COAL TRANSPORTATION AND LOGISTICS

Slides:



Advertisements
Similar presentations
Presentation on Coal Market in India th Annual Conference P N Shukla Director (Operations and Business Development) DFCCIL, New Delhi.
Advertisements

1 1 National Highways Development Project(NHDP) Ministry of Road Transport and Highways National Highways Authority of India.
 A number of mega steel plants coming up in this region.  This New-Line-A Connector between coal fields in Talcher to Banspani-Sukinda line.  Coal.
Ministry of Urban Development Government of India C K Khaitan JS (Urban Transport) 29th Jan Inputs on Urban Infrastructure Development in India.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Opportunities for Public-Private Partnerships in Railways 20 th May 2006.
IRCON INTERNATIONAL LIMITED
SUDHENDU J. SINHA DIRECTOR PLANNING, RAILWAY BOARD Date :
Indian Railways COAL INFRASTRUCTURE RINKESH ROY DIRECTOR TRAFFIC TRANSPORTATION Railway Board 22 nd June2012.
Indian Railroad or Bengal, Bihar, and Tamil Nadu Railroad.
Presentation of W.C.Railway
INDIAN RAIL By ABHISHEK KUMAR TIWARI. Indian Railways is an Indian state-owned enterprise, owned and operated by the government of India through the Ministry.
1 Freight Operations Information System COM/CCM’s Conference
INDIAN RAILWAYS introduction presentation done in FRI/Dehradoon for non railway people.
IWMP- Maharashtra Annual Action Plan New Delhi- Dt. 19th March 2014 V Giriraj Principal Secretary WC & EGS, Chairman VWDA, Maharashtra State, Pune.
IT Projects with CAO/FOIS
By Suresh Gupta, Dean/IRICEN. INTRODUCTION Growth in GDP during expected to be 8.1% likely to increase further in coming years. Economic growth.
Clean Coal – Where Does India Stand? dr kalyan sen Secy General, CPSI Prof Emeritus, Bengal Engineering & Science Universty, Shibpur,and Independent Director,
1 IT PROJECTS (UNDER CAO/FOIS) PROGRESS AND CONCERNS AUGUST 2006.
11 th Meeting of General Council (GC) of National Food Security Mission (NFSM) 26 th August, 2015 Presentation by: Ajay Kumar Singh State Mission Director.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
Transport Update Chris Carter Transport Strategy Manager.
STATE POLICY AND PERSPECTIVES FOR DEVELOPMENT OF THE RAILWAY INFRASTRUCTURE MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF.
DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES
Presentation Format MGNREGA PMGSY Rural Housing : IAY BRGF Integrated Action Plan.
Overall National Grid Development: Constraints & Options
Ministry of New and Renewable Energy Government of India 1 11th January, 2016.
Coalfield Route - Double Stack Initiative I. Introduction Concept The Coalfield Route Double Stack initiative is designed to facilitate the transfer of.
Presentation on Annual Action Plan for IWMP
CE2303 Railway Engineering
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
REGIONAL REVIEW MEETING SOUTHERN REGION STATES Hyderabad DEPARTMENT OF LAND RESOURCES MINISTRY OF RURAL DEVELOPMENT GOVERNMENT OF INDIA 21 st November,
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
2014 Annual Program Evaluation (APE) Status Update April 1, 2014.
Menauitpuitptransport#MENAUITP Land Transportation Projects in the Kingdom of Bahrain Nada Deen Director, Land Transportation Projects Ministry of Transportation.
Opportunities for Spanish Engagement Few Ongoing and Upcoming WB funded Transport Projects October 26, 2012.
Review of Implementation of Smart Cities Mission
Review of Implementation of Smart Cities Mission
Sterlite Grid Limited Sterlite Grid Limited
ANNUAL ACTION PLAN INTEGRATED WATERSHED MANAGEMENT PROGRAMME
Review of Implementation of Smart City Mission
FIRST MOVER ROADS PPP PROGRAMME
Improving the Cardiff and Valley Railway
Review of Implementation of Smart Cities Mission
REGIONAL GRIDS IN INDIA – QUICK FACTS
Transport (Civil Aviation) Department Govt. Of Jharkhand
Maintenance of Track carrying HAL - Deep Screening
National Hydrology Project
COAL INDIA LIMITED EXPLORATION, PLANNING AND PRODUCTION
WELCOME ANNUAL ACTION PLAN For IWMP
HOUSING PERFORMANCE REPORT 07/08 (3rd Quarter)
GRANT – RECAPITALIZATION OF LIBRARY SERVICES SEPTEMBER 2009
MINERAL BASED INDUSTRIES
Baltic-Adriatic Corridor
An Overview IR carries more than 23 million passengers per day (equivalent to population of Australia) Runs 22,300 trains per day (13,098 passenger
Power’s Coal Anorexia? Power Sector’s Growth Story
How South Eastern Railway plans to move Freight Traffic
HOW WILL INDIAN RAILWAYS WIN BACK COAL FREIGHT FROM ROAD
Delivering East West Rail
25th Avenue Grade Separation
25th Avenue Grade Separation
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Housing & Urban Development Department Government of Odisha
Nine Months Ended December, 2018
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
2014 Annual Program Evaluation (APE) Status Update
Revised Tender Timescale for DN Interruption Arrangements
METRO RAIL IN CHENNAI Prepared by S.PRABHAVARAJAN LECTURER.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
XRN Nov 19 Release - Status Update
Presentation transcript:

