Target collaboratin Board Meeting

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
RF Cavity / Coupling Coil Module
ISIS Second Target Station
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Mitglied der Helmholtz-Gemeinschaft TIK 3.1 Moderator & Reflector System TAC Meeting 15. October 2015 | Yannick Beßler (FZJ), Daniel Lyngh (ESSS)
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
WP 12.3 Moderator & Reflector Systems D. Lyngh, M. Kickulies, J. Ringnér, J. Jurns, Y. Bessler (FZJ), M. Klaus (TUD), H. Quack (TUD) TAC12 Presenters:
Manufacturing contracts for RFQ
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
TIK 3.1 Moderator & Reflector System
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Mitglied der Helmholtz-Gemeinschaft ESS cold and thermal Moderators Moderator & Reflector System Project Introduction Meeting | Yannick Beßler,
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
WP 12.3 Moderator & Reflector Systems D. Lyngh, M. Kickulies, J. Ringnér, J. Jurns, M. Andersson, M. Pucilowski, T. Hedlund, A. Olsson TAC11 Lund, 1 st.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
The ESS Target Station F. Mezei ESS target division NPPatLPS, 2013.
Crab Cavity Technical Coordination meeting:
Teleconf ACS – FREIA 28th March 2017
Jim Fast Pacific Northwest National Laboratory
Detector building Notes of our discussion
Cryomodule test stand at ESS site
He Plant, LN2 Systems and Commissioing
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Making Difficult Decisions in a Transparent Way –
Software Configuration Management (SCM)
CSP 25th November 2010 Technical agreement number 3: overview
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
F.E.T.S. Mechanical Engineering Update
The report on the IBR-2 modernization
on behalf of the RF group
(Procurement, testing of magnets)
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Target and Horn status report
Far Detector Activities Late 2017 – Early 2018
ESS Target Cryogenic System European Cryogenic Days CERN
Status of the PANDA Solenoid Magnet Production in BINP
Guidance notes for Project Manager
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Planning Quality control - Manufacturing logbook Photos Conclusions
Teleconference ACS – FREIA 20th February 2018
MERIT pre-installation review: Preliminary conclusions
A2 Coursework - Making EdExcel.
First Article Inspection
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
Cryomodule Assembly Plan
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Target Helium Cooling System Design Code 10th Target Technical Board Meeting Ulf Odén WP2 Manager 19 April, 2019.
EUROPEAN SPALLATION SOURCE ESS Scandinavia- CZ - OP
General Assembly Meeting
Evaluating and Improving a Manufacturing System Mock Preparation
Teleconference ACS – FREIA 19th June 2017
Project management Ray Veness.
Bunker Project Schedule/Budget
UPPSALA UNIVERSITY_GERSEMI PROJECT
SNS PPU Cryomodule Instrumentation
Overview of the TARGET Monolith Rough Vacuum
TIK-4.3 Irradiation Module
Presentation transcript:

Target collaboratin Board Meeting 7th Meeting / August 2018 2018.08.30 I M. BUTzek

OUTLINE ESS Projects run and envisioned by FZJ / ZEA-1 Brief technical status Publication issues and how we tread work of other partners (good scientific practice)

Projects run and envisioned by FZJ Moderator & Reflector Plug (TIK 3.1) – ongoing / ready in early summer 2019 Cryogenic Moderator System (TIK3.2) – ongoing / ready in early summer 2019 Irradiation Module manufacturing (TIK 3.4) - finished Moderator (Butterfly 1) engineering feasibility study – ongoing / Mid 2019 Target Monitoring Plug (TIK4.1) - new project / estimated completion mid 2020 Neutron beam extraction system - planned project / phase 1 until April 2019 / phase 2 around end of 2020 (depends on results of phase 1)

Projects run and envisioned by FZJ Additional small projects LH2 Pump cooling system (external supplier) CMS control Cabinet (external supplier) Optical Retro Reflector Project (no funding yet) RAMAN view port characterization (master thesis)

TIK3.1 ebeam welding Assembling cold moderator Pre milled thermal Moderator thM with Irradiation Module Reflector vessel Cold Moderator Thermal moderator intermediate stage Twister Cold Moderator spacers Cold Moderator

TIK3.1 Final assembly of Rotation Unit at ZEA-1 forge the of Twister shaft 3D dimension check of Crown Test stand for Twister at ZEA-1 Delivery of 16t block raw material Twister Detail view of rotation mechanism Cold Moderator

TIK3.1 TIK3.4 Visual inspection He leak test 10-9 mbar*l/s Cold Moderators Irradiation Module non destructive testing (extra project in Cooperation with Uni Roma / R. Senesi) Visual inspection He leak test 10-9 mbar*l/s Dry penetration test X-ray test Over pressure test 24 bar Preparation for X-Ray inspection Assembly of Irradiation Module Weld identification x-ray image x-ray machine

CMS TIK3.2 o-p-converter welding LH2 pump test HX 2 inner part

TMP TIK4.1 Kick off just started Task of Target Monitoring Plug (TMP) Measure the x/y position of the wheel Measure the z position of the wheel Measure the helium coolant outlet temperature from each cassette during operation Measure shaft vibration during operation Measure helium borne sound in the helium coolant for acoustic diagnostics of the target cooling system and for acoustic diagnostics Measure the internal cooling system inlet and outlet temperature Source: ESS

NBEX WBS 12.4.2.4 New project / under evaluation Phase 1: Test Stands Prototype Phase 2: Neutron Beam Port Insert Neutron Beam Port Plug Neutron Beam Window Light Shutter System 42 inserts / plugs are needed Currently under evaluation if Juelich will be able to accept this project Source: ESS Source: ESS

Publication issues Good scientific practice We do have serious issues with the “culture” recognizing and respecting work performed by partners within the ESS collaboration. Even if there is no formal “Collaboration Agreement” signed we should follow “Good scientific practice”. Among others “Good scientific practice” includes: Naming people/institutions that have provided input as authors/coauthors in publications Add references/acknowledgment when using figures/photos from others Correct quoting of text/ figures/photos provided by others …

Publication issues Good scientific practice We talk a lot about “collaboration”, “partnership”, “collaborative effort”, … But reality often looks different: Some examples concerning our work: Drawings (designs) provided by Jülich ended up on printed ESS drawings with “Property of ESS” written in the title block of the drawing frame and no text mentioning the origin of the drawing. Paper published in „Physica Scripta“ with several pages of text as well as figures provided by Jülich without including the Jülich author nor mentioning Jülichs contribution at all. ESS Posters (latest seen in Paris during the German /French industry day) using figures provided by Jülich without including the Jülich author nor mentioning Jülichs contribution at all. ….

Publication issues Good scientific practice A publication policy will set the details about Do have partners that were not directly involved into a work package have to be informed prior to publishing work results? How much time in in advanced a partner has to be informed about a publication? How do we tread posters and talks? Does partners have a veto / can prevent publishing something? …. But before talking about a publication policy we have to discuss: How can we develop and live a collaborative working spirit within the ESS collaboration?