Status of Slave Board (SLB) ASIC

Slides:



Advertisements
Similar presentations
The Embedded Compression Dump OCI Investigations.
Advertisements

BOUNDARY SCAN.
Chapter 13 Shift Registers
FPGA Configuration. Introduction What is configuration? – Process for loading data into the FPGA Configuration Data Source Configuration Data Source FPGA.
20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
The 8051 Microcontroller Chapter 5 SERIAL PORT OPERATION.
Digital Logic Design Lecture 23. Announcements Homework 8 due Thursday, 11/20 Exam 3 coming up on Tuesday, 11/25.
20 Feb LVL1 muon trigger simulation meeting1 the OO codes for endcap muon trigger simulation Hisaya Kurashige KOBE Univ.
Lecture 28 IEEE JTAG Boundary Scan Standard
TAP (Test Access Port) JTAG course June 2006 Avraham Pinto.
Configuration. Mirjana Stojanovic Process of loading bitstream of a design into the configuration memory. Bitstream is the transmission.
1 EE 587 SoC Design & Test Partha Pande School of EECS Washington State University
Scan and JTAG Principles1 Scan and JTAG Principles ARM Advanced RISC Machines.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Sakari tiuraniemi - CERN Status of the submission – End of Column.
CF 8/June/2003 ATLAS muon week in Gallipoli 1 The 1 st Beam Test of TGC electronics at H8 in May/June ‘03 Chikara Fukunaga on behalf of TGC electronics.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTEMS Boundary Scan.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
April 20, 2001VLSI Test: Bushnell-Agrawal/Lecture 281 Lecture 28 IEEE JTAG Boundary Scan Standard n Motivation n Bed-of-nails tester n System view.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
14/Sept./2004 LECC2004 Irradiation test of ASIC and FPGA for ATLAS TGC Level-1Trigger System 1 TID (  -ray) and SEE (proton) tests and results for ROHM.
VMM ASIC ― Status Report - April 2013 Gianluigi De Geronimo
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
Built-In Self Test (BIST).  1. Introduction  2. Pattern Generation  3. Signature Analysis  4. BIST Architectures  5. Summary Outline.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
CCU25 Communication and Control Unit ASIC in CMOS 0.25 μm Ch.Paillard
CO5023 Latches, Flip-Flops and Decoders. Sequential Circuit What does this do? The OUTPUT of a sequential circuit is determined by the current output.
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
TGC electronics meeting at CERN June/ Status of ASIC development for TGC electronics PP SLB Hi-pT JRC PPE SSW-rx VME protocol Chikara Fukunaga TGC.
H-pT ASIC A.The logic of H-pT ASIC 1. overview 2. matrix, encoder, selector… B. Test result 1. verification 2. electrical characteristics C. Usage.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
Status and Plans for Xilinx Development
C.Beigbeder, D.Breton, M.El Berni, J.Maalmi, V.Tocut – LAL/In2p3/CNRS L.Leterrier, S. Drouet - LPC/In2p3/CNRS P. Vallerand - GANIL/CNRS/CEA SuperB -Collaboration.
ATLAS Pre-Production ROD Status SCT Version
Firmware for the CPLD on the RCU
LHC1 & COOP September 1995 Report
Topics SRAM-based FPGA fabrics: Xilinx. Altera..
VMM ASIC ― Status Report - April 2013 Gianluigi De Geronimo
APSEL6D Architecture, simulations and results
Introduction An interrupt is an event which informs the CPU that its service (action) is needed. Sources of interrupts: Internal fault (e.g.. divide by.
Sector logic firmware and G-link Merger board designs
ABC130 Testability and SEU Protection Reset eFUSE
Iwaki System Readout Board User’s Guide
Connection btw FE and Merger
VME Bus error A possible error condition for TMB whose firmware has been “misloaded” is to cause Bus Error on VME crate controller (VCC) at power up… Under.
PRR of the TGC SLB and SSW (Reported by CF)
INTRODUCTION Overview of Shift Registers
NSW Electronics workshop, November 2013
CPE/EE 428/528 VLSI Design II – Intro to Testing (Part 2)
CPE/EE 428/528 VLSI Design II – Intro to Testing (Part 3)
Torsten Alt, Kjetil Ullaland, Matthias Richter, Ketil Røed, Johan Alme
Elec 2607 Digital Switching Circuits
ECEN 248: INTRODUCTION TO DIGITAL SYSTEMS DESIGN
74HC(HCT)40105 High Speed CMOS Logic 4-Bit x 16-Word FIFO Register
SYEN 3330 Digital Systems Chapter 7 – Part 1 SYEN 3330 Digital Systems.
DAVE card Firmware Blocks
"Computer Design" by Sunggu Lee
PID meeting Mechanical implementation Electronics architecture
TPC Electronics Meeting, 13/01/05 Carmen González Gutiérrez
Week 11 Flip flop & Latches.
Computer Architecture Assembly Language
CBETA bunch pattern and BPM trigger generator Version 2
Introduction Communication Modes Transmission Modes
Presentation transcript:

Status of Slave Board (SLB) ASIC SLB ASIC (version 1) used in Slice Test 2001 has bugs in JTAG, Readout block (Parallel to Serial Converter: PSC). Timing instability of the long shift registers of PSC[218] and Control part (Mask[160] and Test Pulse[160]) Confliction of JTAG TDO data at the state transition from “shift” to “capture” DR due to timing problem Bug fixed version SLB ASIC (version 2) has been delivered in July,2002 and tested since then. 7/10/2002 C.Fukunaga @ TGC electronics meeting in CERN

Error phenomena Shift register problem Frame Prev. BC data Current data Next data 2. JTAG state transition problem 7/10/2002 C.Fukunaga @ TGC electronics meeting in CERN

C.Fukunaga @ TGC electronics meeting in CERN Cure for the bugs Introduction of Master-slave shift register structure A small logic to ensure c(apture)DR must come later than TCK 7/10/2002 C.Fukunaga @ TGC electronics meeting in CERN

C.Fukunaga @ TGC electronics meeting in CERN Results 7/10/2002 C.Fukunaga @ TGC electronics meeting in CERN

C.Fukunaga @ TGC electronics meeting in CERN Name Bit RW   DEPTH 21 Depth of L1 Buffer TESTPULSE 5 Set delay of Test Pulse Trigger DELAY 4 Set delay of input SCHEME 1 Low : 3 out-of 4 , High : 4 out-of 4 L1VETO Low : through , High : L1A = 0 CLKINV Low : order , High : invert RESET Internal ECR & BCR DRDRST Derandomizer Reset DCVETO Low : DC balanced , High : Normal SEU RO SEU Flag MODULE 8 Indicate Module Type and Module Address OVERFLOW Indicate Derandomizer Overflow ID 32 ID=00100100000001001100000000000001 MASK1P 160 Mask Pattern for Readout and Matrix MASK1 Mask Enable for Readout and Matrix MASK2P Mask Pattern for Matrix only MASK2 Mask Enable for Matrix only TPP Test Pulse Pattern 7/10/2002 C.Fukunaga @ TGC electronics meeting in CERN

Summary for SLB ASIC version 2 Low-pT matrix part: Verification with 8000 patterns for each doublet/triplet and wire/strip. Readout part: PSC with new shift register scheme works fine, but we are still doing tests for this parts. Control part: All JTAG functions work fine. Mask and Test Pulse: Both work fine owing to new shift register structure. 7/10/2002 C.Fukunaga @ TGC electronics meeting in CERN