Linear Collider Positron Source and Central Integration Update

Slides:



Advertisements
Similar presentations
Linear Collider AD&I Update N. Walker, E. Paterson, V Kuchler, T. Lackowski, J. A. Osbourne,J. Clarke, A. Wolski, S. Guiducci, N. Solyak,… Norbert Collomb30/08/2009.
Advertisements

Linear Collider Positron Source and Central Integration Update N. Walker, J. Clarke, E. Paterson, V Kuchler, J. A. Osbourne, T. Lackowski, A. Wolski, S.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Linear Collider Positron Source System Integration Jim Clarke, James Jones, Ian Bailey, Leo Jenner, James Rochford,Alexander Mikhailichenko, John A. Osbourne,
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
1 Options for low energy spin manipulation Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October 2009 K. Moffeit, D.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
Pictorial Damping Ring DC03 Layout (A. Wolski, M. Korostelev)
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Linear Collider Positron Source System Integration Jim Clarke, James Jones, Ian Bailey, Leo Jenner, James Rochford, Alexander Mikhailichenko, John A. Osbourne,
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
Summary of Day1 of the Mini-WS and Santander Plan K. Yokoya CRWG 9, KEK 2016/4/19 MiniWS summary1.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Baseline Technical Review – Central Region Accelerator Systems
K. Yokoya CRWG, ECFALC2016, KEK
Specifications for Central Region Layout
ILC-CR-0004 Main Linac extension: Implementation status
Introduction and Meeting Objectives
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
Auxiliary Positron Source
BDS Cryogenic System RDR Status and EDR Plans
Summary of CRWG+CFS+Positron Mini-WS
CLIC Civil Engineering Update
ILC CFS AD&I Daresbury Lab Summary
AD & I : BDS Lattice Design Changes
Cost Comparison of Undulator and e-Driven Systems
Kaoru Yokoya CRWG Meeting, Feb.2, 2016
Electron Source Configuration
Linear Collider Positron Source Update
Extract from today’s talk given to DCB
Overview of Day One – 29 Feb 2016
Central Region Working Group
ILC - Global Design Effort
Laser Und XFEL.EU Experiment
Presentation transcript:

Linear Collider Positron Source and Central Integration Update Norbert Collomb Acknowledging assistance from: N. Walker, J. Clarke, E. Paterson, V Kuchler, J. A. Osbourne, T. Lackowski, A. Wolski, S. Guiducci, N. Solyak,… 30/09/2009

Positron Source – TILC09 status Undulator moved from 150 GeV to 250 GeV location. PTRAN moved from ceiling into same plane as rest of machine. No Auxiliary Source and 5GeV Accelerator info. Spin Rotation in question, hence omitted. TAPA PPA BDS Dogleg at 1.5m offset UNDULATOR PCAPA PPATEL 30/09/2009 N.Collomb

Intensive work with other work groups resulted in current status 3 D Overall Layout for Option1 Positron Source region – major changes. Spin Rotation added in the last few days. Some guesswork to be confirmed via lattice design Booster Option 1: BDS Chicane + Collimation + Fast Abort AUX Source added recently. Some guesswork to be confirmed via lattice design. Area of optimisation! 30/09/2009 N.Collomb

Positron Source – AD&I 3 D Layout Positron Source BDS Fast Abort region. Few kW Dump To take few bunches (not full beam) Quadrupole, Sextupole and Dipole Magnets I.P. Direction Kicker Magnets RTML BDS Chicane + Collimators Undulator Section (20 off 1 off Quad + 3 SC Undulators = 302m) Pre – Undulator Quads (48m) 30/09/2009 N.Collomb

Positron Source – AD&I 3 D Layout Positron Source BDS Fast Abort region. Is an Alcove like this feasible? (9.5° off axis) – CFS answer: yes Interleaved Fast Abort and Undulator Magnets I.P. Direction I.P. Direction Sufficient clearance between Fast Abort Magnets and Undulator Modules RTML 30/09/2009 N.Collomb

