Phases – Revised Version. 27 June 2003 N.B.: This graph only gives on overview of the project phases and does not replace the work plan with respect to.

Slides:



Advertisements
Similar presentations
CLM mobile learning project. Department of Education, Employment and Workplace Relations.
Advertisements

Working with MS-ACCESS IS 240 – Database Management Lecture #2 – Assoc. Prof. M. E. Kabay, PhD, CISSP Norwich University
1 OUT-IN: Organising, Using and Transferring INnovation LLP-LDV/TOI/07/IT/017 DISSEMINATION AND VALORISATION PLAN First transnational workshop Manchester,
Communication Platform Integration of conventional and electronic means Authors: Phys. Elena Stanila, IMT- Bucharest Eng. Marian Vasile, iMediaSoft Romania.
The use of SDMX at the ECB Xavier Sosnovsky European Central Bank Bonn,
UN-HABITAT Inter-Agency Task Force on Disaster Reduction 8 th Meeting, Geneva, Nov Working Group # 3 Tools and Best Practices for Risk and Vulnerability.
WHATS NEXT? November 17, 2006 Deadline for submitting Course Readiness Instrument Establish institutional teams January 22, 2007 Workshop #2: Developing.
WHATS NEXT? Establish institutional teams March 23, 2007 Deadline for submitting Course Readiness Instrument April 25, 2007 Workshop #2: Developing the.
NANPA Oversight Working Group Report to the NANC January 16, 2000 Chair Pat Caldwell.
NANPA Oversight Working Group Status Report to the NANC March 20, 2001 Chair Pat Caldwell.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
NANPA Oversight Working Group Status Report to the NANC November 27, 2001 Chair Pat Caldwell.
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 Information Dissemination Interim Report 6.1 v.04 Overview of carried.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
What is valorisation ? Growth €
ISO/TS WHO Informal Consultation on Nomenclatures for Medical Devices March 23-24, 2011 Leighton Hansel Convener ISO/TC210 WG3 Symbols and Nomenclature.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Results.
Notification of Digital requirements for the Draft Plan – Damascus, August Regional Information Meeting and Workshop related to the RRC-06.
Title III: Continuous Improvement Update on Program Developments for LEP Students.
April 19, 2012 SBE Presentation on Performance Evaluations.
LIFE Project Lifecycle Information for E-literature Richard Davies LIFE Project Manager The British Library CARL Visit to the BL 27 November 2007.
Investing in the future ESRC Funding Opportunities Michael Bright, ESRC.
ACC Professional Standards Committee Report 2006.
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
1 Dissemination to Policy and Decision Makers and a Wider Audience Peter J. Bates pjb Associates
15. Oktober Oktober Oktober 2012.
PeriData.Net® June 27, 2014, 10 a.m. CST  Webinar for hospitals using PeriData.Net®  Presented by the WAPC Perinatal Data Committee and Ancilla Partners.
A WARM WELCOME TO THE FAIRSTART KICK-OFF MERRY CHRISTMAS.
Heppenheim Producer-Archive Interface Specification Status of standardisation project Main characteristics, major changes, items pending.
Principles for Supplements, Series of amendments and Revisions to UN Regulations Note by the secretariat Taking into consideration: long transitional periods.
W Helmreich – Presentation to Sub-contractors; Brussels, 13/10/2005 WP 2: Monitoring, Analysis and Information Preparation Sub-contractor Meeting – 13.
National Environmental Research Institute, University of Aarhus, Denmark GIS Guidance update.
HOW IT ALL BEGAN….. The Forward Look “Mathematics and Industry”
School Census Summer 2010 Headlines 1 Jim Haywood Product Manager for Statutory Returns Version 1.0.
E uropean N etwork for B iodiversity I nformation Cees H.J. Hof Universiteit van Amsterdam EC supported 5th framework programme.
North Carolina Educator Effectiveness System Training Script.
Evaluation of Wellbeing 2 Quick update for grant holders Nicki Smith / Sarah Jenkins Ecorys UK #wellbeing.
HANSA NOVA: Managing a multicultural workforce in the Baltic Sea Region Co-financed by:
WORK EXPERIENCE MANAGEMENT Leonardo Project 20 – 22 February 2003 First Partnership Meeting in Italy.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
COMP6703 : eScience Project III ArtServe on Rubens Emy Elyanee binti Mustapha Supervisor: Peter Stradzins Client: Professor Michael.
Social Inclusion by Proactive Design InclusiveByDesign Second project meeting June 2001 Florence, Italy.
D ESTINATIONS P ROGRAM An Overview Seleni Matus Director of Tourism Belize Tourism Board June 2011.
TRINNODD TRansfer of INNOvation in Dual Diagnosis (LU/08/LLP-LDV/TOI )
URBACT Third Call for Proposals 09 Dec 2011 – 15 March 2012.
JCN, Justice Cooperation Network European Treatment and Transition Management of High Risk Offenders Tallin, 13 March 2013 Second Steering Committee Meeting.
Working Group 1 - Research Aims  1st phase - Collect… Data on:  current legislative environment  current practice at partner institutions On the basis.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
CENSUS INFO PROGRESS IN MALAWI. Malawi intends to use CensusInfo as the dissemination platform of its 2008 Population and Housing Census.
‘Innovation Policy in University City Regions’ INNOPOLIS Elena Vasilieva – University of Salford Project Manager.
Welcome Introductions Plans for the day Key milestones progress Agree final standards Participate in & evaluate activities Understand financial requirements.
11 June WP4 Forum and dissemination By Kim Haugbølle, WP4 leader Forum meeting 6, DG ENTR, Brussels.
RMCH Grant Management Presentation Grant products Development, Pretoria NDoH 28 August 2014.
JCN, Justice Cooperation Network European treatment and Transition management of High Risk Offenders.
Changing Trends in Library Technology 1 Changing Trends in Library Technology: or how I learned to love technology and realize that there will ALWAYS be.
12/13/01RFC Editor Report1 RFC Editor Report Bob Braden for Joyce K Reynolds 52nd IETF Meeting Salt Lake City, Utah December 13, 2001.
Overview of the Web Development Process.  Website Strategic Plan (Planning)  Content and Site Architecture (Planning)  Website Strawman (Planning)
2nd Project Meeting Berlin, 1 December 2000
Teacher Evaluation Timeline
SOCIAL DIALOGUE TIMELINE
Education and Training Statistics work programme 2005
Community of Practice on CIE
UNECE Statistical Division
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Pilot River Basin Water Framework Directive.
ETS WG, 30 January-1 February 2006 Agenda Item
Month 43: June 2016 – Month 50: January 2017 Remaining Deliverables
WP7 – Related activities
Presentation transcript:

Phases – Revised Version. 27 June 2003 N.B.: This graph only gives on overview of the project phases and does not replace the work plan with respect to exact dates and responsibilities. Data Collection – WG1 - ROC Tools and User Guide – WG 2 - TU Ostrava Phase 1 Phase 2 First Part of Phase 3 20/02/0219 – 20 Juneend Sept.20 – 22 Nov. 5 National Reports: National practice overview National good practice Comparative Report: Key issues for development National Good practice examples First part of Phase 3: Revision of existing tools and development of new tools Prague Meeting 19 – 20 June Review of Conclusions of 5 reports Conclude on key issues for Phase 3 Discuss first draft of Synthesis Report – POSTPONED TO LISBON, NOV Lisbon Meeting – transition phase 3 to 4 POSTPONED TO 20 – 22 NOV.. Analysis – WG1 - ROC

Phases – Revised Version. 27 June 2003 Testing - WG 3 – Athena Phase 4 15/01/04 – INTERIM REP. Phase 4 Testing Instruments ready Plan for 50 placements within on-going LdV mobility projects 50 Placements carried out Tools and User Guide – WG 2 - TU Ostrava Second Part of Phase 3 Second part of Phase 3: Draft User Guide 20 – 22 Nov. Lisbon Meeting Sept 2004 Tilburg Meeting – date to be decided spring 2004 Testing: Placements carried out Evaluation - WG 3 – TÜV Phase 5 Evaluation System designed Evaluation of Testing carried out Final User Guide and Tools Phase 5

Phases – Revised Version. 27 June 2003 Evaluation - WG 3 – TÜV Phase 5 Evaluation System designed Evaluation of Testing carried out Final User Guide and Tools November 2004 Practical Placements Database - WG 4 – ORFEO Phase 6 Phase 6: Database and Distribution of U.G and Tools Practical Placements Database set up Up-dating and Maintenance of information Dissemination - WG 5 – Ial Dissemination 2 Newsletters Web Site containing all project outputs 1 final International Conference 5 national dissemination seminars Dissemination is contained in Phases 6 and 7 Final International Conference in Italy December 2004 Possible additional meeting in Berlin – to be decided mid-Oct. Final User Guide & Tools