Mario Bätz CERN ST-MO-TC ENGINEERING PROCESS MONITORING FOR CONTROL ROOM OPERATION GTPM Gestion Technique dune Panne Majeure.

Slides:



Advertisements
Similar presentations
Log System Spec 1 Logical Systems Specification Module Two stages in the module – Stage 4 - Technical Systems Options – Stage 5 - Logical Design Performed.
Advertisements

ALICE DCS Workshop Day 10th September The Cooling and Ventilation Control System D. Blanc, Process Control Team and Project Leader CERN ST/CV-Design.
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
Operation TCR 2 nd of July to 10 th of September 2001 More than 20 major events Events grouped by equipment group and zone affected.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
ST Technical Committee 15th October LHC Ventilation Control System migration D. Blanc ST-CV.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design.
Technology Integration Planning Guidelines for Development A Visual Guide/ Couva West Secondary School.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
C11- Managing Knowledge.
Copyright 2002 Prentice-Hall, Inc. 1.1 Modern Systems Analysis and Design Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 1 The Systems Development.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Training in Vacuum Technology for JUAS 2013 Students
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
ST Workshop 1 April 2003P. Vojtyla - TIS/IE1/10 Interaction of TIS and ST in Environmental Matters P. Vojtyla TIS – Integrated Safety and Environment.
AT/ECR CRYOGENICS Organisation, Procedures and Communication with TCR Presentation for TCR-ECR-ACR Meeting 2003 by K. Barth.
1LHC COOP, Uwe EPTING, CERN, ST/MO LHC - Technical Infrastructure Monitoring Uwe EPTING CERN, ST/MO.
BA6 Cooling Towers Test Day Process Control Functionality and Performance Tests TCR – PCR Monitoring.
Technology Department WP2 Progress Report Th. Otto
Isabelle Laugier, AT/VAC/ICM Section May 6 th 2008 LHC Vacuum Control system.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
AB/CO Infrastructure surveillance Alastair Bland, AB/CO 18 th May 2005 (thanks to Pierre Charrue for the original PowerPoint presentation in September.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
13th May 2004Uwe Epting - TS/CSE-CO1 TS-CSE Outline –TCR and TS-CSE-CO mandate –Applications –Console layout –Hardware and Operating System –Strategy –Conclusion.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
INSME – International Network for SMEs Tailored Services 1 st Meeting of the INSME Promoting Committee Milan, 7 th – 8 th July 2003.
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
Support for Technical Infrastructure operations P. Sollander, AB/OP/TI.
ERBIL PROJECT CONSULTING ENGINEERING CO. B.Sc. (Eng),ALTAN DIZDAR B.Sc. (Eng), ALTAN DIZDAR PROWAT LEONARDO DA VINCI EUROPEAN UNION PROJECT Water loss.
Human-mimetic approach to the integrated monitoring, management and optimization of a symbiotic cluster of smart production units Project Coordinator:
C. Mugnier, D. Lafarge, C. Perolini, R. Pilon, J. Ruiz-Cabezas
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
Update on the PSB Cooling and Ventilation Systems
Information Systems Development
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
FCT and CERN Portuguese Trainee Programme Report
Performance monitoring framework for the technical infrastructure
Configuration Management and Layout Database ELENA Project
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS activities during LS2 TE-EPC (Power Converter Group)
Bidder’s conference – 21st May 2013
Managing infrastructure faults to minimize accelerator down time
Insertable B Layer Cooling System
Chapter 1 The Systems Development Environment
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
ESS Main Control Room & ICS Infrastructure
Presentation transcript:

Mario Bätz CERN ST-MO-TC ENGINEERING PROCESS MONITORING FOR CONTROL ROOM OPERATION GTPM Gestion Technique dune Panne Majeure

GTPM - Objectives n Improvement of collaboration and understanding PCR-TCR (roles & resp.) n Reduction of the SPS restart time after major breakdown n Monitoring documents for the SPS restart (logic of SPS restart, process description, instructions etc.) n A structured method, which can be generalized to future projects

Gestion Technique dune Panne Majeure - GTPM n Control Room Representatives –PCR, TCR, MCR, (CRN) n Control specialists –ST/MO, SL/CO, SL/OP,... n Equipment specialists –ST/EL, ST/CV, LHC/VAC, …

Accelerator Oriented Monitoring: Systems, Interaction & Data Electricity HT, MT, BT, Water Pumping Stations, Raw, Prim, Chilled, Demi,... Thermal Air-conditioning, Ventilation Vacuum Pumps, Pressures Access Technical breakdowns Monitoring Hardware, Software, network... SL timing, power supplies, magnets,... CPS GTPM Major breakdown (alarms, logbooks,…) System identification System interdependency Restart objectives...

Example SPS Restart Diagram

Example TCR Restart Diagram

Monitoring System n Dynamic restart diagrams –UMMIs in PVSS –Drivers for various data sources < TDS, electricity, vacuum, access, transfer lines, timing, power converters,... n SAME tools in PCR,TCR, MCR,…

PVSS Implementation

Added Value n All control rooms work with the same information n Breakdown impact at one glance -> faster situation assessment n Optimised restart strategy (priorities, order) n Shorter restart time n Visual system documentation for training

Outlook / next steps… n Use paper tools in operation this year n Assess improvement n Finish PVSS implementation n Formalise and document the method n MCR asked for same project shutdown 2001/2002 and 2002/203 n Promote results and method for LHC operation