UMD 2 Decommissioning Status

Slides:



Advertisements
Similar presentations
UK NGI Operations John Gordon 10 th January 2012.
Advertisements

EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Unified Middleware Distribution (UMD): SW provisioning to EGI Mario David.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EG recent developments T. Ferrari/EGI.eu ADC Weekly Meeting 15/05/
SEE-GRID-SCI SEE-GRID-SCI Operations Procedures and Tools Antun Balaz Institute of Physics Belgrade, Serbia The SEE-GRID-SCI.
UK middleware deployment GridPP27 - CERN 15 th September 2011 GridPP27 - CERN 15 th September 2011 Status & plans Jeremy Coles.
MW Readiness Verification Status Andrea Manzi IT/SDC 21/01/ /01/15 2.
Your university or experiment logo here The European Landscape John Gordon GridPP24 RHUL 15 th April 2010.
Information System Status and Evolution Maria Alandes Pradillo, CERN CERN IT Department, Grid Technology Group GDB 13 th June 2012.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Ops Portal New Requirements.
RI EGI-InSPIRE RI UMD 2 Decommissioning Status Cristina Aiftimiei EGI.eu.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Accounting Requirements Stuart Pullinger STFC 09/04/2013 EGI CF – Accounting.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Security Monitoring Daniel Kouřil EGI-TF 2011.
Setting up NGI operations Ron Trompert EGI-InSPIRE – ROD teams workshop1.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Accounting Requirements Stuart Pullinger STFC 09/04/2013 EGI CF – Accounting.
John Gordon EMI TF and EGI CF March 2012 Accounting Workshop.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Regional tools use cases overview Peter Solagna – EGI.eu On behalf of the.
Accounting Update John Gordon. Outline Multicore CPU Accounting Developments Cloud Accounting Storage Accounting Miscellaneous.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Usage and future support for the deployed software Survey results TCB April.
Implementation of GLUE 2.0 support in the EMI Data Area Elisabetta Ronchieri on behalf of JRA1’s GLUE 2.0 Working Group INFN-CNAF 13 April 2011, EGI User.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI IPv6 Report for HEPiX CERN October 5, 2012 CERN 1
EMI INFSO-RI EMI 1 (Kebnekaise) Updates C. Aiftimiei (INFN) EMI Release Manager.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI MPI VT report OMB Meeting 28 th February 2012.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Information system workshop Stephen Burke egi.eu EGI TF Madrid September.
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT Middleware Update GDB, 9 th February 2011 Slides by Maria Alandes.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Middleware updates Peter Solagna – EGI.eu OMB – 16/07/ /3/
SA2.6 Task: EMI Testbeds Danilo Dongiovanni INFN-CNAF.
WLCG IPv6 deployment strategy
OpenSSL and Java 7 vs. 512-bit proxy keys
EGI Operations Management Board
NGI and Site Nagios Monitoring
LCG Service Challenge: Planning and Milestones
The New APEL Client Will Rogers, STFC.
Andreas Unterkircher CERN Grid Deployment
gLite->EMI2/UMD2 transition
Andrea Manzi, Oliver Keeble
CREAM Status and Plans Massimo Sgaravatto – INFN Padova
Grid Operations Procedures
Patricia Méndez Lorenzo ALICE Offline Week CERN, 13th July 2007
Update on Plan for KISTI-GSDC
JRA1.4 - Account for different resource types
Accounting Requirements
Update on SHA-2 and RFC proxy support
March Availability Report for EGEE Sites based on Nagios
EGI UMD Storage Software Repository (Mostly former EMI Software)
TCG Discussion on CE Strategy & SL4 Move
EMI: dal Produttore al Consumatore
SAM Alarm Triggering and Masking
Monitoring of cloud services
IPv6 transition Vincenzo Spinoso EGI Operations.
Operations Management Board December 18
Introduction OMB, T. Ferrari/EGI.eu 12/4/2018
Unsupported middleware migration update
Software Vulnerability Group Status update
Operations Officer, EGI
Operational Tools & Middleware Versions Monitoring
New Types of Accounting Beyond CPU
UMD and Operations Vincenzo Spinoso EGI Operations.
UMD 2 / EMI 2 Decommissioning Status
Operations Management Board January 29
UMD 2 Decommissioning Status
Introduction slides Peter Solagna – EGI.eu
ARGO Central Monitoring
Peter Solagna – EGI.eu OMB– 18/12/12
EGEE Operation Tools and Procedures
Andrea Manzi, Oliver Keeble
Installation/Configuration
UMD Updates Vincenzo Spinoso.
Retirement calendar of gLite 3.2 and EMI 1 middleware
Presentation transcript:

UMD 2 Decommissioning Status Cristina Aiftimiei EGI.eu

Overview UMD 2: Decommissioning Calendar Status Update

Decommissioning Calendar UMD 2 EOL– April 2014 Since Nov. 2013 – raise the awareness of the approaching End of Security Support of UMD(EMI) 2 services and the need to plan a massive decommissioning/migration process: Official Calendar https://wiki.egi.eu/wiki/Software_Retirement_Calendar%23EMI_2 end of Jan 2014 05/02/2014 - broadcast was sentto sites https://operations-portal.egi.eu/broadcast/archive/id/1080 ROD alarm template was provided: https://wiki.egi.eu/wiki/ROD_MW_alarm_template%23EMI_2_retirement_campaign And the list of affected middleware versions end of Feb. 2014 12/03/2014 – started to raise alarms for UMD 2 services https://ggus.eu/?mode=ticket_info&ticket_id=101888 description of SAM probes was provided https://wiki.egi.eu/wiki/MW_Nagios_tests%23EMI-2_tests end of May 2014 Sites must open a downtime for the UMD-2 services (excluding dCache) still deployed. Sites who fail to do so are eligible for suspension All sites should have reported upgrade or decommission plans for UMD-2 services in their tickets,

UMD2 Relevant Services Relevant services: Exception: using specific SAM probes ARC, DPM, STORM, WN using generic SAM probe (MiddlewareVersion=2.*) APEL, ARGUS, BDII(site, top), CREAM, LB, LFC(local,central), MyProxy, VOMS, WMS Exception: dCache 2.2.x supported until July 2014

APEL migration Critical step for the migration of CEs is the update of the APEL clients The same site *cannot* have APEL clients from UMD-3 and UMD-2 publishing in parallel accounting data Possible options: Upgrade every CE with the APEL clients together Upgrade APEL first, EMI2 CREAM has been successfully tested with EMI3 APEL clients Deploy EMI3 CREAM with EMI2 APEL Theoretically it works, it has been tested by SA2 and the results are available in a wiki page We don’t really recommend it, AND APEL EMI 2 IS NO MORE SUPPORTED Tutorial on APEL migration at EGI CF 2014: Migrating from the EMI2 to EMI3 APEL Client PROBLEM: We still have ~49 sites publishing accounting data using APEL 2 clients See http://goc-accounting.grid-support.ac.uk/consumer/

Status Update Number of instances to be decommissioned: Reference: Service Type As of March 7th As of April 23th As of May 14th As of May 27th As of June 2nd ARC-CE 11* BDII_site 159 41 29 16 11 CREAM 220 55 45 32 14 DPM 127 38 22 8 StoRM 4 2 VOMS 9 3 WMS 7 5 Sites with WNs 130 52 35 24 Reference: http://bit.ly/UMD2_nodes Other numbers: ARGUS – 3 APEL - 18 BDII top – 1 LFC – 1 (local)

Statistics per NGI

Conclusions Reports received: Waiting for other reports NGI_AEGIS all sites upgraded Due to a special setup - 1 central APEL instance publishing accounting for all sites – the migration to EMI 3 was followed with APEL team NGI_UK site is finishing with the last EMI 2 service (APEL) Following up through GGUS – RHUL, Manchester, UCL – EMI 2 APEL clients update NGI_NL (BEgrid-ULB-VUB) update this week – CE, APEL client, WNs Update next week – ARGUS, BDII-site, SE Will put site in downtime Waiting for other reports ALL UMD 2/EMI 2 sites should be in DOWNTIME