COAL TRANSPORTATION AND LOGISTICS Rajneesh Kumar Director (Planning) Ministry of Railways (Railway Board) (06-09-2018)

Rail Projects for Coal Evacuation There are 84 number of capacity creation projects on IR for facilitating smooth coal evacuation New Lines :---- 15 Doubling/Trippling/Quadrupling :--- 66 Gauge Conversion :--- 03

Rail Projects for Coal Evacuation Doubling/Trippling/Quadrupling :--- 66 projects Total Length in KMs :---- 6,445 Total Cost in Rs crore :--- 68,074 Exp. Upto 31-03-2018 in Rs crore :--- 10,742 Outlay for 2018-19 in Rs crore :--- 5,898 Balance required in Rs crore :--- 51,434

Rail Projects for Coal Evacuation New Lines :--- 15 projects Total Length in KMs :---- 2,178 Total Cost in Rs crore :--- 27,542 Exp. Upto 31-03-2018 in Rs crore :--- 6,545 Outlay for 2018-19 in Rs crore :--- 2,672 Balance required in Rs crore :--- 18,325

Rail Projects for Coal Evacuation Gauge Conversion:--- 3 projects Total Length in KMs :---- 636 Total Cost in Rs crore :--- 3,361 Exp. Upto 31-03-2018 in Rs crore :--- 2,183 Outlay for 2018-19 in Rs crore :--- 221 Balance required in Rs crore :--- 958

Rail Projects for Coal Evacuation Total Projects :--- 84 projects Total Length in KMs :---- 9,259 Total Cost in Rs crore :--- 98,977 Exp. Upto 31-03-2018 in Rs crore :--- 19,470 Outlay for 2018-19 in Rs crore :--- 8,791 Balance required in Rs crore :--- 70,717

