Operator Training Requirements

Slides:



Advertisements
Similar presentations
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Advertisements

ESS Cryogenic System Design
UNICOS-CPC applied to Cryogenics and specifications Benjamin Bradu EN-ICE-PLC February 2014.
Current status Arkadiy Klebaner November 21, 2012
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
CRYOGENICS AND POWERING
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Installation of the T600 at Fermilab CSN2, September 22,
TE-CRG Activities D. Delikaris, TE-CRG.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
LCLS-II Cryoplant Overview
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
Installation Package - Electrical
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Cryogenic Plant Controls - Configuration
Director’s Progress Review Closeout Meeting
Cryoplant Installation Cost and Schedule Installation PDR
Cryoplant Controls Installation
Cryogenic Plant Controls – Cost and Schedule
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
Cryogenic Plant Electrical and Controls
2 K Coldbox Safety and ESH
2K Cold Box FDR Introduction
Cryomodule test stand at ESS site
He Plant, LN2 Systems and Commissioing
2K Cold Box PDR Introduction
FRIB Cryogenic Support
Cryoplant Installation Overview
Electrical and Controls
Online Helium Inventory Monitoring of JLab Cryogenic Systems
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
LCLS-II 2K Cold Box Controls Design Review
Overview of Mechanical Design
BDS Cryogenic System RDR Status and EDR Plans
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Instrumentation and Controls
Testing/Commissioning of 2 K Cold Box
2K CB FDR Overview:  Agenda, Charge, Review Process
2K Cold Box Mechanical Design
Director’s Progress Review Closeout Meeting
Cryogenic Plant Controls – Safety Switches
Pressure Piping Analysis
Mathew C. Wright January 26, 2009
ILC Experimental Hall Cryogenics An Overview
LCLS-II Cryoplant Controls FDR Status of Past Reviews and Lessons Learned Dana Arenius Sept 13, 2017.
PLC Coding and Local HMI
Charge 2. Equipment Protection 3. Definition and Documentation
Scope, Requirements Deliverables & Schedule
Documentation Chris Scanlon and Ritendra Bhattacharya
Overarching Commissioning Plan
Control Hardware & Status
Testing Plan and Status
SNS Cryoplant Commissioning Past Experiences
CryoPlant Commissioning
Onsite Training at JLab
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Overview of the TARGET Monolith Rough Vacuum
LCLS-II Operations in LERF
Presentation transcript:

Operator Training Requirements Chris Scanlon and Ritendra Bhattacharya LCLS-II Software Review November 14, 2018

Charge 1. GENERAL b. Is the schedule compatible with the overall plan including installation and commissioning? c. Is the control team organized and staffed to successfully complete the project? 3. DEFINITION AND DOCUMENTATION a. Are all automated functions (alarms, trips, interlocks / permissive, cause and effects, control loops, and automated sequences) sufficiently documented for coding, testing, commissioning, operation and troubleshooting? 5. BENCH TESTING a. Has JLab developed an appropriate plan for testing the cryoplant control systems? b. Is the EPICS HMI testing integrated with the PLC tests? 6. COMMISSIONING a. Has JLab developed a plan to perform commissioning? b. Have the required resources been identified? c. Does Jlab’s plan for commissioning and testing of the coldboxes appropriately address commissioning and checkout of the PLC controls prior to testing the coldboxes? LCLS-II Software Review, November 14, 2018

Outline Semi-Automated Cryoplant Operator Intervention SLAC Support Operator Requirements Precommissioning Commissioning Activities Commissioning Schedule LCLS-II Software Review, November 14, 2018

Semi-Automated Cryoplant The LCLS-II cryoplants are not commercial air separation plants where you can push the start button and walk away. Operating a small cryogenic plant requires a deep knowledge of how the system works. This becomes more complicated when operating a 4kW 2K plant. Steady state running is automated, thanks to many PID loops. But even automated processes require operator supervision. Due to many manual valves throughout the cryogenics plant, many transition operations are manual. The manual operation philosophy provides flexibility during initial operation to cater the plant to actual conditions. LCLS-II Software Review, November 14, 2018

