PPDU Recovery Procedure

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0507r0 Submission Synch Frame Follow Up Date: Authors: May 2013 NameAffiliationsAddressPhone Young Hoon KwonHuawei.
Advertisements

Doc.: IEEE /0612r0 Submission Serivice Type Indication in Association Date: xx Authors: May 2012 Wu Tianyu, HuaweiSlide 1 NameAffiliationsAddressPhone .
Restricted Access Window Signaling for Uplink Channel Access
Doc.: IEEE /0816r0 Submission July 2012 Channel Selection for ah Date: Slide 1 Name AffiliationsAddressPhone Huai-Rong Shao.
TGah Submission Doc: ah July, 2012 Sectorization for hidden node mitigation NameAffiliationsAddressPhone George Calcev Huawei3601 Algonquin.
Submission doc.: IEEE /0834r0 Speed Frame Exchange Date: Slide 1 Authors: July 2012 Eric Wong, Broadcom NameAffiliationsAddressPhone .
Doc.: IEEE /1302r0 Submission November 2012 Yongho Seok, LG ElectronicsSlide 1 TXOP Truncation Date: Authors: NameAffiliationsAddressPhone .
TGah Submission Doc: ah May, 2012 Non-TIM Stations in 11ah NameAffiliationsAddressPhone George Calcev Huawei3601 Algonquin Road, Rolling.
Doc.:IEEE /01122r0 September 2012 Simone Merlin Short MAC Header Signaling Slide 1 Authors:
Doc.: IEEE /0831r0 Submission July 2012 Yongho Seok, LG ElectronicsSlide 1 Uplink Channel Access General Procedure Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /1093r0 Submission September 2012 Jeongki Kim, LG ElectronicsSlide 1 System information update procedure for 11 ah Date:
Doc.: IEEE /1115r09 Submission September 2012 David Halasz, Motorola MobilitySlide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for.
Doc.: IEEE /1089r0September 2012 Submission Qi Wang, BroadcomSlide 1 Frame Classification Based on MAC Header Content Date: Authors:
Submission doc.: IEEE /0656r1 Slide 1Panasonic September 2012 Extended Sleep mode for battery powered STAs Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0830r0 Submission July 2012 Yongho Seok, LG ElectronicsSlide 1 NDP Probing Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0869r0 SubmissionJae Seung Lee, ETRISlide 1 Active Scanning for 11ah Date: July 2012 Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0306r0 Submission Sector Discovery for 11ah Date: Authors: March 2013 NameAffiliationsAddressPhone Minho CheongETRI.
Doc.: IEEE /0026r0 Submission January 2013 Yongho Seok, LG ElectronicsSlide 1 Security Procedure for Long Sleeper Date: Authors: NameAffiliationsAddressPhone .
Doc: ah - Sensor Only BSS September 2012 Submission Sensor Only BSS Date: Huawei Technologies Inc. Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0519r0 SubmissionSlide 1 Speed Frame Exchange Using NDP Frames Date: Authors: Shoukang Zheng, I2R May 2013 NameAffiliationsAddressPhone .
Doc.: IEEE /1333r0 Submission November 2012 Sameer Vermani, Qualcomm Mandatory Optional PHY Features for 11ah Date: Authors: Name AffiliationsAddressPhone .
Doc.: IEEE /1304r0 Submission November 2012 Yongho Seok, LG ElectronicsSlide 1 AID Assignment Protocol Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /891r0 Submission July 2012 AID reassignment for TIM and non-TIM modes switching Date: Slide 1 Authors: Betty Zhao, et.
Doc.: IEEE /0617r0 Submission NDP sounding May 2012 Yongho Seok (LG Electronics), Hongyuan Zhang (Marvell)Slide 1 Date: Authors:
Submission doc.: IEEE /0867r0 July 2012 Slide 1 Date: Authors: Non-TIM Allocation Hyoungjin Kwon, ETRI NameAffiliationsAddressPhone .
Doc.: IEEE /0525r1 SubmissionSlide 1 OBSS Mitigation Date: Authors: Chao-Chun Wang, MediaTek May 2013 NameAffiliationsAddressPhone .
Doc.: IEEE /0290r0 SubmissionSlide 1 RAW Operation Improvement Date: Authors: NameAffiliationAddressPhone Yuan ZhouI2R1 Fusionopolis.
Doc.: IEEE /0080r0 Submission January 2013 Yongho Seok, LG ElectronicsSlide 1 Backoff Procedure in RAW Date: Authors: NameAffiliationsAddressPhone .
RAW Assignment follow up
SIG Fields Design of Long Preamble
Uplink Data Delivery Date: Authors: Month Year
Duplicate Bandwidth and Operation
OBSS Mitigation Date: Authors: May 2013 Month Year
Periodic Channel Access
ACK Protection Schemes for the IEEE ac MU-MIMO Downlink
Active Scanning for 11ah Follow Up 2
Active Scanning for 11ah Follow Up
Comments on Relay Date: Authors: Month Year
Page Scheduling Date: Authors: May 2013 Name Affiliation
ACK operation in TDD SP Date: Authors: MAY 2018 Name
SIG Field of NDP Probe Request
CCA Threshold Levels Date: Authors: January 2011 Month Year
Duplicate Detection of Short MAC Frame
Consideration on multi-AP coordination for EHT
Reducing the Probe Response transmission
Spectral Mask and Flatness
Consideration on multi-AP coordination for EHT
WUR MAC and Wakeup Frame
Usage of Doppler Bit in 11ax
Sensor Only BSS Date: Authors: Name Affiliations Address
Spectral Mask and Flatness
Multi-AP Transmission Procedure
TIM and Page Segmentation
AID update procedure for TDLS peer STA
LG R&D Complex Anyang-Shi, Kyungki- Do, Korea
Multi-AP Transmission Procedure
ACK Protection Schemes for the IEEE ac MU-MIMO Downlink
PAPR Reduction for MCS0 Rep 2
FDMA Channel signaling
TGah Awards Date: Authors: July 2017
Channel Access for WUR FDMA
Channelization Selection for ah
FDMA Channel signaling
IEEE ah Sub 1 GHz license-exempt operation Agenda for March 2012
Month Year doc.: IEEE /0xxxr0 September 2012
SIG Fields Design of Long Preamble
Multi-AP Transmission Procedure
Month Year doc.: IEEE yy/xxxxr0 May 2012
Control Response PPDU Format
Consideration on HARQ feedback
Presentation transcript:

