J. C. Sheppard SLAC September 29, 2006

Slides:



Advertisements
Similar presentations
I.R. Bailey, J.B. Dainton, L.J. Jenner, L.I. Malysheva (University of Liverpool / Cockcroft Institute)
Advertisements

I.R. Bailey, J.B. Dainton, L.J. Jenner, L.I. Malysheva (University of Liverpool / Cockcroft Institute)
30/10/09 Positron Workshop 1 Future Work Plan, Action Items, Future Meetings Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Ian Bailey University of Liverpool / Cockcroft Institute Target Design and Photon Collimator Overview EUROTeV: WP4 (polarised positron source) PTCD task.
Using Realistic Photon Spectra Mike Jenkins Lancaster University and The Cockcroft Institute.
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Ian Bailey University of Liverpool / Cockcroft Institute UK EUROTeV Photon Conversion Target Project EUROTeV: WP4 (polarised positron source) PTCD task.
TARGET HALL OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
NLC - The Next Linear Collider Project Sheppard/Pitthan June 26, 2015 Towards an Undulator Based NLC Positron Source Towards an Undulator Based NLC Positron.
NLC - The Next Linear Collider Project Sheppard/Pitthan July 14, 2015 POWER Meeting June 8=9,2002 Durham, England POWER Meeting June 8=9,2002 Durham, England.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Key luminosity issues of the positron source Wei Gai.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
Ian Bailey University of Liverpool / Cockcroft Institute UK Target Update EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Discussion, Action Items, & Future Work Plan Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 –
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
May Global Design Effort Americas Slide 1 May 2007 ILC Positron Systems Update J. C. Sheppard and V. Bharadwaj SLAC May 7, 2007.
Update on ILC Production and Capturing Studies Wei Gai, Wanming Liu and Kwang-Je Kim ILC e+ Collaboration Meeting IHEP Beijing Jan 31 – Feb 2, 2007.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Axel Brachmann, John Sheppard, Vinod Bharadwaj SLAC Particle Sources Efforts Review/Status and Plans SLAC HEP Program Review June 13 th, 2007.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
Positron Source Target Update Tom Piggott Jeff Gronberg Lisle Hagler Dain Holdener Marty Roeben This work was performed under the auspices of the U.S.
POSIPOL Berlin ILC/CLIC e + generation working group Wei Gai, ANL Louis Rinolfi, CERN Thanks to Omori-san for the coordination of the Webex meetings.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
October 9th, 2007 Daresbury – Positron Kick-Off Meeting Slide 1 Remote Handling Vinod K. Bharadwaj SLAC October 9th, 2007.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
Spin Tracking at the ILC Positron Source with PPS-Sim POSIPOL’11 V.Kovalenko POSIPOL’11 V. Kovalenko 1, G. Moortgat-Pick 1, S. Riemann 2, A. Ushakov 1.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim ILC GDE Meeting DESY May 30 – Jun2, 2007 Work performed for.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Pair-Production Target
Positron Update ILC R&D Meeting/ March 12, 07 VB & JCS
THE STATUS OF POSITRON SOURSE DEVELOPMENT AT CORNELL-II
NC Accelerator Structures
Vinod K. Bharadwaj SLAC October 8, 2007
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
CLIC Undulator Option for Polarised Positrons
ILC/CLIC e+ generation working group
Future Work Plan and Action Items
The DBD: Outline and Scope
Beam Dump outline work plan (UK perspective)
ILC RDR baseline schematic (2007 IHEP meeting)
Helical Undulator Insertion Device The heLiCal collaboration
May 2007 ILC Positron Systems Update
Electron Source Configuration
Summary for the Sources working group
A. Brachmann and J. C. Sheppard SLAC April 4, 2006
NC Accelerator Structures
Presentation transcript:

J. C. Sheppard SLAC September 29, 2006 ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Summary Discussion and Meeting Critique Discussions 9 and 10 J. C. Sheppard SLAC September 29, 2006 1 September 29, 2006

ILC Positron System Design and R&D Goals in Support of the TDR Discussion 9: Z2 Summary ILC Positron System Design and R&D Goals in Support of the TDR Z2: Meeting Summary Discussion: Action Items Z3: Meeting Format Discussion: What Works What Does Not Work What Do We Do Differently 2 September 29, 2006

ILC Positron System Design and R&D Goals in Support of the TDR Discussion 9: Z2 Summary ILC Positron System Design and R&D Goals in Support of the TDR Topic leaders will write a short summary for each meeting with an emphasis on accomplishments and action items: ~One Page The meeting chair is responsible for collecting the topical summaries and writing an overall summary of progress and expected goals by the time of the next meeting. 3 September 29, 2006

Discussion 9: Z2 Summary Topic Action Items: Target Systems Ian Bailey/Tom Piggott Looking to urgently prototype target wheel in UK. No one else currently requesting funding. Test first prototype baseline target at DL in Summer 2007. LLNL, Liverpool, DL to present p’type drawings at Feb ’07 meeting. Estimate force on wheel from pulsed OMD. Jeff to coordinate. Specify how prototyping plans depend on outcome of OMD studies. RAL/DL report on impact of remote-handling strategies (see target hall session) on target design at Feb ’07 meeting. Number of R&D cycles, milestones and timeline will be agreed by main participants by Dec ’06. John S to coordinate. RAL/Liverpool to investigate materials for the target rim and provide material spec sheets for Feb ’07 meeting. Ian will coordinate. Viability of beam windows (eg between target and accelerating cavity) needs to be definitively investigated. Plan needs to be in place by Dec’06. Vinod will coordinate. Viability of liquid metal target depends on proven design of suitable beam window . Cornell may wish to report on this issue at the Feb ’07 meeting. 4 September 29, 2006

