RAD Evolution Workshop Purpose of the RAD and evolutions to-date

Slides:



Advertisements
Similar presentations
Draft Concept of Operations (CONOPS) for CS#1- FAS Centralised service on Flight Plan and Airport Slot Consistency (FAS) Matthis Birenheide Project Manager.
Advertisements

Hans Koolen NMOC/CFMU Network Operations Services
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Network Management Operational Performance Enhancements Razvan BUCUROIU.
Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop September 2012.
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
ASM Dimension in Free Route Airspace Catalin Lepadatu EUROCONTROL DNM/COO/NOM/OPL Civil-Military Workshop September 2012.
Traffic Management and FUA integration
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Peter Matern Head of ADM Unit 30/01/2014
Continuous Climb Operations (CCO) Saulo Da Silva
ICAO Provisions for Safety Management
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
ATS Route and Waypoint Implementation:
Frank Brenner Director General, EUROCONTROL European ATM Israel Civil Aviation Conference, 18th November 2013.
Regional ATFM in Europe
Distributed Multi-Nodal ATFM Operational Trial
Flexible Use of Airspace and Collaborative Decision Making The aim of this presentation is to provide the aviation industry with the understanding of the.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Workshop on preparations for ANConf/12 − ASBU methodology
Congestion Management
Collaborative Decision Making (CDM) Saulo Da Silva
ATS Route and Waypoint Implementation:
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Žarko SIVČEV EUROCONTROL/CFMU Network Operations
SIP/2012/ASBU/Nairobi-WP/19
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Workshop on preparations for ANConf/12 − ASBU methodology
Introduction of TBO within OptiFrame
Mini Global Demonstration
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
Continuous Climb Operations (CCO) Saulo Da Silva
Ensuring a 'Flexible Use of Airspace'….
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
Airport-ANSP Growth & Efficiency ACDM-CATFM
Continuous Climb Operations (CCO) Saulo Da Silva
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
GFOI Plenary March 2018 Bogota, Colombia
Recommendations and Conclusions
Publication specialties and how to flight plan
Yearly Maintenance Process (for existing messages)
CFSP’s view on the current RAD
RAD in DFS – information for external stakeholders
SAS & RAD Jens Albek Operative Route Analyst
Workshop on preparations for ANConf/12 − ASBU methodology
Sharon Mahony Environment Unit
RAD Evolution Workshop Network Approach to the RAD - DP/4
Coordinate Operations Standard
AIM Global Strategy Air Navigation Procedures for AIM Seminar
SPECTRUM STRATEGY & VISION
Exit Capacity Substitution and Revision
Traffic Management and FUA integration
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
RAD Evolution Workshop RAD Purpose and evolutions to-date - IP/1
RAD Evolution Workshop Current RAD status
Balanced Approach to Noise Mitigation
RAD Evolution Workshop Current RAD status - DP/2
RAD Evolution Workshop
RAD Evolution Workshop Outcome
RAD Evolution Workshop
RAD Evolution Workshop Network approach to the RAD - DP/3
Airspace Volumes and Sectorisation Good Design Practice
Balanced Approach to Noise Mitigation
M. Steinfurth, I. Kuren, R. Lacatus, A. Paulov, V. Somosi
by Ranko Vuica and Željko Savić Croatia Control Ltd.
ROMATSA – SAFETY, EFFICIENCY AND ENVIRONMENTAL PERFORMANCE IN ATM
ICAO AFIS MANUAL UPDATE
Presentation transcript:

RAD Evolution Workshop Purpose of the RAD and evolutions to-date Beginning, Evolution, Management, Control RAD WS 12 - 13 DEC 2018, Brussels, Belgium Tihomir Todorov Head of Section Airspace Design 12 DEC 2018

before 1996 - mid 2012

Structural Airspace Restrictive Measures The initial aim was to communicate to AOs the ATC / ATFM and structural airspace restrictive measures imposed by States Before 1996 … Traffic Orientation Scheme (TOS) … Before 1996 … Contingency Routing Scheme…: 1999 - 2001 …. Standard Routing Scheme (SRS) Due to several non-operational crises in Europe the SRS was converted into Avoidance Routing Scheme (ARS)