PPDU Recovery Procedure Month Year doc.: IEEE 802.11-yy/xxxxr0 May 2013 PPDU Recovery Procedure Date: 2013-05-14 Authors: Name Affiliations Address Phone Email Yongho Seok LG Electronics LG R&D Complex Anyang-Shi, Kyungki- Do, Korea +82-31-450-1947 yongho.seok@lge.com Matthew Fischer Broadcom mfischer@broadcom.com Minyoung Park Intel Hillsboro, OR +1 503 712 4705 minyoung.park@intel.com Young Hoon Kwon Huawei Jinsoo Choi Jeongki Kim Hangyu Cho Eric Wong Sunnyvale, CA +1 408 922 6672 ewong@broadcom.com Tom Tetzlaff Emily Qi Simone Merlin Qualcomm San Diego, CA +1 858 845 1243 smerlin@qualcomm.com Amin Jafarian Bin Tian Santosh Abraham Menzo Wentink Hemanth Sampath VK jones Yongho Seok, LG Electronics John Doe, Some Company

Authors: May 2013 Month Year doc.: IEEE 802.11-yy/xxxxr0 Name Affiliations Address Phone Email Hongyuan Zhang Marvell Sudhir Srinivasa George Calcev Huawei Rolling Meadows, IL, USA George.Calcev@huawei.com Osama Aboul Magd Betty Zhao David Yangxun Bin Zhen ChaoChun Wang MediaTek James Wang Jianhan Liu Vish Ponnampalam James Yee Huai-Rong Shao   Samsung Electronics Chiu Ngo Minho Cheong ETRI Jae Seung Lee Hyoungjin Kwon Jaewoo Park Sok-kyu Lee Sun, Bo         ZTE Lv, Kaiying         Yongho Seok, LG Electronics John Doe, Some Company

Authors: May 2013 Name Affiliations Address Phone Email Sayantan Choudhury Nokia Klaus Doppler Chittabrata Ghosh Esa Tuomaala Ken Mori Panasonic Rojan Chitrakar Haiguang Wang I2R Shoukang Zheng Yeow Wai Leong Zander Lei Jaya Shankar Anh Tuan Hoang Joseph Teo Chee Ming Anna Pantelidou Renesas Mobile Juho Pirskanen Timo Koskela Liwen Chu STMicroelectronics George Vlantis Yongho Seok, LG Electronics

May 2013 Introduction After transmitting an MPDU that requires an immediate frame as a response, the STA shall wait for a timeout interval of duration of aSIFSTime + aSlotTime + aPHY-RX-START-Delay, starting at the PHY-TXEND.confirm primitive. If a PHYRXSTART.indication primitive does not occur during the timeout interval, the STA concludes that the transmission of the MPDU has failed. (IEEE 802.11-2012) aPHY-RX-START-Delay : The delay from the start of the preamble to the issuance of the RXSTART.indication primitive by the PHY. Yongho Seok, LG Electronics