Operator Intervention Alarms and trips will require operator intervention, either remotely or on site. Whether they can be dealt with remotely or on site depends on many factors, including SLAC operational guidelines such as starting rotating equipment remotely. water pump warm compressor recovery compressor LCLS-II Software Review, November 14, 2018

SLAC Support JLab has 1.5 FTEs to support SLAC through the 2 years of commissioning. This means that most operations will be performed by SLAC operators. JLab operators can teach SLAC operators to run a cryogenics plant, but this must be translated through SLAC site policies. In JLab’s experience, it takes a full time engineer 18 months to be competent in operating a cryoplant. SLAC operators will need to have a significant amount of time operating and maintaining a cryoplant before commissioning starts. There are 4 months before commissioning is scheduled to start. LCLS-II Software Review, November 14, 2018

Operator Requirements Operators must be able to Read a P&ID and understand how that system works Identify a need to troubleshoot mechanical and electrical systems Troubleshoot process issues such as: Excessive load on the plant Poor insulating vacuum Linac heat management Technicians must know how to troubleshoot electrical and mechanical systems Troubleshoot instrumentation Calibrate PTs Calibrate valves LCLS-II Software Review, November 14, 2018

Every subsystem will need Precommissioning The PLC software and EPICS will be thoroughly tested prior to arrival at SLAC. Precommissioning activities will need to start in February 2019 in order to start commissioning the recovery compressors in April 2019. Every subsystem will need To be vacuum pumped and backfilled multiple times to remove all of the moisture and gas that’s not Helium Electrical power checkout PLC running Controls wiring and instrument checkout, calibration LCLS-II Software Review, November 14, 2018

Commissioning activities Before commissioning Pump and back fill warm Helium tanks, Helium gas distribution system piping, recovery system piping. Fill liquid nitrogen dewars Fill warm Helium tanks If SLAC employees can perform the precommissioning activities, JLab will have more resources available for commissioning. LCLS-II Software Review, November 14, 2018

Commissioning Activities Recovery compressors Helium purifier Warm Helium compressors Secondary cooling water system 4K cold box 2K cold box Oil processor Instrument air system Guard vacuum LCLS-II Software Review, November 14, 2018

Commissioning Schedule The P6 commissioning schedule was developed assuming that each subsystem and its supporting subsystems were installed prior to their commissioning. JLab received the installation schedule last week and has not had time to coordinate it with commissioning activities. JLab cryogenics staff will be on site during commissioning in addition to the possibility of remote support from other JLab cryogenics staff. LCLS-II Software Review, November 14, 2018

Charge 1. GENERAL b. Is the schedule compatible with the overall plan including installation and commissioning? Maybe. c. Is the control team organized and staffed to successfully complete the project? Yes, but will need SLAC support. 3. DEFINITION AND DOCUMENTATION a. Are all automated functions (alarms, trips, interlocks / permissive, cause and effects, control loops, and automated sequences) sufficiently documented for coding, testing, commissioning, operation and troubleshooting? Yes. 5. BENCH TESTING a. Has JLab developed an appropriate plan for testing the cryoplant control systems? Yes. b. Is the EPICS HMI testing integrated with the PLC tests? Yes. 6. COMMISSIONING a. Has JLab developed a plan to perform commissioning? Yes. b. Have the required resources been identified? Yes, but will need SLAC support. c. Does Jlab’s plan for commissioning and testing of the coldboxes appropriately address commissioning and checkout of the PLC controls prior to testing the coldboxes? Yes, the cold box software will be thoroughly tested. LCLS-II Software Review, November 14, 2018

THANK YOU FOR KIND ATTENTION LCLS-II Software Review, November 14, 2018