations 3 Vertical and complete constructions 4 Horizontal constructions 5 Communications 6 Construction of surfaces, floors 7 Associated building production (handcrafts, installations) 8 Pipage, conduction 9 Finishing works, demolitions 22.2.2019 Financing of Building Order

Item of Budget of Building Part Numeral code of item (Classification of Building Constructions and Works) Description of item Measure unit Amount of item in measure unit Unit price in e.g. CZK per measure unit Totally per item Unit weight in tons Weight in tons totally per one item 22.2.2019 Financing of Building Order

Financing of Building Order 22.2.2019 Financing of Building Order

Costing Model (Formula) Unit price of building work Direct costs (DC): Direct material (M) Direct wages (W) Other direct costs (ODC) Machines and machinery (S) Indirect costs (IC): Overhead product costs (OPC) Overhead administrative costs (OAC) Profit (P) Price totally 22.2.2019 Financing of Building Order