Particle Measurement Programme (PMP) Progress update
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
Repeatability and Reproducibility Analysis of the Round Robin Results.
PMP Progress Report Activities since GRPE 58 Heavy Duty Validation testing Exercise completed in October Draft report and draft proposal to insert PN measurement.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
RDE Working group Brussels, September 2015 Collection of NO x emissions data - First preliminary results RDE working group 14 September 2015 European Commission.
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Non- exhaust particle.
25 January 2016 European Commission - Joint Research Centre (JRC)
Evaluation of candidate procedures - Status & Reporting - RDE-LDV working group 28 June 2012, Brussels, EU Martin Weiss Pierre Bonnel DG - Joint Research.
DG ENTR, 08 September 2011, Brussels, EC Pierre Bonnel Alessandro Marotta Martin Weiss Joint Research Centre (JRC) IES - Institute for Energy and Transport.
RDE PN-PEMS programme Progress Update F. Riccobono, B. Giechaskiel, P. Bonnel STU, IET, JRC, European Commission.
Joint Research Centre the European Commission's in-house science service NON-EXHAUST PARTICLE EMISSIONS.
PN-Calibration Issues
PMP IWG Progress Report
PMP IWG Progress Report
43rd PMP-Meeting Rosa Delgado IDIADA 15/03/ /03/2017 TITLE
PMP IWG Progress Report
PMP IWG Progress Report
Institute for Energy and Transport B. Giechaskiel, G. Martini
Preliminary results of the OEMs HDV PN-PEMS validation study
Mobile Air-conditioning (MAC):
76th UNECE GRPE session PMP IWG Progress Report
76th UNECE GRPE session PMP IWG Progress Report
BRAKE PARTICLE EMISSIONS
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
Fuel consumption measurement in LDVs WLTP 2nd act Working Group
RDE Regulation Commission Meeting
PMP IWG Progress Report
RDE Task Force Meeting, 7th January 2014
Development of the Japan’s RDE (Real Driving Emission) procedure
HD ENGINE RAW PN MEASUREMENT
RDE-LDV working group Vehicle test plan 2013
RDE Task Force Meeting, 28th November 2013, Brussels
28th of November 2013, Brussels
DTP 7th meeting – Bern September 2011
Validation of the PEMS System on the Chassis Dyno, Why?
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
LDV Real Driving Emissions: - Drafting of physical PEMS protocol –
Analysis of the WLTP EU in-use database with respect to RDE-like trips, update of the presentation from by H. Steven , modified
WLTP-DTP-LabProcICE-229
Input ACEA Boundary Conditions.
LDV Real Driving Emissions: - Released datasets -
Additional RDE trip indicator(s)
Analysis of the WLTP EU in-use database with respect to RDE-like trips, update of the presentation from by H. Steven
Inter-Laboratory Comparison Exercise CPC CALIBRATION
Emissions testing in the laboratory and on the road: Preliminary results for one Euro 6 diesel vehicle Pierre Bonnel Martin Weiss Joint Research Centre.
Analysis of the WLTP EU in-use database with respect to RDE-like trips, update of the presentation from by H. Steven , modified
Revision of the Work Plan
Francesco Riccobono, Barouch Giechaskiel, Pierre Bonnel
LDV Real Driving Emissions: - Released datasets -
RDE testing of hybrid vehicles Contribution to the RDE working group
16th of November 2013, Brussels
Real Driving Emissions IWG Recommendations for Data Collection & EU Dataset
Work plan and next steps – RDE-LDV working group
RDE – Assessment of positive elevation gain
LDV Real Driving Emissions: - Assessment criteria and work plan -
Emissions testing with PEMS versus random laboratory driving cycles
Comparing EMROAD and the ACEA RDE Evaluation Tool
PN Counting from Raw Exhaust via Fixed Dilution and PMP Round Robin Project JRC and ACEA.
RDE-LDV working group 13 April 2012 Pierre Bonnel Martin Weiss
Current status All European laboratories (except 3rd JRC measurement) have conducted their measurements Equipment finally returned to JRC US, Japanese.
LDV Real Driving Emissions: - Assessment of RDE data evaluation methods: Set-up of "reference database“ - 16th of September 2013, Brussels Pierre Bonnel.
Informal document GRPE-77-30
RDE-LDV working group 20 November 2012, Brussels, EU Pierre Bonnel
PMP INFORMAL GROUP Exhaust particle emissions – progress report
RDE Task Force Meeting, 16th December 2013, Brussels
Working Group “Real-Driving Emissions of Light-Duty Vehicles” Work Progress – December
Informal document GRPE Rev.1
Presentation transcript:

PN-PEMS Progress update RDE LDV meeting 8th September 2014 Brussels Francesco Riccobono, Barouch Giechaskiel, Martin Weiss, Pierre Bonnel European Commission – Joint Research Centre Institute for Energy and Transport

Phase I - feasibility study Aim Assess and validate the application and performance of portable PN instrumentation relative to each other and to a reference. Evaluation criteria - Linearity of the portable PN system with the reference system under controlled laboratory conditions (chassis dyno tests) - Performance of long sampling on-board

PN-PEMS vs PMP Current best case: PN-PEMS vs PMP @ CVS 95% data points PN-PEMS-#1 (km-1) PN-PEMS-#2 (km-1) PN-PEMS-#3 (km-1) Current best case: PN-PEMS vs PMP @ CVS 95% data points fall within +100% -50% PN-PEMS-#4 (km-1) PN-PEMS-#5 (km-1)

Conclusions of Phase I Diffusion charging resulted in a promising alternative to CPCs for PEMS measurements The estimated measurement variability is 2, due to different measurement principle and different sampling points Draft of the technical specifications for PN-PEMS - thermal treatment based on PMP - efficiency requirements still allow CPCs

Phase II Distributed documents: Comments expected by 15th September. Experimental plan for Phase II of the PN-PEMS project. The technical specification for the PN-PEMS. JRC Laboratory PN-PEMS Calibration Report: describing the calibrations of the prototypes PN-PEMS, the suggested calibration procedures and some results with the next generation PN-PEMS. Comments expected by 15th September.

Phase II Stage 1: Calibration of the instruments in laboratory (CW 41-44). Instrument manufacturer’s calibration will be checked at JRC applying the calibration procedure as defined in the laboratory calibration report Stage 2: Validation of calibration on chassis dyno (CW 45-46). Proposal: comparison of PN-PEMS and PMP particle counter distance specific emission rate at CVS over a hot WLTC. Maximum allowed deviation to be defined. Maximum adjustment of instrument’s manufacturer calibration is under discussion.

Phase II Stage 3: Inter-laboratory comparison exercise (starting CW 47). Installation of at least one golden PN-PEMS on one golden vehicle. Al least the following tests will be performed at JRC and at the OEMs or technical services that want to participate to the exercise 1 x NEDC cold 1 x NEDC hot 2 x WLTC hot 2 x on-road tests following the general RDE test procedure: minimum 90 min, distance divide as 1/3 urban (<60 km/h), 1/3 rural (60-90 km/h), 1/3 motorway (>90 km/h). The objective is to allow the OEMs to get familiar with the PN-EPMS instruments and with the installation/measurement procedure. If enough laboratories participate and data are collected consistently, repeatability, reproducibility and long term stability of PN-PEMS will be assessed