Project Resource Planning

Slides:



Advertisements
Similar presentations
MAINTENANCE PLANNING AND SCHEDULING
Advertisements

4. Capacity Planning. Basic Organizational Structures in a Production Plant: Functional Line Continuous Process Group Organization.
Capacity Planning ABI301.
Strategic Decisions (Part II)
CAPACITY LOAD OUTPUT.
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
PRODUCTION AND OPERATIONS MANAGEMENT
MANAGING PROJECT RESOURCES. Resource Allocation Problem  A shortcoming of most scheduling procedures is that they do not address the issues of resource.
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
Manufacturing’s Objectives
Chapter 8 Aggregate Planning in a Supply Chain
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Perencanaan Kapasitas Produksi
Utdallas.edu/~metin 1 Planning Demand and Supply in a Supply Chain Forecasting and Aggregate Planning Chapter 8.
MANAGING PROJECT RESOURCES
Aggregate Planning.
Managing Production and Supply Chains An introduction to the ProSim production management simulation.
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Resource Management. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall12-2 Types of Constraints  Time  Resource  Mixed Copyright.
MANAGING PROJECT RESOURCES
Human Resource Management - Session 2 Suhel Khan
Network analysis Homework:
T.L. Martin & Associates Copyright © 2008 Chapter 1 Fundamentals of Scheduling T.L. Martin & Associates, Inc Office Park Drive Gaithersburg, Maryland.
Resource analysis Project management (lecture + seminar)
PLANNING & SCHEDULING Dr. Talal Mandourah. Key Element of Planning and Scheduling.
Project management Topic 2 Planning.
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
Aggregate Planning Intermediate-range capacity planning that typically covers a time horizon of 2~12 months – may extend to as much as 18 months. Product.
Resource Loading and Leveling Kathy S. Schwaig. A Roadmap of the Project Planning Process Develop project charter Establish work breakdown structure Analyze.
Resource analysis 1 Project management (seminar).
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Production Planning and control – ME 1009 Unit 1 Introduction.
AGGREGATE PLANNING BY GRAPHICAL APPROACH Particularly for high volume, standardized product system & closed job shop systems, the concepts & methods of.
Chapter 7: Manufacturing Processes
Network analysis Homework:
Project Planning and Implementation
Procuring Professional Services
Maintenance Scheduling
Facility Inventory Old Facilities Modern Facilities Classroom Size
13 Aggregate Scheduling PowerPoint presentation to accompany
Scheduling Resources and Costs
MAINTENANCE PLANNING AND SCHEDULING
Chapter 8 Aggregate Planning in the Supply Chain
Performance Measures, Capacity Planning & Scheduling
Chapter 8 Aggregate Planning in the Supply Chain
ENGINEERING MANAGEMENT (GE 404)
In this tutorial you will:
Chapter 8 Aggregate Planning in the Supply Chain
THE HIERARCHY OF SCHEDULES
Lecture 6: Time-Cost Trade-Offs
ARCH 435 PROJECT MANAGEMENT
Project management (seminar)
Resource Planning, Cost Estimation and Budgeting
What is Project Human Resource Management (PHRM)?
Scheduling Resources and Costs
Human Resource Planning
13 Aggregate Scheduling PowerPoint presentation to accompany
Importance of Project Schedules
Network analysis Homework:
University of Debrecen Mongolian University of Life Sciences
Basics of Project Planning
Where We Are Now. Where We Are Now The Resource Problem Resources and Priorities Project network times are a schedule until resources have been assigned.
Set Up For Success : Reviewing Manufacturing Best Practices
FACULTY OF ENGINEERING CONSTRUCTION AND BUILDING DEPARTMENT
IEEE Aerospace Conference 2019 Rob Richards, Ph.D.
Manufacturing’s Objectives
Scheduling Resources and Costs
Pacific International Maritime Conference 2019
Presentation transcript:

Project Resource Planning

Resource Definition A resource may be defined as the machine or person who will perform the scope of work. Resource planning is forecasting the resources required to perform the scope of work within the time plan. The resource constraint should be considered after the network diagram, schedule bar chart and procurement schedule have been developed.

1. Resource Estimating The resource estimate is linked directly to the scope of work and bill of materials (BOM). The scope of work may be expressed as so many tones of steel, or so many square meters of wall to be painted etc. From this description the estimator can convert the scope of work into man-hours per unit "X".