Proposal on aPHY-RXSTART-Delay May 2013 Proposal on aPHY-RXSTART-Delay 1MHz preamble aPHY-RX-START-Delay of 1MHz PPDU is set to 600us. (=40usX14+40us) >= 2MHz short/long preamble aPHY-RX-START-Delay of >=2MHz PPDU is set to 280us. (=40usX6+40us) STF LTF1 SIG LTF2 … LTF_NLTF DATA (2 symbols) (2 symbols ) (2 symbols) (1 symbol each) STF LTF1 SIGA D-STF D-LTF1 … D-LTF_NLTF SIGB DATA Field (2 symbols) (2 symbols) (2 symbols) (1 symbol) (1 symbol each) Yongho Seok, LG Electronics

Proposed PPDU Recovery Procedure May 2013 Proposed PPDU Recovery Procedure After transmitting an MPDU that requires an immediate frame as a response, the STA shall wait for a timeout interval of duration of aSIFSTime + aSlotTime + aPHY-RX-START-Delay, starting at the PHY-TXEND.confirm primitive The value for aPHY-RX-START-Delay is dependent on the PHY type, and each such value can be found within the PHY-Characteristics table for each individual PHY within its own clause. In S1G PHY, the aPHY-RX-START-Delay is determined by the preamble _type parameter of TXVECTOR. When the TXVECTOR FORMAT is equal to 1MHz preamble, aPHY-RX-START-Delay is set to 600us. When the TXVECTOR FORMAT is equal to >= 2MHz short/long preamble, aPHY-RX-START-Delay is set to 280us. Yongho Seok, LG Electronics

Proposed PPDU Recovery Procedure May 2013 Proposed PPDU Recovery Procedure When a capability element of STA indicates that 1MHz control response will be used, an 1MHz preamble transmission as the response of >= 2MHz short/long preamble is allowed. A S1G STA that sends a control frame in response to a frame carried in an S1G PPDU shall set the TXVECTOR parameter CH_BANDWIDTH to indicate a channel width that is the same or lower as the channel width indicated by the RXVECTOR parameter CH_BANDWIDTH of the frame eliciting the response. Channel Bandwidth of PPDU during the multiple frame exchange sequences in a TXOP shall be the same or narrower than the Channel Bandwidth of the preceding PPDU. Otherwise, an 1MHz preamble transmission as the response of >= 2MHz short/long preamble is not allowed. AP chooses the ACK timeout depending on the preamble type of the frame eliciting the control response. A S1G STA that sends a control frame in response to a frame carried in an S1G PPDU shall set the TXVECTOR parameter CH_BANDWIDTH to indicate a channel width that is the same as the channel width indicated by the RXVECTOR parameter CH_BANDWIDTH of the frame eliciting the response. Yongho Seok, LG Electronics

Proposed PPDU Recovery Procedure May 2013 Proposed PPDU Recovery Procedure ACK (1MHz PPDU) ACK (2MHz PPDU) ACK (1MHz PPDU) DATA (4MHz PPDU) DATA (4MHz PPDU) ACK (1MHz PPDU) ACK (2MHz PPDU) ACK (1MHz PPDU) <Allowed> <Not Allowed> ACK (1MHz PPDU) DATA (2MHz PPDU) DATA (2MHz PPDU) ACK (2MHz PPDU) ACK (1MHz PPDU) <Allowed> <Not allowed> DATA (1MHz PPDU) ACK (1MHz PPDU) <Allowed> Note) frame exchange sequence examples when an 1MHz preamble transmission as the response of >= 2MHz short/long preamble is not allowed. Yongho Seok, LG Electronics

May 2013 Conclusion 11ah MAC protocol overhead should be reduced because the bandwidth of 11ah PHY is quite narrow. If a STA is allowed an 1MHz preamble transmission as the response of >= 2MH preamble, the timeout value for the PPDU recovery is significantly increased from 492us to 812us . Yongho Seok, LG Electronics

May 2013 Straw Poll 1 Do you support to define aPHY-RX-START-Delay as the following? 1MHz preamble: 600us 2MHz/4MHz/8MHz/16MHz: 280us Yongho Seok, LG Electronics

May 2013 Straw Poll 2 Do you support a PPDU recovery procedures defined in slide 6 and 7? Yongho Seok, LG Electronics