Facilities Planning and Design Course code:

Slides:



Advertisements
Similar presentations
Seven New Management and Planning Tools.
Advertisements

PROJECT RISK MANAGEMENT
Tree Diagrams 1. Learning Objectives Upon completing this module, you will be able to:  Understand the purpose and use of a Tree Diagram (TD)  Construct,
Systems Analysis and Design 9th Edition
New Quality Tools Douglas M. Stewart, Ph.D. The Anderson Schools of Management University of New Mexico.
Modern Systems Analysis and Design Third Edition
Management Tools Chapter 17
Management Tools Problem Solving Chapter 17 Doug Winter, Christy Blew, Anh Le, Jennifer Stoltz.
Quality Function Deployment Quality Function Deployment QFD Vivian Cherie KJ.
IE673Session 8 - BPR1 Business Process Reengineering (BPR)
Chapter 2 Basic Tools for Improving Quality. 7 Basic Tools by Ishikawa Histogram Pareto chart Scatter plot Control chart Cheek sheet Cause-and-effect.
A Training Presentation on the N7
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Quality Control Chapter 12- Management and Planning Tools
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
SUBJECT  Industrial facility design. GROUP MEMBERS H.Hammad Ali 11-IE-32 S.Hammad shah 11-IE-21 Hammad Hassan 11-IE-41.
Client Logo LEAN ENTERPRISE Implementation Workshop.
Chapter 11: Project Risk Management
CQI (TQM) Tools and Time Management. CQI or TQM?? u CQI – Continuous Quality Improvement or u TQM – Total Quality Management Technically, there are some.
© University of Wisconsin-Madison 1 Prioritization Matrix.
Management and Planning Tools
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
ENGM 620: New Magnificent 7 New Magnificent 7– 16 October 2010 Quality Tools –Ishikawa’s Basic Seven –The New Seven –Bonus Tools.
Quality Tools. Decision Tree When to use it Use it when making important or complex decisions, to identify the course of action that will give the best.
Interrelationship Digraphs
Strategic Planning in the Baldrige Criteria
Chapter9Chapter9 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Activities Budget Critical path Events Forecasting.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
4-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PPTs t/a Managerial Problem Solving by Wood Slides prepared by Robert Wood, Julie Cogin and Jens Beckmann.
Improvement Tools Part 2 Flowchart A picture of the separate steps of a process in sequential order. Click here.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Project management Topic 2 Planning.
Organize verbal information into a visual one, generally by writing down on separate pieces of paper AFFINITY DIAGRAM A sequenced plan.
Place Slide Title Text Here ©2013 John Wiley & Sons, Inc. All rights reserved. 8-1 ©2013 John Wiley & Sons, Inc. All rights reserved. JOHN R. SCHERMERHORN,
TQM and Reliability Engineering
Seven New Management and Planning Tools Reporter: Student no. 7.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project.
Overview of System or Process Design and Improvement 1.
Facility Design Issues. Back to the course objectives... Forecasting Strategic Planning Aggregate Production Planning Disaggregation Production Scheduling.
New 7 QC tools By Shuai Zhang Kun Wang.
Project and Project Formulation and Management
A Brief intro to Project Management What can it do for you
Project Management Systems
Management & Planning Tools
Fundamentals of Information Systems, Sixth Edition
Introduction to Methods Engineering
Buffalo Trace District Health Department
Eleanor Roosevelt High School
Operations Management
Decision Matrices Business Economics.
Project Implementation Plan
GE 6757 TOTAL QUALITY MANAGEMENT
Assignment Name:-Planning Tools Submit To:- Sir Fahad Maqbool Submit By:-Zunera Latif Roll No: (1.5 year) Registration No:-2017-GCUF- Government.
Module C: Presentation The Engineering / Design Process
Chapter 2 The Process of Design.
Chapter 8 Fundamentals of Planning
Chapter 7 Decision-Making Tools and Techniques Pamela S. Lewis
Facilities Planning and Design Course code:
P ROJECT M ANAGEMENT Skills.
Facilities Planning and Design Course code:
Tools for Implementation
Modern Systems Analysis and Design Third Edition
New Quality Tools Douglas M. Stewart, Ph.D.
Tools for Implementation
Facilities Planning and Design Course code:
Importance of Project Schedules
Facilities Planning and Design Course code:
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Facilities Planning and Design Course code: 1704031511 Spring 2017-2018 Required Text: Tompkins et al., (2003). Facilities Planning, 3rd or later Edition, John Wiley and Sons Inc. Students are encouraged to refer to the text book, and to take notes during the lectures.

Facilities Planning and Design Course code: 1704031511 Spring 2017-2018 Required Text: Tompkins et al., (2003). Facilities Planning, 3rd or later Edition, John Wiley and Sons Inc. Students are encouraged to refer to the text book, and to take notes during the lectures.

