Wednesday June 30,  40-S2-A01 (open session)

Slides:



Advertisements
Similar presentations
R. Bruce, M. Giovannozzi, S. Redaelli With essential input from G. Arduini, R. De Maria, S. Fartoukh, M. Fitterer, R. Tomas, J. Wenninger, aperture team.
Advertisements

Simulation priorities for 2015 R. Bruce for task 5.2.
LHC Ring Collimation – Overview – R. Assmann, AB/ABP for the LHC Collimation Project.
Collimation MDs LHC Study Working Group Daniel Wollmann for the Collimation-Team, BLM-Team, Impedance-Team, … LHC Study Working Group,
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
Stimulating a discussion on cavity performance metrics.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
Eva Barbara Holzer IEEE NSS, Puerto Rico October 26, Beam Loss Monitoring System of the LHC Eva Barbara Holzer, CERN for the LHC BLM team IEEE Nuclear.
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
RWA, EPAC06 The LHC Collimation System R. Assmann, CERN/AB for the LHC Collimation Team EPAC 2006 Edinburgh.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
LHC Collimation Review 2013 Review Committee: Giorgio Apollinari (FNAL), Wolfram Fischer (BNL), Marzio Nessi (ATLAS), Carsten Omet (GSI), Rudiger Schmidt.
RWA LTC Preliminary results from SPS collimator MDs LTC R. Assmann for the collimation team.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
Concept of a Collimation System with Enhanced Operational Stability and Performance.
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
RWA, 4/11/2005 Review Movement & Motorization November 4 th, 2005 Program Introduction & Charge – R. Assmann Mechanical design & SPS results – O. Aberle.
Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator.
Panel Discussion on Single Particle Codes 1.Catalogue of existing codes 2.Transparency of input and output between different codes: what is the status.
HIGH RADIATION TO MATERIALS 20 TH P ROJECT T EAM M EETING – O CTOBER 14, 2010 Project Team Meeting CERN, October 14, 2010  Beam requests - operation I.
Update on the LHC collimation system design : status, deadlines and next steps R. Assmann AB/ABP.
B. Todd et al. 19 th August 2009 The Beam Interlock System Thanks to: Machine Protection Panel, R. Schmidt, B. Puccio, M. Zerlauth and many more… 0v2.
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
Summary Session 5 Chamonix 2011, 24. – Session 5: “High Intensity: Present and Future” R. Assmann & S. Redaelli Thanks to Frank Z. for his notes…
Collimation design considerations at CERN (with some applications to LHC) R. Bruce on behalf of the CERN LHC collimation project R. Bruce,
Ralph Assmann 1
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
R. Assmann Collimator Functionality, Performance and First View on Set-up and Optimization R. Assmann AB/ABP, CERN External Review of the LHC Collimation.
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
ColMat Welcome and Task 1 Ralph W. Aβmann Kick off Meeting of EuCARD/ColMat CERN – June 17 th, Jun 09 1R. Assmann.
CRYSTALS AS LONG-TERM IMPROVEMENT FOR LHC COLLIMATION
News and Introduction from CERN June 15th, 2005
ICE SECTION The coolest place to be! Elias Métral
BEAM LOSS MONITORING SYSTEM
e-lens Readiness Review Introduction
Scope of the Meeting: the Framework of the Collimation Project
Choices for the Collimation System & Collimation Impedance Issues
BEAM LOSS MONITORING SYSTEM
Intensity Evolution Estimate for LHC
Planning Quality control - Manufacturing logbook Photos Conclusions
CERN, Geneva, Switzerland PAC 2003 – Portland, Oregon, USA
¼ meshed models for Omega3P calculations
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Phase II Collimators : design status
LHC Collimation Requirements
IR2 aperture measurements: results, actions and proposal
The LHC Collimation Project Implementation of a Phased Approach
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
Collimation after LS1: cleaning and β* reach
Global aperture measurements at 450 GeV with 170 mrad crossing angle
RESISTIVE HEAT LOAD FOR THE TDI = LHC injection beam stopper
Collimation margins and *
Beam Loss Simulations LHC
Status of energy deposition studies IR7
Introduction and Requirements
Welcome and Logistics European Commission CEOS 2018 Chair team
Fawkner S.C Coaching curriculum implementation : 2016
NPA (Area Code) Relief in Quebec
Collimators: Operations - Baseline Assumptions
LHC External Collimation Review
NPA 236/250/604/778 Relief Planning Committee Meeting – Day 1 Wednesday, October 11, 2017 Delta Hotel – Vancouver, BC 9:00 Registration 9:15 Welcome and.
NPA 506 Relief Planning Committee Meeting – Day 1 Tuesday, September 12, 2017 Delta Hotel - Fredericton 9:00 Registration 9:15 Welcome and introductions.
Welcome CDR MPSID and MPSVAC, European Spallation Source ERIC, Lund, Sweden A. Nordt
FOLLOW-UP FOR THE TDI = LHC injection beam stopper
Presentation transcript:

Wednesday June 30,  40-S2-A01 (open session) Chair: S. Myers 14h30 Welcome R. Aymar 14h40 Charge to the committee (10min) S. Myers 15h00 The LHC collimation project - implementation of a phased approach (30min) R. Assmann 15h45 Coffee Chair: R. Assmann 16h00 Operational baseline assumptions (15min) M. Lamont 16h30 LHC aperture and collimator settings (15min) S. Redaelli 17h00 Machine protection role of collimators (15min) R. Schmidt 17h30 Collimator and beamline heating (15min) V. Vlachoudis 18h00 Adjourn

Thursday July 1,  40-S2-A01 (open session) Chair: P. Sievers 8h45 Logistics (5 min) M. Mayer 8h50 Mechanical engineering and thermo-dynamical calculations (30 min) A. Bertarelli 9h30 Results from heating test (15min) S. Calatroni 10h00 Manufacturing at CERN 10h30 Coffee Chair: P. Cruikshank 11h00 Mechanical robustness (15min) O. Aberle 11h30 Status of energy deposition studies IR3 (15min) J.B. Jeanneret 12h00 Status of energy deposition studies IR7 (15min) M. Magistris 12h30 Vacuum system in the cleaning insertions (15min) C. Rathjen 13h00 Lunch

Thursday July 1,  40-S2-A01 (open session) Chair: J.P. Riunaud 14h00 Impedance and trapped modes from collimators (15min) E. Metral 14h30 The beam loss monitoring system (15min) B. Holzer 15h00 Collimator functionality, performance and first view on set-up and optimization (15min) R. Assmann 15h30 The collimation of the LHC ion beams (15min) H. Braun 16h00 Coffee Chair: R. Bailey 16h30 Machine tolerances in cleaning insertions (15min) J. Wenninger 17h00 Collimator motorization and control (15min) F. Decorvet 17h30 Integration into control system (15min) M. Jonker 18h00 Radiological issues (15min) S. Roesler 18h30 Closure L. Evans 18h40 Adjourn