LIST OF ONGOING COAL PROJECTS (Rs.Cr) S.No PH Rly Project Year Total length (in km) Latest Cost Exp. upto 01.04.18 Outlay 2018-19 Bal. to Complete 1 DL ECoR Khurda Road-Barang 3rd Line (32.33 km) 2003-04 32.33 385 306.92 15 63 2 Sambalpur-Titlagarh (182 km) 2006-07 182 1259 326.61 50 882 3 Brundamal-Jharsuguda- flyover connection for joining DN Line 2009-10 6.6 94 4.96 5.3 84 4 Sambalpur-Talcher (174.11 km) 2010-11 174.11 1539 597.52 220 722 5 Vizianagram-Titlagarh (Sambalpur) 3rd line 2015-16 263.65 2336 80.05 379 1877 6 3rd & 4th line between Jarapaada- Budhapank with flyover at Talcher. 91 810 81.9 120 608 7 3rd & 4th line between Budhapank- Salegaon via Rajatgarh. 170 1173 309.35 644 8 ECR Garhwa Road-Ramna (32.32 km) 2013-14 32.32 348.23 119.39 30 199 9 Danea-Ranchi Road (25.2 km) 25.2 323.88 98.76 175 10 Jarangdih-Danea Patch Doubling (29.2 km) 29.2 331.96 97.04 185 11 Hajipur-Ramdayalu Nagar (47.72 km) 47.72 367.17 283.24 34 12 Karaila Road- Shaktinagar section 32.15 528.57 15.61 508 13 Ramna-Singrauli 160 2436.21 82.62 150 2204 14 Billi-Chopan (Renukut- Chopan) 7.89 93.29 64.41 19 Ranchi Road- Patratu section patch doubling. 31 348.20 25.82 100 222 16 Dhanbad (Patratu) -Sonnagar - 3rd line (291 km) 291 3406.16 60 250 3096 17 Kiul- Gaya 124 1200.20 328.36 240 632 18 Garwa Road Rail over rail 2016-17 262.71 261 Gomoh Flyover for down trains 487.73 433 20 ER Pirpainti-Bhagalpur (59.06 km) 2011-12 59.06 332.14 262.66 41 28 21 Nimtita-Farakka (Sagardighi- Malda Town) (25 Km) 25 247.67 43.02 200 22 NCR Jhansi-Bina 3rd line 153 2001.63 451.21 582 968 23 Mathura-Jhansi 3rd line 274 3677.76 250.71 201 3226 24 Flyover at Aligarh 1456.80 0.1 1456 Lalitpur-Birari with flyover at Lalitpur 304.44 2.05 292 26 3rd Down line between Naini and Chheoki with additional Platform 2017-18 25.13

Provision of 4th line from Allahabad to Bumrauli flying S.No PH Rly Project Year Total length (in km) Latest Cost Exp. upto 01.04.18 Outlay 2018-19 Bal. to Complete 27 DL NCR Provision of 4th line between from Chipiyana Buzurg to Dadri connecting Down loop of Maripat and holding line of Dadri in connection with DFC 2018-19 12 128.68 0.1 129 28 Provision of 3rd line between Aligarh Jn - Daud Khan parallel to UP line and construciton of flyover at Daudkhan connecting DN loop line of Daudkhan to common loop of New Daudkhan(DFC) 6.9 447.99 448 29 Provision of 4th line from Allahabad to Bumrauli flying over at Subedarganj and connecting to UP loop of 10 493.11 493 30 Provision of 3rd line between Ruma Chakeri- Chandari in 12.5 176.68 177 31 Provision of 4th line between Dholpur Jhansi and Beena 321.8 4869.95 4870 32 Provision of 4th line between Mathura-Dholpur Jn. 107 2945.75 2946 33 NR Rajpura-Bhatinda 2015-16 172.64 1251.25 33.14 400 818 34 Jaunpur-Tanda 2016-17 94 676.36 0.2 21.01 655 35 NWR Rewari-Manheru (69.02 km) 2011-12 69.02 410.00 394.02 15 1 36 SCR Kazipet-Vijaywada 3rd line with electrification (219.64 km) 2012-13 219.64 1856.95 177.58 60 1619 37 3rd line of balance section bet. Kazipet -Ballarshah 201 2063.03 306.16 301 1456 38 Byepass at Vijayawada, Kazipet 30.15 499.29 81.25 6.55 411 39 SECR/E COR Raipur-Titlagarh (203 km) incl. NL Mandir Hasaud-Naya Raipur (20 km) & new MM for conversion of Raipur(Kendri)-Dhamtari & Abhanpur-Rajim branch (67.20 km) 2007-08 290.2 1512.89 363 50 1100 40 SECR Champa-Jharsuguda 3rd line (165 km) 2008-09 165 1212.58 943.63 175 41 Khodri-Annupur with flyover at Bilaspur (61.6 km) 2006-07 61.6 446.21 257.43 3 186 42 4th line bet.Jharsuguda-Bilaspur 206 1973.66 64.8 200 1709 43 3rd line bet. Pendra Road-Anuppur (Bilaspur-Anuppur) 50.1 393.98 203.28 141 44 3rd line Anuppur-Katni 165.52 1370.94 183.75 175.04 1012 45 Gevra Rd-Pendra Rd 135 1900.00 1900 46 Jharsuguda-Bilaspur ---Flyover/Byepass (10 Km.) 299.65 5 285 47 SER Rourkela-Jharsuguda 3rd line 101 970 257.14 180 533 (Rs.Cr.)