Chapter 2: Product, Process and Schedule Design Chapter Topics: PART I Facilities Planning Process for Manufacturing and Assembly Facilities. Relationship between PP&S design and Facilities Planning. Product Design PART II Process Design Process identification Process selection Process sequencing PART III Schedule Design Quantity of the product Equipment requirements Operator requirements PART IV Facilities Design Seven Management and Planning Tools used by a facilities design team

Relationship between PP&S design and Facilities Planning. Before we start developing alternative facility plans, we should have answers for the following questions: What is to be produced? How are the products to be produced? When are the products to be produced? How much of each product will be produced? For how long will the product be produced? Where will the products be produced?

Facilities design Figure 2.24 Use of management and planning tools in a facilities design project

Facilities design Matrix diagram Contingency diagram Seven management and planning tools that are used for system planning and improvement Affinity diagram Used to gather verbal data (ideas and issues) and organize into groups. Interrelationship diagram Try to relate the items and identify which item impacts the other Tree diagram Detailed study of items that need to be accomplished to reach the goal. Relationship between these items. Matrix diagram Organize information based on characteristics, functions, and tasks of items to compare and see the relationships Contingency diagram Maps the events and possible contingencies that might occur during the mplementation of the project Activity network diagram Used to develop a work schedule for the facility design effort Used to plan entire design process visually Prioritization matrix A tool for comparison of criteria Determines the most important criteria

Facilities design

1. Affinity Diagram example for reducing manufacturing lead-time Affinity diagram: This tool gathers large amounts of language data (ideas, opinions, issues, etc.) and organizes it into groupings based on the natural relationship between each item. It is largely a creative rather than a logical process.

2. Interrelationship diagraph for Facilities design issue Interrelationship digraph (I.D.): This tool takes complex, multivariable problems or desired outcomes and explores and displays all of the interrelated factors involved. It graphically shows the logical (and often causal) relationships between factors.

3. Tree diagram for Product Families Tree diagram: This tool systematically maps out in increasing detail the full range of paths and tasks that need to be accomplished in order to achieve a primary goal and every related sub goal. Graphically, it resembles an organization chart or family tree

4. Matrix Diagram for Team Participation Matrix diagram: This versatile tool shows the connection (or correlation) between each idea/issue in one or more other groups of items. At each intersecting point between a vertical set of items and horizontal set of items a relationship is indicated as being either present or absent. In its most common use the matrix diagram takes the necessary tasks (often from the tree diagram) and graphically displays their relationships with people, functions or other tasks. This is frequently used to determine who has responsibility for the different parts of an implementation plan.

5. Contingency Diagram-Process Decision Program Charts Process decision programme chart (PDPC): This tool maps out every conceivable event and contingency that can occur when moving from a problem statement to the possible solutions. This is used to plan each possible chain of events that needs to happen when the problem or goal is an unfamiliar one.

6. Activity network diagram Activity network diagram: This tool is used to plan the most appropriate schedule for any complex task and all of its related subtasks. It projects likely completion time and monitors all subtasks for adherence to the necessary schedule. This is used when the task at hand is a familiar one with subtasks that are of a known duration. Gantt Chart Weekly timetable for work sessions

7. Prioritization matrix Prioritization matrices: These tools take tasks, issues, or possible actions and prioritize them based on known, weighted criteria. They utilize a combination of tree and matrix diagram techniques, thus narrowing down options to those that are the most desirable or effective

7. Prioritization matrix –continued

7. Prioritization matrix –continued Criteria used to evaluate facilities design alternatives A. Total distance traveled B Manufacturing floor visibility C. Overall aesthetics of the layout D. Ease of adding future business E. Use of current equipment F. Investment in new equipment G. Space requirements H. People requirement I. Impact on WIP levels J. Human factor risk K. Estimated cost of alternatives Weights used in comparison of criteria 1= Equally important 5 = Significantly more important 1/5 = significantly less important 10 = extremely important 1/10 = extremely less important Ranking of Criteria – Weight of each criteria

Prioritization of Layout Alternatives Based on WIP Levels – Criterion - I Q R S T Column Total P Q R S T Row totals (%) 1 5 10 1/10 1/5 7.3 (9.9) 1/5 1 1/5 1/10 1/10 1.6 (2.2) 1 5 1 10 5 22.0 (30.0) 10 10 1/10 1 1/5 21.3 (29.0) 5 10 1/5 5 1 21.2 (28.9) 17.2 31.0 2.5 16.2 6.5 73.4 Layout WIP Levels

Ranking of Alternatives based on all Criteria and their weights P Q R S T Column A B C D E F G H I J K Row totals (%) .099  .183 = .018  (%P) .022  .183 = .004  (%Q) .300  .183 = .055  (%R) .290  .183 = .053  (%S) .289  .183 = .053  (%T) .183 Grand Total Criteria