Discussion on Mod262 and next steps

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Xoserve Services Workgroup. xoserve Funding Arrangements - Model Comparison ModelKey Benefits User Pays Model AUser Pays Model B Baseline Services (Core)
User Pays Funding – Potential Licence Mechanism Simon Trivella – January 21 st 2010 Governance Workstream.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas emergency cash-out Ofgem perspective Transmission Workstream - 3 July 2008.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
Mark Dalton 4 February 2010 Transmission Workstream Discussion slides.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
Force Majeure Existing FM situation: Up to 200GWh/d capacity shortfall due to the rejection of NG’s planning application for a PRI in Corse / Tirley area.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Transmission Workstream 6 January 2011
Proposer: Matthew Hatch Panel Date: 20/10/16
User Pays Funding – Potential Licence Mechanism
Transmission Workgroup 4th October 2012
Transmission Workstream 4th July 2007
Incentives 26 September 2018.
NTS Entry Charging Review Update
Exit Capacity Substitution and Revision
UNC 0621L: Amendments to Gas Transmission Charging Regime
The Necessary Criteria for a UNC Modification Proposal
Transmission Workgroup June 7th 2012
Potential Alternative Proposal – Interaction with Electricity Capacity Market 23 January 2018.
Development of Entry Capacity Substitution
QSEC auction timetable
Proposer: Marie Clark, ScottishPower Panel Date: 7 February 2014
DN Interruption & Charging
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
MOD Deemed applications – User pays initial thoughts.
UNC Transmission Workstream 7th December 2006
Transmission Workstream 2nd December 2010
UNC 0621L: Amendments to Gas Transmission Charging Regime
Entry Capacity Transfer and Trade
Entry Overrun Calculation
Options for the Development of a Demand Side Response Mechanism
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Ofgem presentation to Gas Transmission Workstream
User Pays Principles and Governance
Transmission Workstream 1st February 2007
195AV “Future work” – system flexibility
Commercial Arrangements For Gas Quality Service – Introduction
Exit Overruns in the Enduring Regime
Transmission Workstream 05 November 2009
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Presentation transcript:

Discussion on Mod262 and next steps Seeking guidance from Modification Panel members 17 December 2009

What it was trying to achieve? Rationale for Mod 262 What it was trying to achieve? Apply the principle that shippers should not have to pay for capacity that can’t be provided due to FM. Application to all circumstances of FM at Entry and Exit Simple, pro-rated mechanism to reduce capacity holding Cost was to be smeared via SO or TO Commodity cost Why was it rejected? Was not considered to benefit consumers No challenge mechanism for the NGG issuing an FM Notice No incentive for NGG to sort out FM in a timely manner if there is an automatic redistribution of charges Leakage of costs from Entry to Exit Is it correct that NGG faces no FM risk?

Areas to consider – principles Principles to consider Should customers pay for a service unavailable due to FM? Is that normal commercial practice? FM terms in UNC are weighted heavily in NGG’s favour NGG should not benefit from calling FM Appropriate tension between declaration of FM and shipper challenge to that FM. Need to consider changes to UNC and Licence Will minor changes to Licence be made outside TPCR ?

Amendment to FM provisions Potential solutions Consider change to the definition of Capacity so that it excludes capacity impacted FM. Ensuring that it is properly targeted (unintended consequences) How will NGG be compensated for lost revenues? Incoming adjusting event? NGG to prove FM case Amendment to FM provisions More equitable terms Applies to future instances of FM – doesn’t resolve this case Route via System Management Principles Statement? NGG need to use Buyback to resolve capacity constraints?

17/12 Obtain opinion of Panel Way forward 17/12 Obtain opinion of Panel Guidance on best way of dealing with this issue Formalise Transparency requirement? Changing capacity definition? Considered pitfalls with this approach? Other suggestions on tackling this? 7/1/2010 Discussion at Transmission Workstream Development within TW rather than separate workstream Q2 2010 Seeking new arrangements in place