6445 68074 10742 5898 51434 48 DL SER Kharagpur-Adityapur 3rd line S.No PH Rly Project Year Total length (in km) Latest Cost Exp. upto 01.04.18 Outlay 2018-19 Bal. to Complete 48 DL SER Kharagpur-Adityapur 3rd line 2015-16 132 1312 48.2 115 1149 49 Chakradharpur-Goilkera 3rd line(34 km) 34 355 92.18 72 190 50 Mohishila - Kalipahari (Link) with 1 additional loop line at MOH station 5 43 184.16 18 -159 51 Bondamunda-Ranchi 158.5 1724 266.12 200 1258 52 Narayangarh-Bhadrak 3rd line 2016-17 155 2381 10 55 2316 53 Damodar-Mohishila 8 76 3 32 41 54 Bondamunda-Rourkela 4th line 9.3 94 Provision of connection of line between Radhanagar siding line of Adra Division to Barachak and Y connection to Sitaram pur station of Asansol Division. 2017-18 312 10.32 0.1 302 56 Provision of 3rd line between Chandil- Anara- Burnpur Section along with additional loop line at Nimdih, Urma, Tamna, Charra & Bagalia Stations 2018-19 125 1646.81 1647 57 Talgaria station to Bokaro N/ Cabin section in Adra Division 38 390.39 390 58 SR Omalur-Metturdam Patch Doubling with electrification (29.03 km) 2011-12 29.03 232 105.07 95 59 Salem-Magnesite Junction-Omalur 11 4.08 106 60 WCR Bhopal-Bina 3rd line (145 km) 2008-09 145 1065.00 1122.81 20 -78 61 Bina-Kota (282.66 km) incl MM of Malkhedi- Mahadeokhedi (8.7 km) 291.36 1570.26 784.84 200.1 585 62 Katni- Singrauli doubling 261 1762.94 479.11 362 922 63 3rd line between Katni and Bina 278.7 2478.23 101.48 2222 64 Grade separator/Byepass at Katni. 21.5 582.13 195.1 75 65 Powerkheda-Jujharpur single line flover in UP direction 12 247.03 153.97 10.1 83 66 Jukehi chord line at Katni 0.53 12.45 0.9 5.42 6 Doubling Total 6445 68074 10742 5898 51434 (Rs.Cr.)

S.No PH Rly Project Year Total length (in km) Latest Cost Exp. upto 01.04.18 Outlay 2018-19 Bal. to Complete 1 NL ECoR Angul-Sukinda Road 1996-97 98.7 1202.7 134.44 200 868 2 ECR Giridih-Koderma 111 927 802.09 40 85 3 Koderma-Ranchi 1998-99 204 3211 2667.21 150 394 4 Koderma-Tilaiya 2001-02 65 563.17 363.92 75 124 5 Rajgir-Hisua-Tilaiya (46 km) & Natesar-Islampur (21 km) 67 528.06 442.14 20 66 6 ER Hansdiha-Godda 2011-12 30 542 439.17 250 -147 7 SCR Bhadrachalam Road-Sattupalli 2010-11 56.25 704.31 69.69 120 515 8 Bhadrachalam-Kovvur 2012-13 112 923 2.38 920 9 SECR Gevra Road-Pendra Road 2013-14 135 4919 10 800 4109 Raipur-Jharsuguda 310 2161 0.1 1.1 2160 11 Dharamjaigarh-Korba 2016-17 63 1349 12 Dongargarh-Kharigarh-Bilaspur 270 1250 13 Chirimiri-Nagpur Halt 2018-19 114 14 Kharsia-Dharamjaygarh with spur line (in lieu of Raigarh (Mand Colliery) - Bhupdeopur project) 104 3055 700 2345 15 WCR Lalitpur-Satna, Rewa-Singrauli & Mahoba-Khajuraho 1997-98 541 6093 1603.89 315 4174 New Line Total 2178 27542 6545 2672 18325 GC Jabalpur-Gondia including Balaghat-Katangi 285 1777 1366.9 210 SER Rupsa-Bangriposi MM New Line from Buramara to Chakulia 1995-96 140 604 191.19 413 SR Tiruchchirappali-Nagore-Karaikkal (145.33 Kms) with extn. Nagapattinam-Velankani-Tiruturaipundi (43 Kms) including new MM Karaikudi-Paralam NL(23 km) 211 980 624.72 10.43 345 GC Total 636 3361 2183 221 958 Grand Total 84 9259 98977 19470 8791 70717

