© November, 2001 LeBlond and Associates, LLC Overview of a Training Program Produced by LeBlond & Associates, LLC Thanks for taking the time to view this.

Slides:



Advertisements
Similar presentations
1 Welcome Safety Regulatory Function Handbook April 2006.
Advertisements

3rd Module: Information Systems Strategy and Planning:
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Important Points The SWF stands for Standard Workload Form. Workload is covered by Article 11 in the collective agreement. Your SWF is your personal contract.
© May, 2002 LeBlond and Associates, LLC Overview of a Training Program Produced by LeBlond & Associates, LLC Thanks for taking the time to view this presentation.
WHAT IS STEAM PRO? Thermoflow, Inc.
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
© May, 2003 LeBlond and Associates, LLC Training Program Overview Produced by LeBlond & Associates, LLC Thanks for taking the time to view this presentation.
The new way to train installers Fireplace Installer Training System Click to advance. Hit ESC to end show, or right click to navigate to a certain slide.
Radiopharmaceutical Production
Creating and Submitting a Necessary Wayleave Application
IAEA International Atomic Energy Agency Simulators in an e-learning platform D. Beraha.
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
Team 6 Lesson 3 Gary J Brumbelow Matt DeMonbrun Elias Lopez Rita Martin.
Mentor’s Guideposts An Online Mentor’s Guide to eLearning.
What is GT MASTER WHAT IS GT MASTER? Thermoflow, Inc.
What is GT MASTER While GT PRO is the design program for combined cycles, GT MASTER is the corresponding simulation program for off-design calculations.
Introduction to OBIEE:
WHAT IS GT PRO? Thermoflow Inc.
Job Analysis Background Research 1)Organizational charts (e.g., how the job is connected to other positions and where it is located in the overall company)
What is STEAM MASTER While STEAM PRO is the design program for conventional steam cycle plants, STEAM MASTER is the associated simulation program for off-design.
© November, 2001 LeBlond and Associates, LLC Training Program Overview Produced by LeBlond & Associates, LLC Thanks for taking the time to view this presentation.
© April, 2005 LeBlond and Associates, LLC Overview of a Training Program Produced by LeBlond & Associates, LLC Thanks for taking the time to view this.
Objectives Learn how to implement the sequential search algorithm Explore how to sort an array using the selection sort algorithm Learn how to implement.
STEAM PRO is a highly automated system design tool – a heat balance program specifically intended for design of steam power cycles.  Use STEAM PRO to.
Simulation Walk Through Seeing how a simulation could work on your course.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
BASIC IRRS TRAINING Lecture 7
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
Simulation Walk Through See how your learners might use a simulation on your course.
First Steps in Modularization Simple Program Design Third Edition A Step-by-Step Approach 8.
Microsoft ® Office Project 2007 Training Linking Project tasks [Your company name] presents:
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
First Steps in Modularization. Simple Program Design, Fourth Edition Chapter 8 2 Objectives In this chapter you will be able to: Introduce modularization.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
1 NEI Process Discussion. 2 Topics for Discussion Relationship to NFPA 805 Relationship to Regulatory Guide Technical Process currently in NEI
First Steps in Modularization. Simple Program Design, Fourth Edition Chapter 8 2 Objectives In this chapter you will be able to: Introduce modularization.
1 Impact of Revised 10 CFR 50.46(b) ECCS Acceptance Criteria 2009 Regulatory Information Conference Rockville, MD March 12, 2009 Mitch Nissley Westinghouse.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
California Community Colleges Chancellor’s Office Quality Distance Education Webinar Attendance Accounting And Reporting for Distance Education Courses.
Onsite Quarterly Meeting SIPP PIPs June 13, 2012 Presenter: Christy Hormann, LMSW, CPHQ Project Leader-PIP Team.
METHODS PLANNING. Methods Class 4 Agenda 1. Overview of Ontario Curriculum Documents 2. Introduce lesson plan formats – GPF & APF 3. Sequence for planning.
For more course tutorials visit ACC 492Entire Course For more course tutorials visit ACC 492 Week 1 Individual Assignment.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
Training Course on Integrated Management System for Regulatory Body
IAEA E-learning Program
Hiring Center An Inside Look… Your inside look at the hiring center.
Risk Assessment Methodology
(Additional materials)
Instructional Design Gibran Carter.
Project Management Process Groups
2020 Census Local Update of Census Addresses Operation (LUCA)
Temporary Alterations in Support of Maintenance and Temporary Modifications Beth Kernes Krause - Cooper Station February 24, 2019 Cleveland 2005.
TRTR Briefing September 2013
Command Maintenance Discipline Program (CMDP) Overview
Final Design Authorization
MAIN MENU 1. Introduction 2. Unit Info 3. Unit Overview 4. Subtasks
MAIN MENU 1. Introduction 2. Unit Info 3. Unit Overview 4. Subtasks
Kingdom of Saudi Arabia
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Command Maintenance Discipline Program (CMDP) Overview
Radiopharmaceutical Production
Presentation transcript:

© November, 2001 LeBlond and Associates, LLC Overview of a Training Program Produced by LeBlond & Associates, LLC Thanks for taking the time to view this presentation –Its about ten minutes long This presentation will advance automatically until you see this symbol –which means click to advance Click on this when you are ready to proceed

© November, 2001 LeBlond and Associates, LLC The Use and Control of Analytical Methods in accordance with 10 CFR Developed and Presented by LeBlond and Associates, LLC

© November, 2001 LeBlond and Associates, LLC Contents of This Presentation (color coded by topic) What is the intended student population? How is the course structured? What is the current delivery schedule?

© November, 2001 LeBlond and Associates, LLC What is the intended student population? This course is intended for personnel who: –Perform Safety Analyses –Review or control the vendor who performs the Safety Analyses –Perform or review any portion of the core reload process –Licensing personnel who are charged with identifying the need for NRC submittals and preparing them, if necessary and –the supervision of the personnel above. This is intended to be a Master-Level class Potential student population is typically limited to 20 to 25 personnel per site

© November, 2001 LeBlond and Associates, LLC Overall Course Goal The use of analytical methods in the design and licensing of Nuclear Power Plants is a specialized skill The application of 10 CFR 50.59, and specifically criterion eight, to these methods is a source of confusion This course is intended to eliminate this confusion. The actual course slides introducing the Course Objectives follow.

© November, 2001 LeBlond and Associates, LLC Course Objectives 1. Overview the major segments of 10 CFR Sorted by: Applicability Screening Evaluation 2. Describe the screening process 3. Define and Identify a Design Function 4. Define and Identify the term Affects 5. Define the use of PRA techniques to support 10 CFR Evaluations 6. Define Minimal for dose consequences

© November, 2001 LeBlond and Associates, LLC Course Objectives (cont.) 7. Define and Identify when a Design Basis Limit for a Fission Product Barrier (DBLFPB) has been exceeded or altered 8. Define a Method of Evaluation and Input Parameter 9. Define and Identify when a Departure from a methodology… has occurred 10. Identify techniques for the creation of operating margin 11. Identify the restrictions on the creation of operating margin 12. Identify the conditions when a non-NRC approved method may be implemented. Click to Advance to How is this course structured?

© November, 2001 LeBlond and Associates, LLC How is this course structured? The course is one and a-half days in length The course briefly overviews the entire 10 CFR process to establish and ensure a frame of reference –Typically less than one hour The guidance provided in NEI 96-07, or the USA Resource Manual, is used to develop key points The fundamentals of the Screening Process are systematically developed in detail … –Design Function –Facility as described in the FSAR –Adverse affects with emphasis on the application to analytical methods

© November, 2001 LeBlond and Associates, LLC How is this course structured? (Cont.) The details of 10 CFR c(2) vii and viii are covered The information above is used to develop Summary Flowcharts for: –Input Parameters versus Method of Evaluation and –The Screening Process and –The Evaluation Process in accordance with Criterion eight

© November, 2001 LeBlond and Associates, LLC How are the Summary Flowcharts used? Three detailed examples have been developed. These examples –illustrate the learning objectives –provide a forum for answering student questions –require about four to five hours on the first day The Summary Flowcharts illustrate the three examples –The course teaches the students to use the Summary Flowcharts on their own The second day is dedicated solely to review pre- prepared exercises and any situations the students wish to resolve –Students typically can answer their own questions on day #2 Click here to view a few simple, selected course slides

© November, 2001 LeBlond and Associates, LLC Examples to Illustrate Departure From a Method of Evaluation? Changes to Structural Heat Sink Model - Example #2 –Illustration of the creation of operating margin Restrictions Flexibility/techniques Use of Non-NRC Approved Codes - Example #3 – Codes/methods Not described in the UFSAR –Solely used for design analysis Described in the UFSAR –No creation of margin –Not part of the facility as described … These are two of the illustrative examples.

