LS1 BLM@LHC status 17/03/2014.

Slides:



Advertisements
Similar presentations
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
Advertisements

CERN Draft 0.3 – after meeting July 29th, 2011IMWG - Workflow sub working group - draft after meeting.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
LS1 status 6/06/2014. BLM re-installation ARC Sector 3-4 – in work, will be done to Sector 4-5 – from 30(23).06 – Sector for Cool.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Linac4-PSB 160 MeV connection readiness review
Cabling for LHCb Upgrade
SPS LS1 Planning meeting (N019) 04/09/13
Update on the Critical Path of the PS Booster Schedule for the EYETS
BE-BI Activities and Status: LHC and Injectors
ELENA installation and commissioning status
VELO-installation meeting CERN, January 17, 2006
Status of LHC installation & New Installation Schedule
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Shipping (#4) of the components for 100’s Head welding.
News about the WA104 Programme
Injectors BLM system: PS Ring installation at EYETS
SPS - EYETS 2016/17 Vacuum systems planning
Helium spill in LHC tunnel
Injection region BLMs – ECR
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
EN-HE SPS works during EYETS
ELENA electron cooler and SEM grids status
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Diffuser status October 2017
Renovation of the 45-year old PS magnets
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Disabling Rules.
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Undulator System Installation
BLM planning 24/02/2014.
BLM planning 03/03/2014.
LS1 status 28/04/2014.
LS1 status 24/03/2014.
07/07/2014 * status, all * AccTest framework
Technical Stop #4 29th August - 2nd September 2011
LHC installation status
LS1 status 07/04/2014.
SPS Planning meeting for LS2 #19 Vacuum sectors & Magnet campaign situation Antonio Grande EN-ACE 06-Mar-2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 23/01/2019.
SPS Planning meeting for LS2 #18 Vacuum sectors situation
2017 GSPSA Captain’s Meeting
BLM planning 03/02/2014.
Saturday 2nd October BLM threshold follow-up - Bernd Dehning and Joerg Wenninger Following MPP approval, Bernd Dehning has increased the BLM thresholds.
LS3 Study & Readiness Meetings
Week 43 ( LHC only) Installation of BLECF in LSS 4L and LSS 4R (Adrien and Mounir) - Done Check and repairs of BLECF in LSS 4L and LSS 4R (Steve) -? Installation.
SPS Planning meeting for LS2 #25 Vacuum sectors status
WP1: Status and Plans Francisco Sanchez Galan (EN-EA-PE)
SPS Planning meeting for LS2 #26 Vacuum sectors status
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

LS1 BLM@LHC status 17/03/2014

Surface racks P2 -/+, to change the configuration   P2 -/+, to change the configuration P1, P3, P5, P6 , P7, P8 : OK (Seghaier and Steve) Pt4 for dismounting , March 17th : 4 extensions (P4) and 1 door from P3 with ventilators all BL equipment to Seghaier for cleaning Rack configuration: R L I C

BLM re-installation Current status of DS+ARC installation: Sector 6-7 - done Sector 5-6 – done Sector 7-8: R7 – done L8 – Arc done, LSS needs 2 more days( 19-20 of March), no access to sector 17-18.03 All SEMs was dismounted in L8 ( to exchange for LIC) Barbara’s request to dismount SEMs in P6 ( mail form 13.03.2014) - BLMQI.01L8.B1E30)MQXA(BPMSW) - change of expert name ( Christos question from 10.03) with support was dismounted for LHCb counter installation, and to install in new, shifted place Sector 8-1 - start DS of R8: Friday, March 21st QPS and BLM team will put down the common longest cable trays List what we need to be work before RSM: Installation, surface rack, tunnel rack, DB, … Request to move the source on surface – OK: From: Abderrahim Errahhaoui Sent: 11 March 2014 19:34 In this case, I suggest that you transport the trolley (with the radioactive sources) in the Type A package. For that, you have to fill in the internal transport request in EDH and please indicate “Radioactive” as danger and “Type A package*” required in the comments. LSS installation New installation

General Information Beam Vacuum schedule is really tight and just fit with the deadline No margin left to fit the deadline This hole of activities appeared because of delay of equipment in surface. The schedule already shifted by 1 month ! LSS 6 LSS 7 LSS 1R LSS 2L LSS 2R LSS 3 LSS 4 LSS 8L LSS 8R LSS 1L LSS 5R On a critical path Provisional deadline 6th March 2014 LHC machine Schedule for LS1 EDMS 1362035

Divers Slot Labels ( after changes of expert names) Label for new “short” cable (BJBDV - BJBAP), ECR for HV divider is released Coating of rest of supports and brides to outside of CERN, schedule? Plastic boxes and old supports from tunnel to ? Order the additional materials for installation: cables, metallic strips 1000 m(HV) and 3000 m(BNC) cables; 35 bobins (*45 m in each) of metallic strips. Rad Source test ( 2 sources ) ready to end of July ECR for LICs and Removal the all SEMs(?) LIC’s tests and shrinking at GIF: from 14:00 at 17-18/03 GIF and GIF++ status: GIF will operate up to Middle of August, 2013 (FIC tests in July, 2013) GIF++ will operate from Middle of January, 2014 (IC tests in February,2014) FIC production contract was signed: Materials to send: resistors ? List of materials, cost and amount of IC new production ( Q4,2013-Q1,2014)

Tunnel racks and HV divider HV divider installation: Installed in all “standard” locations in all Points, except L6 In “special cases” – not installed, but long cables was ordered ( Remo) - ? L5: restoration of racks after He spill test Racks – CFC cards : ready for installation ( Ion or Russian team)