Rail Projects for Coal Evacuation Ministry of Railways, Coal & Power have jointly identified 14 critical coal projects for monitoring at PMO level

Critical Rail Projects for Coal Evacuation Funded by Coal Companies Implemented through Spl. Purpose Vehicles (SPVs) Funded by Railways

Rail Projects Funded by Coal Companies Tori-Shivpur Railway Line in Jharkhand (North Karanpura Coalfields) Jharsuguda-Barpali-Sardega Rail Link at Ib Valley Coalfields of MCL in Odisha Rail connectivity of Lingaraj SILO with existing Deulbeda Siding at Talcher Coalfields of MCL in Odisha Railway line from Bhadrachalam to Sattupalli in Telangana (Godavari Valley Coalfeilds)

1 Tori-Shivpur Railway Line (44.37 km)

1 Tori-Shivpur Railway Line (44.37 km) (on deposit basis by ECR) Tori-Balumath (20 kms) commissioned in March’2018 Balumath-Bukru (5 km) – Engine Run Down done in May’ 2018 Bukru-Shivpur (19 Kms) commissioned in August’18 Doubling of Tori - Shivpur Line with Electrification Doubling upto Balumath (20 Kms) by Nov’ 2018 Balance doubling by March’ 2019

2 (50.30 kms) Sardega Jharsuguda

2 Jharsuguda-Barpali-Sardega Railway Line (on deposit basis by SER ) Work completed in April’2018 “Y” Connection at JSG to be completed in Aug’2018

3 Rail connectivity of Lingaraj SILO with existing Deulbeda Siding at Talcher Coalfield of MCL in Odisha

3 Rail Connectivity of Lingaraj SILO with existing Deulbeda Siding at Talcher Coalfield of MCL in Odisha (on deposit basis by ECoR) Tender finalized Work taken up TDC – Mar’ 2019

4 Bhadrachalam to Sattupalli Railway line (56 kms)

4 Railway Line from Bhadrachalam to Sattupalli (56 kms on deposit basis by SCR) Land acquisition under process Land expected by Sept’2018 Agency Finalized TDC – Sept’ 2019

Rail Projects Implemented Through Special Purpose Vehicles (SPVs) Shivpur - Kathautia Railway Line (North Karanpura coalfield in Jharkhand) by JCRL East Corridor: Kharasia – Korichhapar – Dharamjaigarh (Mand-Raigarh coalfield in Chhattisgarh) by CERL East-West Corridor: Gevra Road – Pendra Road (Korba coalfield in Chhattisgarh) by CEWRL Angul - Balram Rail Link (Talcher coalfield in Odisha) by MCRL

5 Shivpur - Kathautia Railway line (47.7 kms) Koderma Tori Shivpur Kathautia Hazaribagh Banadag Barkakana

5 Shivpur-Kathautia Railway Line (47.7 kms through SPV (JCRL) by IRCON) Jharkhand Central Railway Ltd (Equity Shares: CCL-64%, IRCON-26% & GoJ-10%) DPR approved Land acquisition expected by Nov’2018 Financial Closure by Sept’ 2018 TDC – Dec’ 2020

6 East Corridor Kharasia - Korichhapar-Dharamjaigarh (by IRCON)

6 East Corridor Kharasia – Korichhapar -Dharamjaigarh (through SPV (CERL) by IRCON) Chhattisgargh East Railway Ltd (Equity Shares: SECL-64%, IRCON-26% & GoC-10%) Phase-1 (74 kms) Kharasia – Korichhapar 44 kms Single Line completed Remaining 1 km by Mar’2019 Kharasia - Korichhapar Double Line and Spur Line Gharghoda - Garepalma - TDC – Mar’2019 Phase-2 (62 kms) Dharamjaigarh – Korba: Financial Closure expected by Sept’2018

