Adequate tethered tools

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Beware of hazards around you
Always use the correct lifting equipment
PDO Second Alert What happened? Your learning from this incident..
Always use mechanical handling aids when carrying out a heavy lift
Ensure a safety briefing is given where appropriate
Always ensure travelling block is stationary during DM changeover
No Removal of cellar frames by hands
Always stay alert while driving, and observe other drivers behaviour
Always use 3 points of contact when using ladders
Always stay out of the line of fire
Never place yourself in line of fire
PDO Second Alert Date: Incident title: Fall from Height
PDO Second Alert Stay out of the line of fire What happened:
Drive with appropriate speed to road conditions
Use right tools for the job and use them correctly
PDO Second Alert Date: Incident type: LTI What happened?
Always wear fall protection equipment when working at height
Avoid taking shortcuts
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
PDO Second Alert What happened?
PDO Second Alert What happened? Your learning from this incident..
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the right equipment for the task !!!!
Always follow Night driving rules
Ensure 3 point contact maintained whilst using ladder
Follow the rules to save a life
Ensure OHL Clearance required for your lifting activity
PDO Second Alert Date: Incident Type: LTI What happened?
No hands on elevator while delivering pipe
PDO Second Alert What happened? Your learning from this incident..
Never put your Hands in line of fire
Always stay out of the line of fire
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: Fatality What happened?
PDO Second Alert Date: Incident title: LTI What happened?
PDO Second Alert Photo explaining what was done wrong
PDO Second Alert Always follow the PTW procedures
Always ensure straight lifting
Pay attention to your footing
Crane operating with boom lowered and under Supervision
Always report Near Misses
PDO Second Alert Date: Incident title: HiPo Asset Damage
Always use secondary retention
Never place yourself in “line of fire”
Always use your hands to set the slips
Always assess the risks, Stop and think.
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Date: Incident title: HiPo What happened?
Your health is your responsibility
Always ensure “no go” zone are in place
PDO Second Alert Date: Incident title: MVI Rollover
Check equipment prior to start the job
PDO Second Alert Photo explaining what was done wrong
Seek assistance of Banksman while reversing the vehicle
Use only certified lifting equipment in good condition
Safe distance from the edge Maintain a safe distance while driving
Always keep your equipment maintained
Always adhere to Red/No Go zones
SHORTCUT ROAD DRIVING IS DANGEROUS
Keep away from “Line of Fire”
Always position the crane boom correctly before slinging the casing
Keep away from the line of fire
Beware of raised edges of walk ways.
Keep hands out of the line of fire
Use hands-off where possible
Maintain Healthy Diet Along With Good Physical Exercise
Presentation transcript:

Adequate tethered tools PDO Second Alert Photo from CCTV Date:17.02.18 Incident title : High Value Learning What happened? Adjustable spanner weighing 450 grams, fell from 18 meters height to the rotatory area, while the Derrickman was tightening a hydraulic hose below the monkey board. A third party employee was working on the tubing hanger in rotary area at the time of incident close to where the spanner landed. No Injury or Damage from this incident. Your learning from this incident.. Coordinate with supervisor (area authority) prior to start any task Always use tethered tools while working at height and ensure it is recorded in the register All non routine work at height shall be under PTW Always ensure zone management is strictly followed Dropped spanner Use certified tethered tools while working at height Adequate tethered tools

Management self audit Confirm the following: Date:17.02.18 Incident title : High Value Learning As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure staff use tethered tools and recorded in the temporary tools register while working at height? Do you ensure staff use the audit to identify the behaviors while working at heights? Do you ensure staff use of PTW while working at heights? Do you ensure staff identify the hazards and risks related to working at heights and capture in the TBT with TRIC? Do you use CCTV to monitor red zone management at the site? Do you ensure risk assessment performed and controls implemented while simultaneous operations? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.