CHAPTER 17 Process Costing Spoilage, Rework, and Scrap.

Slides:



Advertisements
Similar presentations
© 2009 Pearson Prentice Hall. All rights reserved. Process Costing.
Advertisements

Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Managerial Accounting Wild and Shaw Third Edition Wild and Shaw Third Edition McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All.
Financial and Managerial Accounting John J. Wild Third Edition John J. Wild Third Edition McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies,
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Spoilage, Rework, and Scrap Chapter 18.
Spoilage, Rework, and Scrap
Systems Design: Process Costing
Process Costing Dr. Baldwin University of Arkansas – Fort Smith Fall 2010.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Spoilage, Rework, and Scrap Chapter 18.
Contrôle Interne Avancé-HEC Lausanne-2007/2008 CHAPTER 17 Process Costing.
CHAPTER 18 Spoilage, Rework, and Scrap To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education. All rights.
CHAPTER 17 Process Costing To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education. All rights reserved.
19 Costing Systems: Process Costing Principles of Accounting 12e
Copyright © 2015 Pearson Education, Inc. All Rights Reserved. Spoilage, Rework, and Scrap.
CHAPTER 17 Process Costing.
Process-Costing Systems
Principles of Cost Accounting, 16th Edition, Edward J
Chapter 6 Process Cost Accounting
© 2012 Pearson Prentice Hall. All rights reserved. Spoilage, Rework, and Scrap.
© 2012 Pearson Prentice Hall. All rights reserved. Process Costing.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 8 Process-Costing Systems.
19-1 P ROCESS C OST S YSTEMS CHAPTER F Used for production of small, identical, low-cost items. F Mass produced in automated continuous production.
Management Accounting
Process Costing Dr. Hisham Madi. Process Costing  Process-costing systems are used when companies produce a large quantity of identical or very similar.
Fixed Overhead Variance Spoilage, Rework and Scrap
Spoilage, Rework, and Scrap Dr. Hisham Madi. Inspection Points and Allocating Costs of Normal Spoilage  Although spoilage is typically detected only.
Chapter 18 Process Costing
© 2012 Pearson Prentice Hall. All rights reserved. Spoilage, Rework, and Scrap.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall. Process Costing Chapter5 1.
Process Costing Dr. Hisham Madi. Case 3: Process Costing with Some Beginning and Some Ending Work-in-Process Inventory.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fifth Edition Wild, Shaw, and Chiappetta Fifth Edition McGraw-Hill/Irwin Copyright © 2013.
Process Costing Lecture 13 1 Readings Chapter 17,Cost Accounting, Managerial Emphasis, 14 th edition by Horengren Chapter 4, Managerial Accounting 12 th.
Chapter 5 Process costing and operation costing 5-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a Management Accounting 5e by Langfield-Smith.
Management Accounting BA213 Michael Dimond. Michael Dimond School of Business Administration Costing Methods Process Costing Job Costing Activity-based.
The Islamic University –Gaza
© 2009 Pearson Prentice Hall. All rights reserved. Spoilage, Rework, and Scrap.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
Process Cost Accounting General Procedures
Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 8 Process-Costing Systems.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide Process Costing.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Spoilage, Rework, and Scrap Chapter 18.
Spoilage, Rework, and Scrap 1. Learning Objective 1 Distinguish among spoilage, rework, and scrap. 2.
Chapter 18 Process Costing. Describe the flow of costs through a process costing system 18-2.
Spoilage, Rework and Scrap 1 Lecture 24 Readings Chapter 18,Cost Accounting, Managerial Emphasis, 14 th edition by Horengren.
Process Costing.
Chapter 11 Process Costing. Chapter 11 Process Costing.
Chapter 4 Chapter 3 Job Order Costing Job Order Costing.
Chapter 17 Process Costing.
Chapter 6 Process Costing
Process Costing and Hybrid Product-Costing Systems
Job-Costing and Process-Costing Systems
Process Costing and Hybrid Product- Costing Systems
CHAPTER 17 Process Costing.
Process Costing CHAPTER 4.
Process Costing Lecture 4. Process Costing Lecture 4.
Process costing and operation costing
Process Costing ACCTG 404 ACCTG 404 Huddart.
The Islamic University –Gaza
CHAPTER 17 Process Costing Edited by Dr. Charles Bailey for ACCT7310.
Principles of Cost Accounting 15th edition
CHAPTER 17 Process Costing.
Systems Design: Process Costing
November 13-16, 2015 Process Costing
CHAPTER 17 Process Costing.
Chapter 18 Spoilage, Rework and Scrap
CHAPTER 4 Job Costing Chapter 18 Spoilage, Rework, and Scrap
Chapter 6 Process Cost Accounting
Principles of Cost Accounting 15th edition
Presentation transcript:

CHAPTER 17 Process Costing Spoilage, Rework, and Scrap

Job versus Process Costing Job-Costing Systems Distinct, identifiable units of a product or service Examples: Custom-made machines, houses Process-Costing Systems Masses of identical or similar units of a product or service Examples: Food, chemical processing

Process Costing Process costing is a system where the unit cost of a product or service is obtained by assigning total costs to many identical or similar units. Each unit receives the same or similar amounts of direct materials costs, direct labor costs, and manufacturing overhead. Unit costs are computed by dividing total costs incurred by the number of units of output from the production process. 3

General Ledger Cost Flows Illustrated

Process-Costing Assumptions Direct materials are added at the beginning of the production process, or at the start of work in a subsequent department down the assembly line. Conversion costs are added equally along the production process.

