MRP Introduction EXAMPLES

Slides:



Advertisements
Similar presentations
Aggregate Planning. Dealing with the Problem Complexity through Decomposition Aggregate Planning Master Production Scheduling Materials Requirement Planning.
Advertisements

Material Requirements Planning
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
Material Requirements Planning
Principles of Operations Management
Material Requirements Planning (MRP)
Materials Requirements Planning (MRP) Chapter 16 in Schroeder.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
MRP: MRP: Material Requirements Planning Manufacturing Resource Planning.
Introduction to Production Planning. The role of hierarchical production planning in modern corporations: An MRP-based “push” framework (borrowed from.
Material Requirements Planning Dr. Everette S. Gardner, Jr.
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP, MRP II, and ERP.
Material Requirements Planning
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
11/10: MRP continued. Review: Material Requirements Planning Need to know: –Master Schedule –Bill of Materials –Lead times –Due date. Go to spreadsheet.
Resource Planning Chapter 14. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Session 10 Material Requirements Planning pom
Materials Requirements Planning
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Material Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
Hierarchy of Production Decisions
4/4: Material Requirements Planning Dependent inventory model For in-house inventory planning.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Aggregate Planning and Resource Planning Chapters 13 and 14.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Production Planning and Control
Resource Planning Chapter 15.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
Dr. S. S. Bhakar Director, PIMG. ‘‘ I often feel like the director of a cemetery. I have a lot of people under me. But nobody listens! ’’ - General John.
CHAPTER-14 MRP AND ERP MD. TAZIDUL ISLAM. 2  Material Requirement Planning (MRP) is the concept of designing and developing information system to aid.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
SISTEM INFORMASI ENTERPRISE
LESSON 5 Introduction to Materials Requirements Planning (MRP)
MATERIAL Requirements planning MRP
FDFPLSCP4A Manage and schedule production
Facility Inventory Old Facilities Modern Facilities Classroom Size
Materials Requirements Planning
Production Planning & Scheduling in Large Corporations
BUAD306 MRP/ERP.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16 Materials Requirements Planning
MRP.
MRP and ERP.
MATERIAL Requirements planning MRP
Material Requirement Planning (MRP)
Introduction to Production Planning
14 MRP and ERP.
Material Requirement Planning (MRP)
Resource Planning Chapter 16
Chapter 14 Dependent Demand
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

MRP Introduction EXAMPLES Joanna Oleśków Szłapka Production Management

Dealing with the Problem Complexity through Decomposition Corporate Strategy Aggregate Unit Demand Aggregate Planning (Plan. Hor.: 1 year, Time Unit: 1 month) Capacity and Aggregate Production Plans End Item (SKU) Demand Master Production Scheduling (Plan. Hor.: a few months, Time Unit: 1 week) SKU-level Production Plans Manufacturing and Procurement lead times Materials Requirement Planning (Plan. Hor.: a few months, Time Unit: 1 week) Component Production lots and due dates Part process plans Shop floor-level Production Control (Plan. Hor.: a day or a shift, Time Unit: real-time)

The “MRP Explosion” Calculus Lead Times Lot Sizing Policies BOM MRP MPS Current Availabilities Planned Order Releases Priority Planning

Independent vs. Dependent Demand Independent Demand (finished goods and spare parts) B(4) C(2) D(2) E(1) D(3) F(2) Dependent Demand (components) 3

The “MRP Explosion” Calculus External Demand Level 0 Capacity Planning Initial Inventories Level 1 Level 2 Scheduled Receipts Level N Planned Order Releases Gross Requirements

Example: BOM for an end Item A C B D A Level 0 Level 1 1 1 1 2 2 2 Level 2 2 2 6

C B D A 1 3 25 50 25 50 25 50 25 50 50 50 50 1 2 50 50 50 POHt = POHt-1 - GRt + Rt 50*1 50*1 50*1 50 50 50 50 50 50 100 100 7

100*1 50*3 50*3 50*3 C B D A 150 100 150 150 20 120 20 120 120 220 220 220 1 3 250 250 250 250 1 2 (100*2) +10 10 10 210 10 10 10 10 10 40 30 20 10 200 190 180 170 200 200 8

1. Fixed Order Quantity (FOQ) Specify a number of units arbitrarily to be ordered each time an order is placed for a particular item. Quantity may be arbitrary or EOQ 240 80 460 200 570 450 265 150 500 500 500 500 9

2. Economic Order Quantity (EOQ) A type of fixed order quantity that determines the amount of an item to be purchased or produced at one time. Wish to minimize the combined cost of order (acquiring) and carrying inventory. EOQ = D = Annual demand for the item Q = Order quantity CP = Cost of order preparation or Setup cost CH = Inventory carrying cost per unit per year 10

Example: EOQ Setup cost = $10/order Cost of item = $1.50/unit Inventory carrying cost = 25% /year = 240 80 610 350 220 100 565 450 650 650 650 650 Avg. Demand = 152.5/wk D = 152.5  52 wks/yr = 7,930 EOQ = = = 650 11

3. Lot-for-Lot (L4L) aka. discrete order quantity It generates planned orders in quantities equal to the net requirements in each period. No extra on-hand inventory. Used for perishable food items or items for which the market fluctuates widely. 12

Example: Lot-for-Lot 80 130 160 80 80 80 80 80 80 80 80 120 260 130 120 185 115 120 260 130 120 185 115 13

MRP Example 1 A LT=3 C(3) LT=4 D(2) LT=2 Given the following information, determine when orders should be released for A, C, and D and the size of those orders A LT=3 C(3) LT=4 D(2) LT=2 Parts On hand Scheduled Receipts Lot Size Demand A C D 10 140 200 250, period 2 L4L Mult 50 Mult 250 100, period 8

MRP Example 2 B LT=2 D(3) A LT=3 C(3) LT=4 D(2) LT=2 Given the following information, determine when orders should be released for A, B, C, and D and the size of those orders. Parts On hand Scheduled Receipts Lot Size Demand A B C D 10 5 140 200 250, period 2 L4L Mult 50 Mult 250 100, period 8 200, period 6 -

Product structure tree & MRP schedule - EXAMPLE Assume that Product Z is made up of two units of A and four units of B.   The lead time for Z is two weeks. The lead time for all other units is one week.  The demand for Z is 100 units in Week 10 and 200 units in Week 14.  The lot size for Z and A are Lot-for-Lot (LFL).  The lot size for B is 500+ units (FOQ).  For Z, and A there are no units on hand, no safety stock, and no units allocated.  Item B has 500 units on hand, 100 units of safety stock and 100 units already allocated.   a)  Develop an MRP schedule showing the gross and net requirements and the planned order receipts and releases for Product Z and each of its components.