AdV - Internal Review of VAC subsystem

Slides:



Advertisements
Similar presentations
UHV gate valve Readiness Review 20Sept2012. Notes/remarks/proposals 1) with standard configuration, seems hard to keep cold the actuator? ( VAT) 2) position.
Advertisements

Q&A Smalltraps RReview 19Feb2014. From C. Michel: Congratulations for the Vac Team: the project is mature and ready for the manufacturing step. Nevertheless.
GAS SYSTEM STATUS Phase II HELIUM4 GAS SYSTEM STATUS >Status update >Result of TAO Tests >Thermodynamic behavior of the gas >Computational fluid dynamics.
Vac meeting 08 Oct 08 Agenda 1. needed operations for towers displacements (Frederic R.) final comments on the 2m bottom not accessible anymore 2. Larger.
February 9, 2002 Muon Collaboration Technical Board Michael Iarocci E951 Cryogenics1 Cryogenic Cooling System for the E951 Pulsed Solenoid Magnet Basic.
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
KAGRA Vacuum System Items of vacuum sub-group 1 1. Overview VAC (YS) Required Pressure “uhv (ultra-high-vacuum)” in the order of Pa, or lower.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
Observations on possible factors affecting LAr purity on the 50kton TPC from the viewpoint of the internal walls Alejandro S. Díaz Chemical Engineering.
1 VAC – Vacuum system modifications Cascina, 03Nov08 A.Pasqualetti for the VAC contributors.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
1 VAC – Vacuum system modifications ERC telecon, 24Mar09 A.Pasqualetti for the VAC team.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
FLAO commissioning with InfraRed Test Camera (IRTC) S. Esposito, G. Brusa, A. Riccardi FLAO system external review, Florence, 30/31 March 2009.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
Vacuum system.
E. Doyle 7/20/06 rev 9/13/06 1 / 16RF Coupler Assembly Facility SLAC TTF3 Coupler Assembly Facility Specifications Based on TESLA facility built at LAL,
The Role of the Design Engineer in Technology Development 3/21/13 Auburn University Robert Kline.
AdV cryotrap: cryostat surface is partially exposed to the near mirror (input ~ end). Its seismic shaking is amplified by LN2 boiling. The rest of vacuum.
The investigation of optical inhomogeneities of the multilayer mirrors progress report Moscow State University Bilenko I.A
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina March 4,
AdV-VAC meeting 21Apr’09 Agenda 1) results from the reviews (A.Pasqualetti) 2) present wbs, present project planning, baseline design (A.Pasqualetti) 3)
January 12, 2006ILIAS-WG3 Frascati1 Virgo+ & Advanced Virgo B. Mours With material from G. Losurdo, M. Punturo, A. Viceré and others.
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
EMAS Stirling Cooler Operations June 29, 2011 Mike Watson.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Overview of Methanol Model
Hall D Target System Review J. FochtmanSeptember 28,2011 Preliminary Design Work.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?
LCGT f2f meeting/ICRR, 04/Aug./2011 N. KIMURA Status of the Cryogenics Design N. KIMURA A, S. KOIKE B, T. KUME B, T. OHMORI D, Y. SAITO C, Y. SAKAKIBARA.
Feasibility Analysis of a Two Phase Solar Thermal Water Heater Solar Thermal Solutions (M15) Project Supervisor: Dr. Y. Muzychka April 3 rd, 2014 Marcus.
TDI-Brooks International Nov 2015
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
1 CD-2 ECP Preparations What is Needed. 2 Background As part of the CD-2 process, we need to establish a fully supported and documented cost and schedule.
LIGO-G D Core Optics Components (COC) Polishing Pathfinder Kickoff Advanced LIGO Project GariLynn Billingsley Caltech.
ET Vacuum System 3 x (low frequency cryo-interferometer + high frequency warm-interferometer) Baseline solution Build one detector, the other two will.
New nTOF target: Design Issues
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
How Does HNOSS Operate? Rocío Santiago Kern 20th May 2016.
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues
1.3-GHz Cavity Vacuum Furnace at IB4
Status of the CO2 Cooling Project
Innovative He cycle Francois Millet.
Leak Detection Tutorial Work
SPS cryogenic proximity equipment and SM18 validation
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Renovation of the 45-year old PS magnets
CRYOGENICS OPERATIONS 2008 Organized by CERN
Update on out-gassing tests
2K CB FDR Overview:  Agenda, Charge, Review Process
PARTICULATES PROGRAM WP500
Behaviour of M2 & M3 general construction in case of Fire Event (BMFE)
LAMAS Working Group December 2013
DSC ChMC CSS update 11th December 2018
Installation of Photon Beam Transport to FEH
Sketch and rough estimation of a colder trap for AdV central area
Periodical meeting about the 'control system ‘
‘New stations’ generic Layout Preliminary, NDRC or MSRC?
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
Presentation transcript:

AdV - Internal Review of VAC subsystem Cryotrap design, 04 Mar 09 Summary: First issues from the 1st part of the review 2nd part : Agenda of presentations Planning and manpower

Cryotrap impact on phase noise Small-Large options similar vs vacuum performances = practically equivalent vs impact on phase noise, Design is driven by mechanical design, installation risks, easyness of operation, budget , diffused light mitigation… Optimization in progress: light shortening of the small trap (2.4m -> 2.0m ) _mechanical positioning of the ports for vacuum equipment _favourable for diffused light issue The average pressure increases by a factor about 1.5 phase noise for small and large traps , with low tube outg. to evidence performances

New trap : 2.0m long, 1m dia, 0.6m baffles, preliminary Water pressure, torr Safety factor vs goal pressure, 10-9mbar, is reasonabe

Bake-out equipment and experience

Bake-out equipment and experience

Traps periodical Regenerations A first evaluation of deposited water on a trap: regeneration of the trap driven by the extra-cost due to LN2 consumption and the general plan of the AdV activity. We don’t expect to regenerate traps more than once/twice a year. A possible procedure , to be discussed _close vacuum valves, remove LN2 from trap _ purge with ‘hot’ GN2 (Pwater<Psat) 2 days, tbc _ evacuation 1 day _ LN2 refill, cooldown _ temp steady reached < 2 days

Plan and manpower estimation, in preparation Dedicade web page by AdV coordinators http://wwwcascina.virgo.infn.it/advirgo/protected/project_management.html AdVplan http://wwwcascina.virgo.infn.it/advirgo/protected/docs/AdV_plan.pdf Design finalization http://wwwcascina.virgo.infn.it/advirgo/docs/forms/VAC_DFF.doc Construction tasks http://wwwcascina.virgo.infn.it/advirgo/docs/forms/VAC_CTF.doc

4 March , part II of the review: preliminary design, thermal and diffused light issues, costs, planning, man power Agenda of presentations 15' Trap mechanical design, J.VDBrand/M.Doets  15' Optical constraints and scattered light, C.Bradaschia  15' Thermal effects on test masses, A.Rocchi  60' General discussion