© November, 2001 LeBlond and Associates, LLC Example #2 Change to Structural Heat Sink Model Comanche Peak has recovered their containment liner with the coating described in Example #1. This was inadvertently treated as a simple maintenance activity. Now the liner recoating is complete and the calculations described in Example #2 have subsequently shown that the maximum, post-accident containment pressure is over the containment design limit by 0.3 psig. Their current outage is scheduled to be complete in three weeks, making any extensive licensing action problematic. As a result, Westinghouse Electric Company, LLC has been contacted for their assistance. The examples consist of a series of questions and answers that illustrate the learning objectives. The answers are presented separately from the questions in blue font.

© November, 2001 LeBlond and Associates, LLC Step #3 Under what conditions, if any, can margin be created to resolve Comanche Peaks concerns? The flowchart on the next slide summarizes the overall process. This example will explore both the flexibility and the restrictions associated with the new 10 CFR process. A summary of these features and where they will be illustrated follows the flowchart. This refers to one of the Summary Flowcharts previously described.

© November, 2001 LeBlond and Associates, LLC The flexibility/techniques for creating margin that will be explored here are: Step #4 Altering the value of an Input Parameter to produce more conservative results. Step #7 Altering an element of a method of evaluation, but not adversely. Steps #9 and #10 Implementing an entirely new method that has been approved by the NRC for the intended application. Each of these steps/questions is intended to promote extensive discussion of the application of the learning objectives.

© November, 2001 LeBlond and Associates, LLC The restrictions on the creation of margin that will be explored are: Step #5 Conditions when the selection of an Input Parameter is part of the Method of Evaluation. Step #6 Changing any of the elements of a method unless the results are conservative or essentially the same. Step #8 Identification of an adverse alteration to a Method of Evaluation. Steps #9 and #10 Conditions that constitute approved by the NRC….

© November, 2001 LeBlond and Associates, LLC The next two slides are one of the question/answer combinations from Example #2.

© November, 2001 LeBlond and Associates, LLC Step #4 A review of the the major containment structures and components has identified that the concrete missile blocks that sit on top of the CRD booster fans, pressurizer coffin, and the Reactor Coolant Pumps have not been included in the structural heat loss calculations. Specifically, a comparison of the actual analysis inputs, Table , and a field walk-down has identified these blocks. Can they be included in the structural heat loss calculation to reduce the peak pressure? Should they be evaluated as Input Parameters or as a Method of Evaluation? To Input Parameters vs Method of Evaluation flowchart This refers to another of the Summary Flowcharts.

© November, 2001 LeBlond and Associates, LLC Yes. They can be included. The modeling of the concrete blocks would qualify as altering an Input Parameter. There is no discussion in UFSAR Section (page 6.2.5) regarding the extent, or absence, of modeling these blocks. Contrast that wording with the language of Section (page ). In that section, the assertion is made that the selection of surface areas and thicknesses were … conservatively high. The calculation being described in is intended to result in the smallest peak pressure. Note that in all cases, 10 CFR 50, Appendix B, Criterion 3 would apply. That is, these are all Quality, Design Bases calculations that require the use of accurate information. This includes use of calculations to develop the value of the Input Parameter. (Calculations may be used to determine the value of an Input Parameter.) Note that the thermal properties of the coating itself may also hold some potential for refinement here.

© November, 2001 LeBlond and Associates, LLC The preceding slides are indicative of the courses level of detail. The examples are used to promote detailed discussion on the learning objectives. The second day is used to continue that process, with a combination of pre-prepared classroom exercises and student concerns/questions. Click here to advance to What is the current delivery schedule?

© November, 2001 LeBlond and Associates, LLC What is the current delivery schedule? This class typically can be delivered at your site within four weeks.

© November, 2001 LeBlond and Associates, LLC Closure Thanks again for your interest and time For any questions or further details, contact Peter LeBlond at: – or Just click anywhere to end the show