BAE SYSTEMS Electronics & Integrated Solutions (E&IS) Operating Group

Slides:



Advertisements
Similar presentations
StEPS at EIAWhere We Are Now Paula Weir and Sue Harris Energy Information Administration, U.S. Department of Energy ICES3 Topic Contributed Session: Generalized.
Advertisements

Building a Vocational Community Online Lorraine Lavery
Test Automation Success: Choosing the Right People & Process
Re-Engineering One Step at a Time. 2 Some Ideas Rapid Inventory Development Pilot - Status Task Force of Stakeholders Review of Reporting Codes Collaborative.
COSYSMO 2.0 Workshop Summary (held Monday, March 17 th 2008) USC CSSE Annual Research Review March 18, 2008 Jared Fortune.
March 2002 COSYSMO: COnstructive SYStems Engineering Cost MOdel Ricardo Valerdi USC Annual Research Review March 11, 2002.
©2006 BAE Systems. COSYSMO Application At BAE Systems Gan Wang COSYSMO Workshop 23 rd International Forum on COCOMO and Systems/Software Cost Modeling.
University of Southern California Center for Systems and Software Engineering USC CSSE Research Overview Barry Boehm Sue Koolmanojwong Jo Ann Lane Nupul.
Some Experience With COSYSMOR At Lockheed Martin
Affiliate Feedback and Discussion 1. Future Research: COSYSMO Updated data collection effort Quantifying the effect of schedule Harmonizing across software.
1 Implementing the New Business Architecture University of California, San Diego January 18, 2006.
Natural Language Query Interface Mostafa Karkache & Bryce Wenninger.
©2006 BAE Systems. A Proposed Systems Engineering Productivity Measure Gan Wang and John Deal 24 th International Forum on COCOMO and Systems/Software.
SE 555 Software Requirements & Specification Requirements Validation.
1 Discussion on Reuse Framework Jared Fortune, USC Ricardo Valerdi, MIT COSYSMO COCOMO Forum 2008 Los Angeles, CA.
Costar & SystemStar Estimation Tools Dan Ligett Softstar Systems (603)
1 COSYSMO 2.0: A Cost Model and Framework for Systems Engineering Reuse Jared Fortune University of Southern California Ricardo Valerdi Massachusetts Institute.
©2006 BAE Systems. Practical Implementation of COSYSMO Reuse Extension Gan Wang, Aaron Ankrum, Cort Millar, Alex Shernoff, Ricardo Valerdi.
Telecom Expense Management Reporting Scottish Telecom’s Forum.
First, a little background…  The FIT Program is the lead agency for early intervention services under the Individuals with Disabilities Education Act.
(1) Project LEAP: A “Personal Information Environment” for Software Engineers Philip Johnson Cam Moore Collaborative Software Development Laboratory University.
Using SysML to Estimate SoS Engineering and Development Effort Jo Ann Lane Tim Bohn COCOMO.
Self-evaluation of project concepts for application in Horizon 2020
Managing Credit as a Team for Your Cooperative Harvest Land Co-op October 18,
Teradyne, Inc. Case Study – Assessing and Managing Risk in the Global Marketplace May 2, 2006 Brian Amero Corporate Trade Compliance Manager.
The future of software testing. The future of Software Testing The test practitioner’s perspective Future from the test organization perspective Innovation.
Test Organization and Management
© Copyright 2003, 2004 DESK Consulting, LLC Innovation as a Wicked Problem Barriers, Lessons, Examples David S. Clarke.
WELCOME.
Lessons Learned from Empirical IESE Dieter Rombach ISERN WS 2005 Noosa Heads, 14 November 2005.
9/17/2002 COSYSMO Usage Experience Panel: What is Happening at Lockheed Martin Garry Roedler, Lockheed Martin Engineering Process Improvement Center
Using the Right Method to Collect Information IW233 Amanda Murphy.
1 Accessibility: An Industry Case Study Jennifer Burrowes Kate Walser American Management Systems, Inc.
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
Customer Success Story State of Michigan : MAGI Case Study Beth Long, CGI Don Kosy, Oracle Consulting.
Multiplication Facts X 3 = 2. 8 x 4 = 3. 7 x 2 =
Adopting the Practice of Enterprise Analysis in a Mid-Sized Company Mary Burns Furr Adaptis, Inc Seattle, Washington USA.
ESTIMATING MULTIPLYING Chapter 1 Lesson 1. 1: ESTIMATION Ask: What am I being asked in this problem? 1.Look at the largest number. Estimate it to the.
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
Overview Presentation Mary Lynn Realff Co-PI and Project Director NSF Site Visit June 8, 2004 GT NSF ADVANCE – taking an integrated approach to institutional.
Open Solutions for a Changing World™ Copyright 2005, Data Access Worldwide June 6-9, 2005 Key Biscayne, Florida Extending Existing Applications to the.
Estimation Questions How do you estimate? What are you going to estimate? Where do you start?
© Prentice Hall, © Prentice Hall, ObjectivesObjectives 1.A complete definition of a plan 2.Insights regarding various dimensions.
Applied Analytics in Business Plans Lessons learnt during the SRC15 business planning process Robert Murray – Scottish Water Analytics Team Leader – 27th.
We are Mondelez the world’s leading maker of Chocolate, Biscuits, Candy and Gum with billion-dollar brands like Cadbury, Milka, Prince and Oreo and we.
Eli Lilly and Company: Responding to Global Health Needs While Strengthening Compliance with SAP® Process Control Company ​Eli Lilly and Company Headquarters.
The Systems Engineering Context
Introduction to Computers
Srikanth Srigiri Magdelene Sona Amarnath Suggu
DACS–USC CSSE Data Repository Joint Venture Announcement
COCOMO II Security Extension Workshop Report
Best Practices: AP Automation for GP Dan Thomson
Systems of Systems Challenges and Strategies
Work-force planning involves two major activities
Module 1: Introduction to Business Intelligence and Data Modeling
Authors/Collaborators
קורס פיננסי – מושגים פיננסיים / כלכליים
Melissa Gholson, Ed.D. June 28, 2017
MOPAN 3.0 Indicator Framework
Service Development at Aalto University Key Enabler for Aalto's Academic Mission Mari Svahn.
Authors/Collaborators
Working Group Meeting Report
POWER CHALLENGES Several Ways To Solve 7 CHALLENGES.
Principles of Management Learning Session # 19 Dr. A. Rashid Kausar.
Question 5.
Public Involvement Involvement Public – who?
Objectives Improve the in-store shopping experience
UNECE Work Session on Statistical Data Editing, Paris, 2014
Driving Successful Projects
SELF-ASSESSMENT.
Presentation transcript:

BAE SYSTEMS Electronics & Integrated Solutions (E&IS) Operating Group BAE Systems, Inc. Headquartered in Rockville, Md. Three operating groups $10 billion annual sales 45,000 employees Electronics & Integrated Solutions (E&IS) Operating Group 19,000 employees; 7,000 engineers; more than 50 sites in the US, the UK, and Israel

Piloting COSYSMO At BAE SYSTEMS Involvement since early development Working groups, Delphi Contributed 10 data points Piloting COSYSMO within E&IS as part of common systems engineering estimation process development Cross-check and Independent Cost Evaluation Cross-LoB bids Potential OG standard SE estimating method and tool Developed Systems Engineering Estimation Workbook, using SystemStar front-ended with a data collection instrument One process, one model, multiple calibrations Collected close to 50 data points from all LoBs across US and UK Continuing data collection effort Piloting Workbook across the US and the UK sites Collaborated with BAE Insyte, UK Pilots and data collection

Lessons and Challenges Divergence in data Different products, different sites, different processes, different legacies Lack of common way of defining work – WBS Your SE is not my SE Your life cycle is not my life cycle “System of interest” is not a common unit of measure; nor is “nominal requirement” English is an ambiguous language I am building an LRU (a.k.a. box). How many scenarios do I have? Answer: 7500!!! “If you are wrong all the time, you are not wrong.” – Dan Ligett Prepare to set a policy Count in the way you intend to bid it Clear and present challenges Counting rules & classification guidelines Reuse Requirement change Common vs. customer WBS Need a Management Champion We just got started…