Project Management The Gantt Chart. What is a Gantt Chart? Gantt charts are a type of bar chart used to monitor the progress of a project. Each element.
Advertisements

GANTT CHART DecemberJanuary February Week 3Week 4Week 5Week 6Week 7 Week 8 First Discussion : Outline of the research (Introduction, research.
Presenter: Kenny Haulk
Gigabit Ethernet PMD Opto-Link, Inc. – Progress Summary Vinh Nguyen, Clifton Kerr, Andrew Meyerson, Bryan Justice April 21, 2005.
Senior Design Project: Group IV Gigabit Ethernet Optical Transceiver Group Members: Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135. Opto-Electronics Design Project Spring 2006.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 1 Vinh Nguyen January 9, 2005.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Presenter: Nassisa-Geda Techane. 2 This Week’s Highlights The optical link budget almost finished Website up on the ECE domainWebsite Yahoo Group set.
YUSEND Communication System Design Update ENG February 11, 2009.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
ECE4006 Group 6 – Presentation 1 Division of Labor – Vikas Parekh – Group management, project schedule manager, background studies. Gautum Khanna – Analog.
Presenter: Kenny Haulk. 2 This Week’s Highlights Tested Receiver with attenuation and shielding Measured power output from GDS1250 TX and our own VCSEL.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board continued  Order components for.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 5 Vinh Nguyen February 24, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Group 2 - Project Update Feb Tyler Helble.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
ECE Group 2 – Presentation 8
ECE 135 – BtrLaytDanNvr Presentation 7
Optical Gigabit Ethernet
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
CMGT 575 Education Begins / tutorialrank.com. CMGT 575 All Assignments For more course tutorials visit CMGT 575 Week 2 Individual.
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
إعداد د/زينب عبد الحافظ أستاذ مساعد بقسم الاقتصاد المنزلي
Melanie Garrick Barry Mullins Nihar Patel Jason Young
Presenter: Chris Lambrecht
ECE 135 – Group 3 Presentation 1-2
Presenter: Allen Duncan
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
ECE 4006 Group 6 – Presentation 8
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Project GabE ECE 135 – Spring 2005
ECE135 Group 2 – Presentation 3
Capstone Design Update
ECE 135 – VCSEL Kings Presentation 5
Optical Gigabit Ethernet
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
GROUP 1 FINAL PRESENTATION
Research Paper Overview.
GIGABIT ETHERNET DESIGN ECE Spring 2004
Task List Group management plan Background studies
Gigabit Ethernet Design ECE – Spring 2004
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

Status Presentation February 20-27, 2003 Michelle Middleton

Overview – Gantt Chart February 20th

Overview – Gantt Chart February 27th

Progress this Week • Added power filter to schematic • Had preliminary layout review • Finalized layout with power filter added • Tested receiver board with variable attenuator • Ordered and received more parts • Outlined first paper and assigned tasks

Transceiver Schematic – 2/20

Transceiver Schematic – 2/25

Transceiver Schematic – 2/27 Sources for power supply filter: E2O GBIC App Note, pages 4-5, Delta Electronics Spec., page 4

Board Layout

Receiver Board Testing – 0 dB K28.5 K28.7 PRBS7

Receiver Board Testing – 10 dB K28.5 K28.7 PRBS7

Receiver Board Testing – 20 dB K28.5 K28.7 PRBS7

Receiver Board Testing – 30 dB K28.5 K28.7 PRBS7

Receiver Board Testing – 40 dB K28.5 K28.7 PRBS7

Receiver Board Testing – 50 dB K28.5 K28.7 PRBS7

Receiver Board Testing – 60 dB K28.5 K28.7 PRBS7

Receiver Board Testing – 70 dB K28.5 K28.7 PRBS7

Receiver Board Testing Results • Best results for all at 10 dB attenuation • K28.5 and PRBS7 have increased jitter at 0 dB • Jitter increases for all tests at 50 dB • All close above 50 dB

Parts Ordered and Received All Parts ordered for first board assembly Parts Received • VCSEL: Optek OPV210 • PD: Optek OPF420

First Paper Outline Abstract Introduction Project Specifications Background Information Group Organization Receiver Test Board Optical Link Budget Transceiver Design Schematics Layout Testing Results Conclusions

Plan for Next Two Weeks Send board out for fabrication Receive all parts needed for first assembly Assemble first transceiver board design Write individual portions of first paper Compile complete rough draft