EVLA M&C Components Observation Executor, Interim & Final Obs2script

Slides:



Advertisements
Similar presentations
Test Builder & Test Executor Sonja Vrcic Socorro, December 12, 2007.
Advertisements

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
5-6 Dec, 2006EVLA M&C Critical Design ReviewRich Moeser 1 Alerts Rich Moeser.
MONITOR AND CONTROL EXECUTOR REAL TIME PROGRAM.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
5-6 Dec, 2006EVLA M&C Critical Design ReviewRich Moeser 1 User Interfaces Rich Moeser.
June 14, 2004EVLA Software Communications Infrastructure Kevin Ryan 1 EVLA Software Communications Infrastructure.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Software Status Sonja Vrcic Socorro,
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
EVLA Monitor & Control Transition System Software
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Configuration Mapper Sonja Vrcic Socorro,
Output Formats Part I Bryan Butler NRAO Oct-31EVLA Correlator f2f2 Overview 2 types of data: –Monitor data - of interest to engineers and system.
Interim Data Capture & Format (IDCAF) Walter Brisken 2006 Dec 6.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
EVLA Software - Overview Bryan Butler NRAO. Bryan ButlerEVLA NSF Review 2006May History of EVLA Computing (1) EVLA computing consists of three parts:
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
Overall Data Processing Architecture EVLA timeline and priorities.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
Chapter 4. CONCEPT OF THE OPERATING SYSTEM MANAGING ESSENTIAL FILE OPERATIONS.
Software Overview Sonja Vrcic
Interaction of SSS Software
Bryan Butler EVLA Computing Division Head
EVLA Availability - or - When Can I Use It?
EVLA Archive The EVLA Archive is the E2E Archive
Committee Charge Fred K.Y. Lo
Monitor and Control Software
Correlator – Backend System Overview
EVLA Overall Software Design
EVLA Computing Software Overview.
Obs2script Bryan Butler.
VCI Overview Sonja Vrcic
Antenna Monitor & Control Subsystem Engineering Requirements
Software Requirements
EVLA M/C Software PDR, 14 May 2002
VLA to EVLA Transition Plan
Bryan Butler (for Bill Sahr)
EVLA Advisory Committee Meeting
Software Requirements
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
EVLA Monitor & Control System
Gustaaf van Moorsel September 9, 2003
Software Requirements
Operations Software Bryan Butler.
ENGINEERING REQUIREMENTS FOR BENCH TESTING, SYSTEM INTEGRATION, AND TEST ANTENNA Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002.
Mark McKinnon EVLA Project Manager
EVLA Advisory Committee Meeting, March 19-20, 2009
Prototype Correlator Tests on the Critical Path
Correlator Growth Path
EVLA Monitor & Control Bill Sahr NSF Review May , 2006
EVLA Construction Status
Requirements Bryan Butler.
Objectives. Objectives Objectives Content Configure Microsoft Azure monitor.
Presentation transcript:

EVLA M&C Components Observation Executor, Interim & Final Obs2script Antenna Monitor & Control (AMCS) - EVLA Antennas - VLA Antennas Correlator Monitor & Control (CMCS) - VLA Correlator - WIDAR Prototype Correlator - WIDAR Correlator: Configuration, Status, VCI, Power Control, MAHs, Diagnostic Screens VLA TelCal & EVLA TelCal Flagging VLA DCAF & EVLA DCAF VLA Archive & EVLA Archive User Interfaces - VLA Correlator Screens - Data Quality Displays – VLA Correlator - Data Quality Displays – VLA TelCal - WIDAR Correlator Screens - Data Quality – EVLA Correlator - Data Quality – EVLA Telcal - Array Operator Screen - EVLA Antenna Screens (module/subsystem screens) - Device Browser Parameters Database (System Parameters) Monitor Data Archive Alerts (including logging & messages) Operations Software