North Shore at Canton The Pennsylvania State University

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Riverview Heights Darren K. Howard Structural Option Architectural Engineering Spring Thesis 2005 Advisor: Dr. Ali Memari.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
CE A434 – Timber Design Structural Behavior.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Kirk Stauffer BAE / MAE - Structural Option Senior Thesis Project Life Sciences Building The Pennsylvania State University University Park Campus.
George Read Hall The University of Delaware
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Duquesne University Forbes Expansion
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Nicole C. Drabousky Pennsylvania State University Architectural Engineering Structural Option Spring 2006 Senior Thesis Presentation.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Nicholas Reed Structural Option Seneca Allegany Casino Hotel Addition AE Senior Thesis 2013 Courtesy of Jim Boje, PE.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Nijad Rudy Boukhalil structural option spring’05.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
AE Senior Thesis 2009 U.S. Pharmacopeia Headquarters Consolidation Rockville, MD Analysis and Design of a Mild Reinforced One way slab with Post Tensioned.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Pearl Condominiums Philadelphia, PA
North Shore Equitable Building
Advisor: Professor M. Kevin Parfitt
Agricultural Hall and Annex Easting Lansing, MI
Outline Introduction Structural Redesign Gravity System
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

North Shore at Canton The Pennsylvania State University Beau Menard Structural Option Advisor: Professor Parfitt The Pennsylvania State University Architectural Engineering Senior Thesis

North Shore at Canton Table of Contents: Building Overview Beau Menard Structural Option Table of Contents: Building Overview Problem Statement Solution Overview Structural Redesign Steel Solution Pre-cast solution Construction Management Issues Material Costs Construction Durations Conclusion Acknowledgements Questions

North Shore at Canton Building Overview Location Baltimore, MD Beau Menard Structural Option Building Overview Location Baltimore, MD 2300 block of Boston Street Residential Structure 1 level covered parking 3 levels of living units 60,000 sq ft

North Shore at Canton Building Overview Structural System Foundation Beau Menard Structural Option Building Overview Structural System Foundation Pre-cast concrete piles Concrete strength, f’c = 7000 psi Grade 60 reinforcing steel Parking level Floor system- 12” pre-cast planks w/ 4-1/2” topping Steel Columns and Girders 8” pre-cast planks w/ 2-1/2” topping

North Shore at Canton Building Overview Structural Systems Beau Menard Structural Option Building Overview Structural Systems Living Units Bearing/Shear wall system Steel Studs ½” Gypsum Sheathing Floor system 16” deep pre-engineered wood floor trusses, spaced 16” o.c. ¾” OSB topping Roof system Pre-engineered roof trusses, spaced 24” o.c.

North Shore at Canton Problem Statement Inherent Moisture Problem Beau Menard Structural Option Problem Statement Inherent Moisture Problem Structural Integrity

North Shore at Canton Solution Overview Structural Solution Beau Menard Structural Option Solution Overview Structural Solution Steel Redesign Combination Moment and Braced Frame Open web steel joists Pre-cast Concrete Redesign Shear-wall lateral system Pre-cast columns and girders Pre-cast planks

North Shore at Canton Structural Redesign Beau Menard Structural Option Structural Redesign Design Loads (IBC 2003 & ASCE 7-02) Live Load 40 psf Roof Live Load ~ 20 psf Snow Load 20 psf Lateral Loads Wind Load ~ 20 psf (steel structure) Seismic Loads as noted (concrete structure) Dead Loads Structure Weight ~ varies Roof Dead Load ~ 20 psf MEP and Ceiling ~ 20 psf

North Shore at Canton Structural Redesign Steel Design Floor System Beau Menard Structural Option Structural Redesign Steel Design Floor System Open Web Steel Joists 16k4 (25’ max span, 3’ spacing) Allowable Load ~ 313 plf Total Load ~ 270 plf Metal Decking 19 gauge (3 span) 1-1/2” x 6” Light weight Concrete topping 2-1/2” topping w/ gypsum ceiling

North Shore at Canton Structural Redesign Steel Design Beau Menard Structural Option Structural Redesign Steel Design Initial frame systems Moment frame vs. Braced frame Combination Frame Moment and Braced Connections

Structural Redesign - Steel North Shore at Canton Beau Menard Structural Option Structural Redesign - Steel 1st Floor Main Lateral Force Resisting System 5 Combination Frames Columns w 10x49 (typ) Girders w 21x50 (int) w 18x35 (ext) Bracing elements w 8x24 (typ) Moment Frame w 10x49 w 18x40

Structural Redesign - Steel North Shore at Canton Beau Menard Structural Option Structural Redesign - Steel 2nd Floor Main Lateral Force Resisting System 5 Combination Frames Columns w 10x49 (typ) Girders w 18x35 (int) w 16x26 (ext) Bracing elements w 8x24 (typ) Moment Frame w 10x49 w 18x40

