Monday 24 October 2011 24 hours of 25ns MD

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Wednesday
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Machine Coordinators: G. Arduini, J. Wenninger
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Tuesday Nov 16th Fill 1492 into physics around 07.30
Monday fill with 1092 bunches (6 h stable beams)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Thursday morning – optics correction
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Monday – recovery from MKI flashover
Wednesday 31 October: Morning
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Friday morning 10:30 Optics measurements and corrections.
Tuesday 9th November 10:02 Fill beams dumped
LHC Morning Meeting - G. Arduini
Sunday
Wednesday 03/11 – The Plan Finish electron-cloud program:
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Monday 14:00 beam dump Access:
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Monday :15 fill 3523 dumped by BPMs IP6
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC - Week 38 Technical stop: Katy Foraz
Friday 28 October 2011.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Injection Studies: 50 ns ABT/BTP.
Monday 27th August & night
Wednesday 26 October 2011.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday 14:30 Fill 2011 dumped.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Saturday 26 November 2011.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
HI2011 Commissioning Status
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Monday 24 October 2011 24 hours of 25ns MD Fill with 72 bunches, scrub and study e-cloud effects

Overview Till 16:30 set-up of injection B2 Issues: Losses injection B2 Vacuum interlock MKI 16:30 – 20:28 Fill 2249: 1020 bunches each beam Dumped by BPM interlock 20:30 – 1:00 Fill 2250: B1 2096 bunches; B2 804 bunches 3:30 – now Fill 2251: B1 2100 bunches; B2 1020 bunches

Preparations: 07:40 loaded 25 ns settings for ADT 08:24 Increased vacuum threshold for the injection of B2 from 2x10-9 mbar to 2.5 x10-9 mbar 9:00 LHC and injectors ready for 25ns beam Correcting injection oscillations and injection phase 9:57 All e-cloud solenoids in the experimental areas have been switched off Typical beam parameters: Emittances measured in LHC: 2.5 – 3.5um Intensity: 1.25x1011 p/bunch  lowered to 1x1011 in the afternoon

High losses when injecting 10:50 Dump by Beam Losses during injection of B1 (12b in, 72 were not extracted from SPS, but losses above threshold were seen at ALICE and at 4R2) suspect that dump was due to satellites after the 12b (PS reduced the kicker length for the 12 bunches injection) 11:57 Dump by Beam Losses during injection of B2 (12b in, we were injecting the 72b) TI8 line needs further steering 12:34 Dump, losses injection B2. Line trajectory, losses and injection oscillations are fine with 12 bunches, we cannot do better but losses increase by a factor 100 when injecting 72 bunches and trajectory gets much worse 13:02 Vacuum interlocks changed from 4E-7mbar to 2E-6mbar: 3 gauges in IP3 and 9 gauges in IP7. 13:27 dump on losses injection B2.

Summary Injection of 72 bunches with 25 ns (Chiara, Wolfgang) Beam 1: corrected injection oscillations in the horizontal plane then OK ==> losses at 15% of dump threshold at MSIB for 72 bunches Beam 2: injection with 12 bunches looked fine but beam was dumped when injecting 72 bunches (losses at MQ6 at ~200%). We steered the line in both planes but situation did not improve: Losses at MQ6 increased by a factor 100 and trajectory at the last collimators got worse by a factor 3, when passing from 12 to 72 bunches. We injected 36 bunches to check injection oscillations and we saw horizontal oscillations increasing along the train starting from the 20th bunch ==> problem with MKE4 SPS extraction kicker. We tried to add the second CNGS cycle in the SPS but this did not solve the problem Correction for steering in the horizontal plane calculated on the injection of 36 bunches ==> check injection with 12 bunches and found optimum tradeoff between trajectory and injection oscillations (lengthy procedure since it requires continuous cycle change in the SPS 12-36 bunches: beam setup in the injectors) We managed to inject 72 bunches with losses at 40% from dump thresholds at MQ6. We still see a pattern in the injection oscillations along the train IMPORTANT: scan with beam of MKE4 flattop to be performed Xmas stop!

25ns MD continues Fill 2249 16:30 injection set-up finished. Managed to inject the 72 bunches with a trajectory correction based on 36 bunches. This was necessary because the horizontal trajectory of the bunches is changing along the train because of the shape of the SPS extraction kicker MKE4. Switching solenoids at MKI to 3A for injection and OFF for scraping 20:20 1020 bunches in each beam: cryogenics measurements 20:28 Dump by BPM in IR6: intensity of some bunches was too low. Joerg increased the SIS threshold on MKI2 (B1) vacuum to 2.5 10-9 mbar in agreement with M. Barnes

BSRT bunch by bunch transverse beam size (Fill 2249) Horizontal Vertical

FBCT Measurements (Fill 2249)

Vacuum at MKI – injection limit at 2.5 x10-9 mbar

Continue with New Fill (#2250) 00:50 B1 2096 bunches; B2 804 bunches 00:59 Dump: some bunches below BPM detection level

00:50 vacuum at MKIs Solenoid switched off

B1 emittance from BSRT

B2 emittance from BSRT

1:06 MKI B2 in faulty state during soft start 1:06 MKI B2 in faulty state during soft start... suddenly back in ON state Vacuum spike after soft-start Vacuum interlock: called Mike Barnes, he needs to do an extended soft start (finished at 3:30) Continuing with B1 pilot in the meantime

4:00 back to injection 72 bunches: Still very high injection losses for B2 5:50 1020 bunches for both beams in the LHC

7:09 2100 bunches B1 and 1020 bunches B2 Continue scrubbing

Outlook Tuesday: 10:30 high pile-up for 8 hours (max.); 2-3 hours in stable beams Then Luminosity production till Friday morning Friday (24 hours) preparations for ion run (proton pilot beams) Luminosity production till Sunday evening (End of proton physics 2011) Sunday 18:00 start of MD block