Friends of Saintbridge Pond

Slides:



Advertisements
Similar presentations
The Seasons of the Year.
Advertisements

HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Club Projects Garden Club of Monroeville, PA 2012 Event Calendar We support conservation and civic goals by:  MAINTAINING TWO MONROEVILLE GARDENS (College.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Weather Fatima Emirova.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
The months of the year January February. The months of the year March April.
Chapter 2 Sets and Functions Section 2.2 Operations on Two Sets.
Raising Vegetables For Market Part Two 1. Review of Last Workshop’s Main Points 2. Where to Plant Your Different crops 3. Information about Different Vegetables.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Lesson 41 first second third fifth eighth ninth twelfth fifteenth twentieth twenty-first one two three five eight nine twelve fifteen twenty twenty-one.
Department of Medicine Faculty Development
PHIA 2017 Agenda President – Accomplishments, Initiatives (7:05-7:15)
Jan 2016 Solar Lunar Data.
IT Strategy Roadmap Template
Do you want to save the Earth?
How many ...?.
The 15th of March Class work
Unit 1 When is your birthday
Seasons Интерактивная презентация учитель английского языка
Payroll Calendar Fiscal Year
Baltimore.
COSMO Priority Project ”Quantitative Precipitation Forecasts”
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Average Monthly Temperature and Rainfall
2018 Safety Group 1 – 5 Year Program Timeline Guide
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
Constructing Climate Graphs
2017 Safety Group 1 – 5 Year Program Timeline Guide
EMPLOYEE SUPPORT PROGRAM JAN. 2018
2018/2019 School Calendar July August September October November
Mammoth Caves National Park, Kentucky
The Message in a Bottle story
Due Dates subject to change. Watch for dashboard updates.
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Irregularities in DoRIS
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
McDonald’s Kalender 2009.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
2019 Safety Group 1 – 5 Year Program Timeline Guide
McDonald’s calendar 2007.
A Climate Study of Daily Temperature Change From the Previous Day
Irregularities in DoRIS
2014 Advantage Program Timeline Guide *** Progress Visits ***
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
2016 Safety Group 1 – 5 Year Program Timeline Guide
Text for section 1 1 Text for section 2 2 Text for section 3 3
McDonald’s calendar 2007.
PLAYMATES LEARNING CENTER CALENDAR
2012 Safety Group 1 – 5 Year Program Timeline Guide
Budget Planning Calendar
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Friends of Saintbridge Pond Annual General Meeting 2016
Unit 3 My school calendar
2015 January February March April May June July August September
Presentation transcript:

Friends of Saintbridge Pond Annual Maintenance Plan 2016-17 Outline of Tasks for Completion July 2016 – June 2017 for areas of Saintbridge Pond

B Spinney / Scenic Route Friends of Saintbridge Pond Outline of Tasks for Completion July 2016 – June 2017 WORK AREA WORK TO BE DONE WHOSE RESPONSIBILITY A Large Island Take out undergrowth to thin, timber needs to be stacked and treated, and will be removed by an allotmenteer Larger items will be highlighted so they can be removed Consider bird box location and orientation Ken & Rob Don Amey FOSP (PB/KP/WA) Aston to chip in where necessary B Spinney / Scenic Route Reckie undertaken and trees are marked for removal FOSP should support wood removal and contact two allotmenteers which will remove the wood. Willow needs to be removed when the soil is hard, which should be replaced with Hazel whips. Woodchip the logs which are now growing Scythe necessary areas FOSP Dave & Dom FOSP, with help from allotments FOSP FOSP C Perimeter Banks Work must be carried out in a rotational basis and FOSP must be flexible to work with wildflowers. Take control in April.

F1 Feeding Area to silt trap WORK AREA WORK TO BE DONE WHOSE RESPONSIBILITY D Willow Bed Hazel whips being planted to solidify the bank Regular maintenance of the existing vegetation, allow winter to work for you, glycemate the remaining vegetation in the spring to take control. (Funding Required: Winter) FOSP & Justin FOSP E Silt Beds GCC promised to dredge the area in the near future Work on beautifying the perimeter, i.e. Planting attractive species or changing conditions to encourage wildflowers. DP FOSP F1 Feeding Area to silt trap Further develop a grassed area, either in March/April or September/October time of year. (Funding Required: Oct) Trees promised to be cut back by GCC Seed in the autumn, need to allow plants to bounce back. FOSP GCC FOSP F2 Fruit Trees Prune and train the roses and trees in the community gardens over autumn. This can be added to by FOSP members who want a less conventional job. Ken & Rob, with support from FOSP. G Silt Traps This is ongoing work to clear the traps

J Container & Notice Board WORK AREA WORK TO BE DONE WHOSE RESPONSIBILITY H Community Gardens NB – Community gardens includes F2 Orchard Raised beds have to be moved and trained on a six year cycle with three different types of fruit. Greenhouse and cold frames need to be constructed. Open gardens and grassed area need to be weed controlled with green manure, after which easy frequent maintenance needs to take place. Rob and Ken predominently, however open access to FOSP members looking for something different. I Smaller Island Be led by swans, plan is to make a raft that rises with the water level so swans can make a safe nest (Sept onwards) Clear the area of willow, replace with reeds and flag, create and install Plantoon. (Wood from Paul Wildgoose) Aston Project if possible, if not KP, Rob, WA J Container & Notice Board Paint the container with protective paint Install container for and move GL4’s items with committee Install measures to prevent flooding Itinerary to be conducted twice per year (Aug/Sept & Jan) MM, KP KP & GL4 KP & FOSP TB K Bird Boxes Bird boxes, need to be cleaned and contents or evidence recorded. Need to consider the position of new boxes and if existing boxes are in good places or need to be relocated. What species could be homed in boxes on the large island? PB for birds & WA for maps

WORK AREA WORK TO BE DONE WHOSE RESPONSIBILITY Chicane These bars are to be pained to look more professional and natural, Green Matt paint necessary to give sun protection and is cheap. Would need permission from GCC. FOSP Notice Board One at the start of the spinney, one by the play area/pine road. Play Area or Equipment Natural play area still in consideration, would diversify site purposes for green flag, however further research from the public required. (Potential Funding Required 2017) FOSP should consider the maintenance for the equipment, and the liability that ensues of a play area near water. There are however no play areas in the ward. A potential location would be at the double silt trap end of the spinney, where young people regularly play already, there are some open but sheltered spaces to be utilised. The dry balancing pond cannot be used as its purpose is flooding, and proximity to houses needs to be considered. A small and natural area would be desirable. Investigation by one member, Responsibility based on scale of work to be done. Seating log by F1 Log has rolled into the pond, need to produce a slip trench in order to prevent this happening again in future. KP & FOSP

WORK AREA WORK TO BE DONE WHOSE RESPONSIBILITY Wildflowers The map of wildflowers and bulbs need to be reviewed in the near future and re-evaluated with new ideas. Vegetation needs to be kept under control. FOSP Signage Larger signs than the metal existing ones are necessary, however this is low priority, they will come with time and this will be linked to the green flag. Two existing interpretation boards need to be reconsidered. FOSP (GCC)

2017 2016 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC A 2 1 B 3 4 C D E F F2 G ONGOING H I J K

July

August

September

October

November

December

January

February

March

April

May

June