7 EAST – WEST RAIL CORRIDOR Gevra Rd. – Pendra Rd (135 kms) EAST RAIL CORRIDOR KHARSIA

7 East-West Corridor - Gevra Rd. – Pendra Rd (135 kms through SPV (CEWRL) by IRCON) Chhattisgarh East West Railway Ltd (Equity Shares: SECL-64%, IRCON-26% & GoC-10%) CIL approved DPR in May’ 2018 Financial Closure expected by Sept’ 2018 TDC – Dec’ 2020

8 Angul-Balram Rail Link as part of Inner Corridor Through MRCL (14 8 Angul-Balram Rail Link as part of Inner Corridor Through MRCL (14.22 kms)

8 Angul-Balram Rail Link as part of Inner Corridor through MCRL (14.22 kms through SPV (MCRL) by IRCON) Mahanadi Coal Railway Ltd (Equity Shares: MCL-64%, IRCON-26% & GoO-10%) TDC for Angul - Balaram (14.22 Km) – One year after funds released by SPV Inflated mileage and Financial Closure yet to be done TDC – March’ 2022

Rail Projects Funded by Railways Doubling from Singrauli to Shaktinagar via Karaila Road Doubling of Singrauli to Mahadiya and Mahadiya to Katni section Third line between Barkakana-Barwadih-Garhwa Road Fourth line between Jharsuguda to Bilaspur DFC- Dadri to Sonnagar & extension upto Koderma Third and Fourth Lines from Talcher to Budhapank & Third Line from Budhapank to Rajathgarh

Rail Projects Funded by Railways 9 Doubling of Rail line from Singrauli to Shaktinagar via Karaila Road (45 kms) Chopan Billi Karaila Road Singrauli RAMNA Shaktinagar Garhwa Road

Rail Projects Funded by Railways 9 Doubling of Rail line from Singrauli to Shaktinagar via Karaila Road (45 kms) Land acquisition under progress Tenders already finalized TDC for Shaktinagar-Karaila Road – Dec’ 2019 TDC for Karaila Road-Singrauli – June’ 2019

Doubling of Singrauli to Mahadiya and Mahadiya to Katni section (260 kms)

Rail Projects Funded by Railways Doubling of Singrauli to Mahadiya and Mahadiya to Katni section (260 kms) Works in progress Commissioning Plans: 2018-19 --- 59 kms 2019-20 --- 83 kms 2020-21 --- 66 kms 2021-22 --- 52 kms TDC ---- March’2022

11 Third line Barkakana – Barwadih - Garhwa Road (291 kms) Sonnagar Garhwa Road Barwadih Patratu Barkakana

Rail Projects funded by Railways 11 Third line Patratu – Tori – Sonnagar (291 kms) By RVNL Out of 5 packages, tenders for 2 packages are under finalization. Tenders for 2 packages opened in June’2018. Tender for remaining 1 package being invited. Commissioning Plans Total Length – 291 Km 2019-20 85 Km 2020-21 100 Km 2021-22 106 Km TDC –March’ 2022

12 Fourth line between Jharsuguda to Bilaspur (195 kms) Kharsia Champa Jharsuguda

Rail Projects funded by Railways 12 Fourth line between Jharsuguda to Bilaspur (195 kms) By SECR 3rd line between Bilaspur-Kharsia completed except Champa – Saregaon (9 Km) to be completed by Dec’2018 TDC –Dec’ 18

13 DFC- Dadri to Sonnagar & extension upto Koderma

Rail Projects Funded by Railways DFC- Dadri to Sonnagar & extension upto Koderma By DFCCIL Works in Progress.

14 Third and Fourth lines from Talcher to Budhapank and Third line from Budhapank to Rajathgarh

Rail Projects Funded by Railways 14 Third and Fourth Lines - Talcher to Budhapank (10 km) & Third Line from Budhapank to Rajathgarh (62 km) By ECoR Budhapank to Talcher land acquisition under process TDC – Talcher-Budhapank (10 Kms) - Feb’ 2019 TDC – Budhapank-Rajathgarh (62 Kms) - Dec’2020

Thank You