Positron Source – AD&I 3 D Layout Positron Source ‘BDS Dogleg’ region. AUX Source RTML 40m Drift to clear Remote Handling and Dump shielding BDS ‘Dogleg’ 1.5m ML-Axis offset I.P. Direction 30/09/2009 N.Collomb

Positron Source – AD&I 3 D Layout Positron Source ‘AUX Source’ region. Tune-Up Dump and Diagnostics Section Remote Handling RTML 2 off Cryomodules at 12.6m with Quad, in Line with Photon Beam, approx. 30MeV/m Thermionic Gun, Bunchers, Diagnostics, 2 off Standing Wave Accelerators (12 MeV/m), Diagnostic Section and Tune-Up Dumps. BDS ‘Dogleg’ I.P. Direction Photon Beam Pipe N.Collomb 30/09/2009

Positron Source – AD&I 3 D Layout Positron Source ‘Target Area’. I.P. Direction Capture Chicane R.H. Extraction Shaft? Pre-Acceleration moved downstream. On ML-Axis. Remote Handling (R. H.) (Vertical Extraction) BDS ‘Dogleg’ RTML clears R.H. ‘Box’ 30/09/2009 N.Collomb

Positron Source – AD&I 3 D Layout Positron Source ‘Spin Rotation’ region. Spin Rotation (at 400 MeV as per Moffeit scheme) Positron Transfer start Pre – Accelerator (to 400 MeV). 30/09/2009 N.Collomb

Positron Source – AD&I 3 D Layout for Positron Source ‘Booster region’. Booster Endbox PTRAN end 1st of 2 Booster periods (141.6m). 11 off Cryomodules at 12.6m length + 1 off Endbox (2.5m). N.Collomb 30/09/2009

Info cascades to CF&S 1000m? Next Slide J.Osborne CERN

Positron Source – AD&I 2 D Layout for Option1 Positron Source region. BDS Chicane, Collimation and Fast Abort Extraction (350m). Booster length fixed. Position relative to Positron Source can vary in steps of 16.8m either direction. Positron Source length currently at approx. 920m. Converting this 2 D data into 3 D has taken place as depicted in the following slides. 30/09/2009 N.Collomb

Positron Source – AD&I Summary The Positron Source overall layout can be considered complete (Booster Position and remaining Positron Transfer will require update). The purpose of this meeting is to trigger some discussions about the Auxiliary Source location and the Spin Rotation proposal. CAD models can be distributed now or after Beam Delivery lattice design update. Based on the above discussions, new or modified layout needs to be created. Note, certain system lengths (Cryomodules) and positions ought to be near a sufficiently large access shaft. Remote Handling change over process and space requirement investigation/development is high on priority list. Individual systems need to be developed further (are we at a stage where we can go into more detail?) 30/09/2009 N.Collomb

Proposed Fast Abort Layout (Feasibility Investigation in progress) AD&I e+ layout Option2 Last not least for the observant, there is an Option2 currently under investigation. This where the Fast Abort is taken downstream to the original location (approximately) to combine it with the Diagnostics Dump. Proposed Fast Abort Layout (Feasibility Investigation in progress) Preliminary Beam Studies (Deepa and James) indicate that this solution may increase length of machine by approx. 300m. This solution could further increase cost in terms of equipment required (virtually duplicating part of the BDS). Maintenance cost will increase the running cost of the ILC. Starting to look expensive. Need to check Remote Handling Area for clearance. Can RTML magnets and abort beam line magnets coexist in close proximity? Approx. 1.8m 250 GeV Beam from Main Linac to be taken to ceiling (diagonally up and towards I.P). Lattice design is complex and Beam acceptance is governing this. Installation and maintenance could be difficult!! Plenty of room for access (cautious maybe) Approx. 2m 0.8m 30/09/2009 14