Five-Step Process-Costing Allocation Summarize the flow of physical units of output. Compute output in terms of equivalent units. Summarize total costs to account for . Compute cost per equivalent unit. Assign total costs to units completed and to units in ending work-in-process.

Equivalent Units A derived amount of output units that: Takes the quantity of each input in units completed and in unfinished units of work in process and Converts the quantity of input into the amount of completed output units that could be produced with that quantity of input Are calculated separately for each input (direct materials and conversion cost) When calculating equivalent units in step 2, focus on quantities and disregard dollar amounts until after the equivalent units are computed

Steps 1 and 2 Illustrated

Steps 3, 4, and 5, Illustrated

Weighted-Average Process-Costing Method Calculates cost per equivalent unit of all work done to date (regardless of the accounting period in which it was done) Assigns this cost to equivalent units completed and transferred out of the process, and to incomplete units in still-in-process

Weighted-Average Process-Costing Method Weighted-average costs is the total of all costs in the work-in-process account divided by the total equivalent units of work done to date. The beginning balance of the work-in-process account (work done in a prior period) is blended in with current period costs.

Steps 1 and 2 Illustrated

Steps 3, 4, and 5 Illustrated

Result of the Process Two critical figures arise out of step 5 of the cost allocation process: The amount of the journal entry transferring the allocated cost of units completed and sent from work-in-process inventory to finished goods inventory The ending balance of the work-in-process inventory account that will appear on the balance sheet

First-in, First-Out Process-Costing Method Assigns the cost of the previous accounting period’s equivalent units in beginning work-in-process inventory to the first units completed and transferred out of the process Assigns the cost of equivalent units worked on during the current period first to complete beginning inventory, next to stat and complete new units, and lastly to units in ending work-in-process inventory

First-in, First-Out Process-Costing Method A distinctive feature of FIFO process-costing method is that work done on beginning inventory is kept separate from work done in the current period.

Steps 1 and 2, Illustrated

Steps 3, 4, and 5, Illustrated

Result of the Process (As Before) Two critical figures arise out of step 5 of the cost-allocation process: The amount of the journal entry transferring the allocated cost of units completed and sent from work-in-process inventory to finished goods inventory The ending balance of the work-in-process inventory account that will appear on the balance sheet

Transferred-In Costs Are costs incurred in previous departments that are carried forward as the products cost when it moves to a subsequent process in the production cycle. Also called previous department costs. Journal entries are made to mirror the progress in production from department to department. Transferred-in costs are treated as if they are a separate type of direct material added at the beginning of the process.

Steps 1 and 2, Illustrated

Steps 3, 4, and 5, Illustrated

Steps 1 and 2, Illustrated

Steps 3, 4, and 5, Illustrated

Hybrid Costing Systems A Hybrid-costing system blends characteristics from both job-costing and process-costing systems. Many actual production systems are in fact hybrids. Examples include manufacturers of televisions, dishwashers, and washing machines, as well as Adidas.

Spoilage, Rework, and Scrap CHAPTER 18 Spoilage, Rework, and Scrap

Basic Terminology Spoilage—units of production, either fully or partially completed, that do not meet the specifications required by customers for good units and that are discarded or sold for reduced prices

Basic Terminology Rework—units of production that do not meet the specifications required by customers but which are subsequently repaired and sold as good finished goods. Scrap—residual material that results from manufacturing a product. Scrap has low total sales value compared with the total sales value of the product.

Accounting for Spoilage Accounting for spoilage aims to determine the magnitude of spoilage costs and to distinguish between costs of normal and abnormal spoilage. To manage, control, and reduce spoilage costs, they should be highlighted, not simply folded into production costs.

Types of Spoilage Normal spoilage is spoilage inherent in a particular production process that arises under efficient operating conditions. Costs of normal spoilage are typically included as a component of the costs of good units manufactured because good units cannot be made without also making some units that are spoiled. Management makes a conscious decision about the production rate per hour which will generate a certain level of normal spoilage.

Types of Spoilage Abnormal spoilage is spoilage that is not inherent in a particular production process and would not arise under normal operating conditions. Abnormal spoilage is considered avoidable and controllable. Units of abnormal spoilage are calculated and recorded in the loss from abnormal spoilage account, which appears as a separate line item no the income statement.

Process Costing and Spoilage Units of normal spoilage can be counted or not counted when computing output units (physical or equivalent) in a process costing system. Counting all spoilage is considered preferable.

Inspection Points and Spoilage Inspection point—the stage of the production process at which products are examined to determine whether they are acceptable or unacceptable units. Spoilage is typically assumed to occur at the stage of completion where inspection takes place.

The Five-Step Procedure for Process Costing with Spoilage Step 1: Summarize the flow of physical units of output—identify both normal and abnormal spoilage. Step 2: Compute output in terms of equivalent units. Spoiled units are included in the computation of output units.

The Five-Step Procedure for Process Costing with Spoilage Step 3: Summarize total costs to account for . Step 4: Compute cost per equivalent unit. Step 5: Assign total costs to: Units completed Spoiled units Units in ending work-in-process

Steps 1 and 2 Illustrated

Steps 3, 4, and 5 Illustrated

Steps 1 and 2, Illustrated

Steps 3, 4, and 5, Illustrated

Number of Units of Normal and Abnormal Spoilage Changes, Depending on When Inspection Occurs 40