1. Resource Estimating The next step is to consider the direct trade-off between the resource requirement and the activity's duration. Consider the following, if the scope of work is to erect 12 tones of steel and the estimator knows from past experience that the work can be done in 150 man-hours per tone and the men work 10 hour shifts, then the equation is:

1. Resource Estimating The resource / duration trade-off would then be as follows:­ By varying the resource availability, the duration of the activity will change.

2. Resource Forecasting The next step is to forecast the total resource requirement by discipline or interchangeable resource. This is done by compiling all the resource estimates and presenting them in a structured resource table.

2. Resource Forecasting

3. Resource Availability The next step is to quantify the resources available inside and outside the company. The following points should be considered: Other resource commitments - if your company is involved in a number of projects which all draw from a common labor pool, the other projects' requirements must also be considered.

3. Resource Availability The following points should be considered: The anticipated sickness and absenteeism rate – Example: allow for a 25% absentee rate based on your past time sheets

3. Resource Availability Keeping the above points in mind, the resource availability table will be developed. Consider the following example :

4. Resource Histogram The resource histogram is a popular planning tool because it gives a good visual presentation which is easy to assimilate and understand. The prerequisites for drawing the resource histogram are: Early start barchart (after considering the procurement requirements) Resource forecast per activity

4. Resource Histogram Consider the following example: Resource Table

4. Resource Histogram Barchart and Resource Histogram

5. Resource Loading The resource forecast is now compared with the resources available. The ideal situation is achieved when the resource requirement equals the resources available. Unfortunately, in project management this seldom happens, because it is not always possible to adjust supply with demand, so some form of compromise is essential.

5. Resource Loading A resource overload is when the resource forecast exceeds the available resources, while a resource underload is when resource forecast is lower than the available resource. A resource overload will lead to some activities being delayed which could delay the completion of the project. a resource underload will under utilize the company's resources which could have a detrimental effect on the company's profitability.

5. Resource Loading

5. Resource Loading The overloads and underloads can now be identified and addressed as follows: Resource Smoothing: assign resources to critical activities first, then try moving the other activities to ease any overload and under-utilization. Time-Limited Resource Scheduling: the end date of the project is fixed, so resources must be increased to address any overloads. Resource-Limited Resource Scheduling: the maximum number of resources is fixed, so the end date may need to be extended to address any overload. Increase Resources: to address an overload. Reduce Resources: to address an underload (underutilized).

6. Resource Smoothing Resource smoothing is the process of moving activities to improve the resource loading profile. The first step is to select the resource to be smoothed. To decide which resource to smooth consider: The resource that is most overloaded. The resource that is most used on the project. The least flexible resource - this could be the resource that comes from overseas, is difficult to get hold of or is least available. The most expensive resource to hire.

6. Resource Smoothing Resource smoothing Example

6. Resource Smoothing Barchart and Histogram

6. Resource Smoothing Smoothed Barchart and Histogram

7. Time-Limited Resource Scheduling Time-limited resource scheduling is used when the end date of the project cannot be exceeded. In which case any resource overloads will have to be addressed by increasing the resources when they are required This situation could occur when: The project has heavy time penalties. Building a new hotel to meet the summer season. Opening of the Olympic Games.

7. Time-Limited Resource Scheduling Once the end date of the project and milestones have been contractually agreed, time­limited scheduling will become a powerful tool to assist the planner to achieve these commitments.

8. Resource-Limited Resource Scheduling Resource-limited resource scheduling is when there is a resource limit which cannot be exceeded; if there are any resource overloads then some planned activities will have to be delayed. If this process delays any critical activities, then the end date of the project will be extended.

8. Resource-Limited Resource Scheduling This situation could occur when: A confined space مكان ضيق will limit the number of people able to work there. Where there are limited facilities. Where there are equipment limitations, e.g. the number of computers, machines, drawing boards, lifts or scaffolding سقالة. Safety requirements may limit the number of workers in a certain area.

9. How to Increase Resources? When the resources are overloaded there are a number of options to increase the resources available: Working Overtime Working Shifts Increase Productivity Learning Curve Sub-Contractors Scope of Work

10. Reduce Resources When the resources are underloaded, or there are a number of options for reducing the available resources: Move unemployed resources to critical activities. Pre-manufacture to make components before they are needed. Maintenance of equipment during slack periods. Train your workforce during slack periods to gain new skills.