For pulsed OMD need development plan Discussion 9: Z2 Summary Topic Action Items: OMD Jeff Gronberg Need to answer question of immersion effects in order to make OMD choice: need simulation benchmarked with experiment For SC solenoid need to understand radiation, power depo conditions and rad damage (simulation) For pulsed OMD need development plan Investigate range of zero field on target OMDs (MK at KEK) Report results and plans of spinning wheel experiments at Feb meeting 5 September 29, 2006

Discussion 9: Z2 Summary Topic Action Items: Capture RF Juwen Wang Progress. Five-cell L-Band SW test structure for capture section is under fabrication. Almost all parts and subassemblies are either done or in process. Still a lot of work need to be done in order to complete the final assembly by the end of 2006 or the beginning of 2007. All of five sets of parts for L-Band RF windows are in hands. A completed window is under cold test. Five vacuum flanges for test structures and Couplers have been completed. 2. In order to have a solid design for both positron and electron sources, we should fund a R&D program for L-Band TW structures. There are many challenges in both electrical, mechanical designs as well as fabrication aspects: They are long, the balanced cooling and pumping systems needs to be carefully studied and inductive brazing technique needs to be practiced at SLAC. They have low group velocity (as low as 0.16%c), the impact of big transient effects needs to be investigated and tested. They work at long beam pulses (1 ms), the operational stabilization needs to be studied and tested. 6 September 29, 2006

Target Hall Vinod Bharadwaj Discussion 9: Z2 Summary Topic Action Items: Target Hall Vinod Bharadwaj More activation/damage calculations Identify what numbers are needed from the calculations Figure how to do the simulation – which program(s) etc. identify people to do the simulations include detailed layout of hardware: OMD, SW RF, TW RF, solenoids, shielding Define target hall dimension requirements target hall occupancy needs needed shielding what is in the hall and what is on the surface scenarios for all the needed repair/replacement operations KAS target hall Does ILC plan to have a central hot cell facility? e+ , dumps etc. will it be useful for the positron stuff Re-visit two/one target requirement (availability, R&R time,……) 7 September 29, 2006

Undulator Scheme Jim Clarke Discussion 9: Z2 Summary Topic Action Items: Undulator Scheme Jim Clarke Two sets of conflicting undulator parameters are proposed – ‘high K’ and ‘low K’. This should be resolved as a priority. Start to end simulations carried out with a benchmarked code are needed from the entrance of the undulator to after the positron capture section to understand the differences. Results to be reviewed at the next meeting. In the meantime the UK undulator parameters are adopted as the baseline. Period = 11.5mm, beam aperture = 5.85mm, Kx = Ky = 0.92. UK to prototype 4 m module in calendar 2007. Beam test plan should be reviewed at the next meeting. Need magnetic measurements plan for the long prototypes UK group to review 80% design margin by Feb 07. 8 September 29, 2006

F. Laser-Compton Scheme Masao Kuriki Discussion 9: Z2 Summary Topic Action Items: F. Laser-Compton Scheme Masao Kuriki Develop full design which is compatible with current ILC design: full source accelerator design: OMD, rf, yield calcs Simulation of compton ring dynamics, incl nonlinear beam dynamics Simulation of e+ stacking in the ILC DR. Optical cavity and laser experiments „Schedule“ for compton scheme development, now thru completion: how to we get from here to there 9 September 29, 2006

Conventional Scheme Bharadwaj/Sheppard nothing to report Discussion 9: Z2 Summary Topic Action Items: Conventional Scheme Bharadwaj/Sheppard nothing to report 10 September 29, 2006

Accelerator Physics Gudi Moortgat-Pick Discussion 9: Z2 Summary Topic Action Items: Accelerator Physics Gudi Moortgat-Pick Collect into a single report dilution and depolarization studies; what additional issues? Propose how to do commissioning w/o Keep Alive Source Start-to-end tracking w/ spin tracking, schedule Fix GigaZ parameters Optical Deck for specifications and tolerances Status of e+ tracking studies incl/ e- thru undulator insertion (ILC low emit folks,….) 11 September 29, 2006

Polarization Sabine Riemann Discussion 9: Z2 Summary Topic Action Items: Polarization Sabine Riemann Report on tools and scope of activities at Feb. meeting 12 September 29, 2006

ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Discussion 9: Z2 Summary ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Thanks for coming to this meeting and a special thanks to Yury Ivanyushenkov and Glyn Northing for organizing us and to RAL for hosting us Next Meeting: Asia, M. Kuriki prior to and in association with February GDE Beijing Meeting 13 September 29, 2006

ILC Positron System Design and R&D Goals in Support of the TDR Discussion 10: Z2 Summary ILC Positron System Design and R&D Goals in Support of the TDR Discussion: Every thing is open for discussion: format, discussion leaders, topics, organization, schedule, ILC Will have a session on Friday to discuss how this meeting has gone; what changes are required; what went well; what is clearly not working;……. I think that it will take about 3 meetings (1 year ) to settle out on this process (allow phone and video links to the 3 annual meetings Gudi Mortgat-Pick makes and maintains group mail server Declare a spokesman for collaboration: J Sheppard, for the time being 14 September 29, 2006

Discussion, comments, suggestions Discussion 10: Z2 Summary ILC Positron System Design and R&D Goals in Support of the TDR Discussion, comments, suggestions What Works What Does Not Work What Do We Do Differently 15 September 29, 2006