API RP 59 June 2017 Recommended Practice for Well Control Operations

Slides:



Advertisements
Similar presentations
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
Advertisements

2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
API 16 AR Specification for Drill-through Equipment Remanufacturing
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SCR 22 Task Force on State Educational Technology July 9, 2015.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
Options for CBP Agreement and EC Membership For Principals’ Staff Committee Consideration March, 2013.
1 API 16A 3 rd Edition Winter Conference Jan API 16A Chairman: John Busby Co-Chair: Jim McCabe.
Shelter Meeting 09b is hosted by UNHCR Safer Homes, Stronger Communities: Rebuilding After Disaster Update of “Safer Homes, Stronger Communities: Rebuilding.
1220 L Street, NW Washington, DC Executive Committee on Standardization of Oilfield Equipment & Materials (ECS) New Member Orientation.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Yong-Yi Wang, Chair API 1104 Committee Meeting Washington, DC June 30, 2010 Report of Fracture Mechanics Subcommittee.
Environmental Sustainability Master Plan Update November 18, 2015.
San Francisco, CA. SC8 Liaison Report
19th January 2012 Don Wells (Hess)
Subcommittee 21 - Materials Act as a resource on materials issues affecting multiple subcommittees under the Committee on Standardization of Oilfield Equipment.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC19 HPHT Template (Proposed as SC19TR1)
Co-Sponsors: China, Japan, EU and US 59th Session GRSP May 9-13, 2016
DROPS Focus Groups Human Factors
Campus Master Plan.
API SC 10, Work Group 3 Update:
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
API 16C Choke and Kill Equipment
API 17Q – Subsea Equipment Qualification
API 16F June 2017 Specification for Marine Drilling Riser Equipment
Task Force on Seasonal Adjustment of Quarterly National Accounts Item 3.1 Recommendations 2002: Implementation and items for review in 2007 Henning.
Status Update on API 16Q / 16R / 16F
API 16A June 2017 Specification for Drill-through Equipment
2016 Exploration & Production Standards Conference Subcommittee 10
API 16RCD June 2017 Specification for Rotating Control Devices – Update.
Specification on float equipment
First 8 slides are what was presented in San Fransisco…
API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update.
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC-16 task group for Specification 16D
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
Before During After Follow-up Resolve Review Pre-review Familiarize
API 16B June 2017 Specification for Coiled Tubing, Snubbing and Wireline Well Control Stack Equipment Chairman – Alex Sas-Jaworsky PE Vice-Chairman –
2016 Exploration & Production Summer Standards Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16AR Specification for Drill-through Equipment Remanufacturing
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API Standard 53 Update June 2017
API 16 AR Specification for Drill-through Equipment Remanufacturing
2016 Exploration & Production Summer Standards Conference
API 16 AR Specification for Drill-through Equipment Remanufacturing
TECHNICAL EVALUATION.
Singular Selection of Format
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Path Framework, All Firms (2014)
Project Kick-off <Customer Name> <Project Name>
Workshop: Equipment June 29, 2006.
API SC6 Valves and Wellhead Equipment
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API RP 16AS January 2019 Standard for BOP Systems
API 16C Choke and Kill Equipment
API 16A January 24, 2019 Winter Conference – San Antonio
API STANDARD 64 THIRD EDITION, AUGUST 2017 ADDENDUM 1, DECEMBER 2018 ERRATA 1, MARCH 2018 Diverter Equipment Systems.
API RP 59 Well Control Operations Chair – Tom Proehl
Ad Hoc Team (AHT) Lifecycle
Well Intervention Well Control 2019 API E&P Winter Conference Update
Presentation transcript:

API RP 59 June 2017 Recommended Practice for Well Control Operations 5-Year Review Update

API RP Scope This publication is designed to serve as a direct field aid in well control and as a technical source for teaching well control principles This publication establishes recommended practices to retain pressure control of the well under pre-kick conditions and recommended practices to be utilized during a kick Scope being reviewed now 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

API RP 59 HISTORY Second Edition issued May, 2006 Reaffirmed January, 2012 Under review June, 2017 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

API 59 Review Status Agreed to keep this publication as a Recommend Practice Debating where RP59 should kick in Debating “Pre-Kick-Events” Debating what coverage should remain in RP Agreed MPD should not be included Evaluate alignment with IADC Deep Water Well Control Guidelines 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

API RP 59 - Path Forward Task Group members to read document thoroughly Individual sections of RP59 have been assigned for particular scrutiny by people familiar with technical content Will meet again after summer break Possible alignment with Well Control Committee of IADC 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org