Structural Redesign - Steel North Shore at Canton Beau Menard Structural Option Structural Redesign - Steel 3rd Floor Main Lateral Force Resisting System 5 Combination Frames Columns w 10x49 (typ) Girders w 16x26 (int) w 16x26 (ext) Bracing elements w 8x24 (typ) Moment Frame w 10x49 w 18x40

Structural Redesign - Steel North Shore at Canton Beau Menard Structural Option Structural Redesign - Steel 4th Floor Main Lateral Force Resisting System 5 Combination Frames Columns w 10x49 (typ) Girders w 22x55 (typ) Moment Frame w 10x49 w 18x40

Structural Redesign - Steel North Shore at Canton Beau Menard Structural Option Structural Redesign - Steel Lateral Deflection Story Total Lateral Displacement (in) 1 .041 2 .079 3 .121 4 .276

Structural Redesign - Steel North Shore at Canton Beau Menard Structural Option Structural Redesign - Steel Gravity Frame Columns w 10x49 (typ) Girders w 16x26 w 18x40 w 21x44 w 24x55 Bracing elements w 8x24 (typ)

Structural Redesign - Steel North Shore at Canton Beau Menard Structural Option Structural Redesign - Steel Foundation Impact Slight Increase in axial loads Lateral Load transfer Pile Capacity 130 tons Compression 30 tons tension

Structural Redesign – Pre-cast North Shore at Canton Beau Menard Structural Option Structural Redesign – Pre-cast Typical Frame Layout Foundation Impact Shear walls Columns Girders

Structural Redesign – Pre-cast North Shore at Canton Beau Menard Structural Option Structural Redesign – Pre-cast Shear Walls Location Long walls Short walls Loads Applied Seismic Controls Reinforcement Spacing ~ 18” ρ = 0.0025 # 6 bar

Structural Redesign – Pre-cast North Shore at Canton Beau Menard Structural Option Structural Redesign – Pre-cast Columns Level 3-12”x12” 2-12”x12” 1-14”x14” Reinforcement γ = 0.6 (conservatively) ρ = 0.03 3 -# 7 bars / face

Structural Redesign – Pre-cast North Shore at Canton Beau Menard Structural Option Structural Redesign – Pre-cast Girders Interior 12”x14” Moment Reinforcement 3-#9 (bot) 4-#9 (top) Shear/torsion Reinforcement #3 bars @ s = 7” Perimeter 10”x12” 2-#5 (bot) 2-#5 (top) #3 bars @ s = 6”

Structural Redesign – Pre-cast North Shore at Canton Beau Menard Structural Option Structural Redesign – Pre-cast Floor System Pre-cast Planks Span ~ 25’ 8”x4’ SpanDeck –U.L.-J917 Flexure 4 - 1/2" Φ allowable load = 110 psf total load = 90 psf 2” concrete topping

Structural Redesign – Pre-cast North Shore at Canton Beau Menard Structural Option Structural Redesign – Pre-cast Foundation Impact Greatly Increase in axial loads Lateral Load transfer Shear wall connections

Construction Management – Cost North Shore at Canton Beau Menard Structural Option Construction Management – Cost Current system Pier cost ~ $ 1,000,000 Town home cost ~ $448,600 Includes structure and facade Steel System Frame Cost ~ $650,000 Includes framing and floor system No additional pier cost Pre-cast System Frame cost ~ $750,000 Pier cost increased

Construction Management – Durations North Shore at Canton Beau Menard Structural Option Construction Management – Durations Current system Pier construction ~ 5 months Town home construction ~ 5 months Includes structure and facade Steel System Frame construction ~ 4 months Includes framing and floor system No additional pier construction Pre-cast System Frame construction ~ 6 months Additional pier construction required

Conclusions / Recommendations North Shore at Canton Beau Menard Structural Option Conclusions / Recommendations Steel Redesign Advantages Light Weight Less impact on foundation Cost effective Shorter construction durations Disadvantages Complex connections Additional moisture protection Additional fire proofing Pre-cast Redesign Advantages Moisture resistant Fire resistant Reduce lateral members Disadvantages Increased structure weight Complex connections Greatly impacts foundation Increased cost Slightly increased construction durations

North Shore at Canton Acknowledgements Beau Menard Structural Option Acknowledgements Don Taylor ~ DW Taylor Architects and Associates Jim Diepold ~ Whitney, Bailey, Cox, Magnani Friends and Family AE Faculty

North Shore at Canton Questions The All Knowing Man of Steel Beau Menard Structural Option Questions The All Knowing Man of Steel Man of Steel