Central Integration – AD&I ‘U.K.’ AD&I machine layout (I.P. at Z:0, X:0) Positron Main Dump Electron Main Dump 30/09/2009 N.Collomb

Central Integration – AD&I For the first time; Lattice Design components and CF&S 3D CAD combined. Damping Ring Racetrack RTML Tunnels e- Side (e+ Source) Service Tunnel e+ Side (e- Source) Target Hall Immediate identification of clashes Lattice Damping Ring Injection and Extraction off-set too small. N.Collomb 30/09/2009

Central Integration – AD&I e- side Heading towards I.P. Note; 4 shafts, 3 caverns Positron Source e+ side Heading towards I.P. Target Hall for ‘Push-Pull’ detector I.P. e- Main Dump (after collision) Proposed service tunnel 30/09/2009 N.Collomb

Central Integration – AD&I First Value Engineered suggestion e- Side (e+ Source) Eliminate separate Damping Ring Building and associated shaft. Combine access to Target Hall and Damping Ring. Close liaison between Work Groups permit improvement suggestions like this early on. e+ Side (e- Source) Let’s have a look inside the tunnel 30/09/2009 N.Collomb

Central Integration – AD&I Electron Beam direction Positron Beam direction Electron RTML (coming from DR) Transfer Tunnel branch I.P. (down here somewhere) Positron Transfer Line Heading into DR Positron Main Dump line (after collision) BDS (e- side) Heading towards I.P. 30/09/2009 N.Collomb

Central Integration – AD&I Electron Beam direction Positron Beam direction I.P. Transfer Tunnel branch Electron RTML (coming from DR) Positron Transfer Line Heading into DR Positron Main Dump line (after collision) ‘Aerial’ view of same region BDS (e- side) Heading towards I.P. 30/09/2009 N.Collomb Positron Main Dump

Central Integration – AD&I Electron Beam direction Positron Beam direction Central Integration – AD&I Working our way upstream of e- side e- Diagnostic Dump; (area under investigation to combine with Positron Main Dump) I.P. e- Diagnostic line and Dump e- BDS Positron Transfer Line Heading into DR (abbreviated) RTML omitted Positron Booster to 5GeV (end) 30/09/2009 N.Collomb

Central Integration – AD&I Electron Beam direction Positron Beam direction Central Integration – AD&I Same area inside tunnel. Update required. RTML omitted. Positron Booster to 5GeV (end) 30/09/2009 N.Collomb

Central Integration – AD&I Still further upstream of e- side – the Positron Source e- BDS e- RTML Positron Spin Rotation at end of 400 MeV Pre-Accelerator Positron Pre-Accelerator (400MeV) (New proposed location) New Proposed Capture Chicane Target Area enclosure (Remote Handling) AUX Source Diagnostics 30/09/2009 N.Collomb AUX Source Cryomodule

Central Integration – AD&I Solenoids, Kickers, Dipoles, etc. Positron Spin Rotation at end of 400 MeV Pre-Accelerator. 30/09/2009 N.Collomb

Central Integration – AD&I Beam direction Central Integration – AD&I Access Cavern and Shaft RTML Undulator Area e- Fast Abort Line e- Main LINAC e- Fast Abort Dump 30/09/2009 N.Collomb

Central Integration – AD&I Summary There are a number of Beam lines which have been omitted due to time constraints. Some improvements are being incorporated already. Further value engineering opportunities are being identified. BDS lattice design is being optimised (as we speak). Updates of CAD (2D and 3D) are made as quickly as possible after new info is available. Note, this is a first step in the Overall Layout integration and there are many risk highlights. It is felt that huge progress has been made and continues to do so. There seems to be a light at the end of the tunnel!! I’d like to go as far as saying that a big proportion of the fluidity of the machine has been solidified. Don’t forget that some areas are best guesstimates and need to be confirmed by physicists. I’d like to thank everyone for their collaboration and excellent communication. 30/09/2009 N.Collomb