NERC PRC Drafting Team Voltage Ride-Through (VRT) Curve Genesis

Slides:



Advertisements
Similar presentations
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Advertisements

Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
BAL-002-WECC-1 Contingency Reserves
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
Overview of WECC Comments to FERC on the NOPR Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt.
NERC Fill in the Blank Standards Efforts Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Marv Landauer Report to TSS on RS Activities April 25-27, 2012 Salt Lake City.
Gene Henneberg RAS Criterion Drafting Team Chair WECC Reliability Subcommittee’s RAS Criterion Concerns 4/28/2011 San Diego, California.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report Oct 24th, 2013 Anaheim, CA.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 25,26 th, 2015 Salt Lake City, UT.
Single Phase Compressor Point-on-Wave Response Including tests done at BPA Bernie Lesieutre (UW-Madison, LBNL) Dmitry Kosterev Steve YangErik Lane (BPA)
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Project WECC-0100 Update Reliability Subcommittee February 2014.
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
NERC Event Analysis Update Member Representatives Committee Meeting October 28, 2008 Robert W. Cummings NERC Director of Event Analysis & Information Exchange.
Submittal of C as an IEC/IEEE Dual Logo Document IEEE Switchgear Committee Main Committee Meeting 18 October 2007.
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
JJ Jamieson MIC Chair JGC update September 2014 Salt Lake City.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American.
Discussion and Preliminary Findings Concerning Voltage Reduction (VR) for Peak Shaving Mark Carpenter Sr. VP T&D Operations December 6, 2012 Presentation.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
Document Categorization Policy Chris Albrecht, Legal Counsel W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Planning Coordinator - Gap Resolution Team Lorissa Jones – GRT Chair PCC Update March 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RASRS Report to Operating Committee March 22, 2015 Gene Henneberg, Chair Remedial Action Scheme Reliability Subcommittee W ESTERN E LECTRICITY C OORDINATING.
NERC LMTF: Current Activities Ryan Quint, PhD, PE Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
Jagan Mandavilli Senior Reliability Engineer Texas RE NERC DERTF Update ERERERCOT WMS June 3, 2015.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
Kenneth Silver Los Angeles Department of Water & Power
RASRS Report to Operating Committee March 21, 2017
Inverter Disconnects During Transmission Disturbances
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
WECC Regional Standards Update
Next Steps in Load Modeling
Project WECC-0100 Update Load Modeling Task Force
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Specifications Updates and Approval
CMPLDWG Composite Model with Distributed Generation Approval
Integration of Variable Generation Task Force (IVGTF)
Workshop Session 1: Overview
Yale Runback Local Area Protection Scheme
Integration of Variable Generation Task Force (IVGTF): Status
Workshop Session 1: Overview
Integration of Variable Generation Task Force (IVGTF)
CMPLDWG Composite Model with Distributed Generation Approval
Project WECC-0100 Update Reliability Subcommittee
Steve Rueckert – Director of Standards
Donald Davies Chief Senior Engineer
Project WECC-0100 Update Load Modeling Task Force
Variable Generation Subcommittee Update to PCC
Document Categorization Policy
Changes to Annual Salary Distribution Policy SAPP
Information Sharing Policy Update March 25-26, 2014
Presentation transcript:

NERC PRC-024-2 Drafting Team Voltage Ride-Through (VRT) Curve Genesis NERC Generation Standards Drafting Team September 15-17, 2008 Dallas, TX NERC PRC-024-2 Drafting Team Voltage Ride-Through (VRT) Curve Genesis Craig Quist, PE PacifiCorp, Transmission Planning Salt Lake City, Utah

Voltage Ride – Through Standard Based on an earlier request from the WECC Voltage Ride-Through (VRT) Standard Task Force, the WGTF has been working on a VRT white paper that would be used as the justification for a new VRT Standard. This white paper discusses the low voltage, low voltage recovery and high voltage period, immediately following a system event. The white paper was approved by the Technical Studies Subcommittee (TSS) on 5-22-07 and distributed on 6-13-07. When reviewing the paper, references to generator, wind plant or wind farm should be considered synonymous with each other.

WECC VRT Curve vs. Voltage Traces Disturbance voltages traces (at POI) fit within the defined WECC VRT Curve (SLG Faults added to during NERC evaluation) Issues were raised by the PRC-024-2 drafting team concerning voltage duration at specific locations on the curve. As PRC-024-2 is a generator protection system standard (vs. generator performance standard), questions surfaced concerning how such a curve can be applied? Generator protection relays typically utilize voltage duration

Time Duration - Voltage Traces & WECC VRT Std The approach of the PRC-024-2 drafting team shifted to defining time duration for generator protection To develop a time duration VRT boundary it was determined that the voltage traces provided in the WECC white paper could be converted to time duration format Additional SLG fault voltage traces and Southern Company voltage traces were also added

Time Duration - Voltage Traces & New NERC Std Initially, a “zero margin” boundary was defined as an envelope for the time duration curves However, it was determined that margin would be added along with SLG voltage traces to develop the new time duration boundary Additionally, voltage traces from Southern Company were entered to form the Pink curve. The new time duration boundary reshaped both the low voltage and high voltage boundaries from those proposed by WECC white paper. HVRT Reduction Relay Failure FERC 9 Cycle Limit

Proposed PRC-24-02 VRT Standard

Other PRC-24-02 VRT Participant Inputs Areva Provided the European LVRT voltage performance standard Suggest sticking with a regular scale for criteria.  Mixing criteria between this and the log scale gets confusing. The voltage prior to the fault should be clarified Previous curves stopped at 4 seconds.  This curve goes out to 10 seconds Excel Energy SLG feedback When fed from a unit-connected transformer or a delta-wye wound transmission-connected transformer, most low voltage AC contactors will probably ride through close-in SLG faults on the transmission system. However, if fed from a wye-wye wound transmission-connected transformer, many will probably drop out, even with fast clearing.

NERC Time Duration Curve vs. WECC VRT Std Comparison of NERC time duration curve with the WECC white paper curve illustrates areas that the VRT curve could be modified.

PRC-024-WECC-1-CR - Generator Low Voltage Ride-Through Criterion On 9-10-08, WECC distributed the PRC-024-WECC-1-CR - Generator Low Voltage Ride-Through Criterion. In developing the criterion, the WECC Reliability Subcommittee (RS) decided to let the NERC PRC-024-2 drafting team do the “heavy lifting” in developing a new standard.  Effectively, changes were made to bring the WECC standard in-line with the current FERC LVRT standard. Comments are due 10-10-08. Chart Source: Brendan Kirby (AWEA)

Questions?