SANE – the last few days Time Period Activities 10/24-10/25

Slides:



Advertisements
Similar presentations
G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
Advertisements

COSM-HBCU Network Mahbub Khandaker Norfolk State University Mahbub Khandaker Norfolk State University Norfolk State University Example.
5 MeV Mott Measurement for CEBAF Operations group Joe Grames, Marcy Stutzman February 14 th, 2007 Sir Nevill F. Mott at the ceremony with his Nobel Prize.
R. Michaels PVDIS at Nov 2009 Beam Requirements for PVDIS Property ValueRun-Avg Hel. Correl. 1-Day Hel. Correl. Energy 6 and 4.8 GeVdE/E < 1 ppm < 5 ppm.
1-1 O Why Not Tonight O Why Not Tonight. 1-2 O Why Not Tonight O Why Not Tonight.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
S PIN A SYMMETRIES ON THE N UCLEON E XPERIMENT ( E07-003) Anusha Liyanage Experiment Nuclear Physics Group Meeting Hampton University May 11, 2009.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
Analysis of the Ammonia Target Polarization Kangkang L. Kovacs, Physics Department, University of Virginia, Charlottesville, VA
5 MeV Mott Polarimeter Progress Riad Suleiman April 10, 2012.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
Thomas Jefferson National Accelerator Facility Hall C Commissioning: The Past (1996) First Exp: “by consensus” What Hampton Univ. wanted What ANL wanted.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
MICE MICO Alain Blondel 23 December MICE Commissioning needs 22 December 08.
Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1.
SEM SIC SEM SIC 2 SEMs & 2 SICs closed to the Dumps 1 SIC, 1 Faraday cup & 1 SEM SEM SIC F. cup 4 similar set-ups : Girder 6,7,11 and 13 4 th – 8 th October.
DAQ Speed and Run2 Estimates April 3, Summary of FADC Development for Faster Performance NameReadoutTrigger ScalersScaler S1 (helicity gated), S2.
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
Mott Electron Polarization Results Riad Suleiman July 10, 2013.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Paul Scherrer Institut 5232 Villigen PSI EURISOL/BENE_2007, PSI /GF34 Joint High Power Target Meeting EURISOL/BENE , CERN Direct target irradiation.
CLAS Collaboration at Jefferson Lab Deuteron Spin Structure function g 1 at low Q 2 from EG4 Experiment Krishna P. Adhikari, Sebastian E. Kuhn Old Dominion.
Understanding the 3 He Nuclei: Asymmetry Measurements in Quasi- Elastic Ge Jin University of Virginia For the E Collaboration.
Spin Asymmetries of the Nucleon Experiment ( E07-003) Anusha Liyanage Advisor : Dr. Michael Kohl  Introduction  Physics Motivation  Detector Setup &
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
Jefferson Lab PAC 30 1 August 23, 2006 PR (Hall A) ● PR (Hall C) Measuring the Neutron g 2 and d 2 at 12 GeV PR (Hall A) ● PR
1 E Measuring the Neutron g 2 and d 2 at 12 GeV A cross section measurement on a polarized 3 He target in Hall C Directly measure the Q 2 dependence.
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Proton Form Factor Ratio GE/GM from Double Spin Asymmetry with
Bubble Chamber Schedule – 2017
-9:00: Test IP transverse adjustment (CMS) and optics verification.
James Johnson Northwestern University & Argonne National Lab
A Mini-Primer for Parity Quality Beam (as seen from the Accelerator)
Applied Calculus (MAT 121) Dr. Day Wednesday Feb 22, 2012
The G0 experiment at JLAB
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
GeoMesh Blockchain Networking - Slide Presentation
Day 3 1/23/15 Learning Target: Observation vs. Inference
Bubble Chamber Planning Meeting
To Do… Lab tomorrow – exam review. OWL due tonight by 10 pm.
G0 Accelerator Planning Meeting (11/1/05)
Parity Quality Beam (PQB)
Bubble Chamber Summer 2015 Installation and Beam Test Schedule
PEPPo Experiment Readiness Review
Picking up Salmon Eggs Salmon Eggs was picked up at Wolf Lake Hatchery. Mr. Hall and Mr. Robie attended the certification training. The Wolf Lake hatchery.
Bubble Chamber – Beam Requirements
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Helicity Magnets for PQB Feedback Helicity Magnets for PZT Booster
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
Gep/SANE this week – quick overview
The First CEBAF Experiment
BCM test in low current for g2p
StayTreat Wrap Up OPS 2015 StayTreat.
NPS Status Feb 01, 2019 Paulo M & Steven L.
Injector Commissioning & Optimization
Run Coordinator Report for PVDIS (E08-011)
Unit 3 My day.
Deuteron Electro-Disintegration at Very High Missing Momenta PR Hall C Collaboration Experiment Probe two nucleon dynamics at short space-time distances.
Polarized 3He target installation
Isotope Readiness Review Run Plans
Presentation transcript:

SANE – the last few days Time Period Activities 10/24-10/25 Hall C dump work Inspection of as-welded clearances (ATLis 7843) Certification 10/25-10/26 Beam setup and start commission Identify various startup problems (MPS BCM readback, BTA, ROC14, Analyzer etc.) Target (transfer lines, lifter) 10/27 Hall in restricted access Target work (lifter, rails) Helium bag DAQ, SEM Helicity Reporting Delay: NO DELAY Beam polarization: not at this energy

SANE – the next few days HMS commissioning Expect solid target to be available this evening SEM commissioning Energy measurement Commissioning with polarized target Currently expect this on Wednesday Still need Jlab to sign up for tonight’s and Wednesday owl shift leader