History of the RAD The Beginning Route Availability Document (RAD) as from 2001 Discussions on RAD started somewhere in 1997 at CRS / TOS Meeting that originally defined the SRS Proposal tabled by AO organisation - tell us what you don’t want Austria - First to agree the concept followed by Germany Germany - First to adopt full RAD principle - SRS plus AIP route flow restrictions Two parts: Part 1 - State by State, Part 2 - Pan European February 2001 - Scandinavia added Proposals out to: UK, France for Paris, Reims and Brest (1 Annex) and Bordeaux, Turkey Transition starting 19th April 2001 and SRS was withdrawn End transition 5th October 2001 - All States compliant

Benefits and dis-benefits History of the RAD Benefits and dis-benefits Benefits Computer readable Electronic download into external computer systems Sole source data Single publication Single document versus AIPs All AIP route flow restrictions included (many currently checked) Pan European Automatic AO compliant routes Reduction/elimination of MANual queues No requirement by AO’s for route catalogue Review of AIP restrictions Route continuity check Publication discipline Dis-Benefits Interim complexity Interim management Route characteristics remain in AIP Expansion of the SRS area

History of the RAD Requirements From States Remove Route Flow restrictions from AIP Determine publication method Direct enquirers to EUROCONTROL website for RAD Maintain Annex together with EUROCONTROL Ensure timely updates (42 day AIRAC requirement) Review restrictions regularly for currency Facilitate cross-border compatibility of routing From EUROCONTROL Maintain RAD Ensure timely publication (42 days) Ensure smooth transition meets target dates Develop tools to validate RAD Review allocation of Annexes (post summer 2001) and renumber in alphabetical order Publish Part 2 of RAD - Winter 2001 (post transition) Ensure external users participate in development

RAD Structure - 2001 RAD Part 1 3 (three) Appendices: Appendix 1 - Introduction; Appendix 2 - Area Definition; Appendix 3 - City Pair Level Capping. 32 (thirty two) Annexes: Annex 1 - 30: States; Annex 31: NAT; Annex 32: Military Routes. RAD Part 2 Includes Annex 1 - 30 structured on ATS route alphabetical order

RAD Structure Evolution 2001 - 2012 RAD0312 - 27 NOV 2003 - Annexes renamed as National Annexes, Annex MIL and Annex NAT RAD0401 - 20 JAN 2004 - New Appendix 4 DCT Limits RAD0411 - 28 OCT 2004 - New Appendix 5 - SID/STAR RAD1003 - 11 MAR 2010 - New Appendix 6 - Inter ACC RAD1007 - 01 JUL 2010 - Annex MIL withdrawn and restrictions included in National Annexes RAD1206 - 31 MAY 2012 - New Annex Special Event - created for the purpose of EURO2012.

Beyond mid 2012

23/02/2019 ERNIP RAD PART 1 - The European Airspace Design Methodology Guidelines - General Principles and Technical Specification for Airspace Design Chapter 8 Route Network and Free Route Airspace utilisation rules and availability PART 4 - Route Availability Document (RAD) User Manual The 4th meeting of the Network Management Board (NMB) on 7th June 2012 approved the full ERNIP (5 documents) and the actions required to enhance airspace utilisation.

RAD Introduction The RAD is a common reference document containing the policies, procedures and description for route and traffic orientation. It also includes route network and free route airspace utilisation rules and availability. The RAD is also an Air Traffic Flow and Capacity Management (ATFCM) tool that is designed as a sole-source flight-planning document, which integrates both structural and ATFCM requirements, geographically and vertically.

RAD Basic Principles The objective of the RAD is to facilitate flight planning. The RAD enables States/FABs/ANSPs to maximise capacity and reduce complexity. The RAD should also assist the Network Manager in identifying and providing rerouting options The content of the RAD shall be agreed between the Network Manager and the Operational Stakeholders through an appropriate Cooperative Decision Making (CDM) process. The RAD is subject to continuous review by the Network Manager and the Operational Stakeholders to ensure that the requirements are still. The RAD is updated each AIRAC cycle following a structured standard. The RAD is only applicable to the IFR part of the Flight Plan. The NM is responsible for preparing of a common RAD reference document, collating, coordinating, validating and publishing it.

RAD Restriction A restriction normally shall not qualify for inclusion in the RAD unless it has a FLOW ELEMENT and/or TIME AVAILABILITY / RESTRICTION APPLICABILITY attached to it. A FLOW ELEMENT is defined as affecting either: Departures from an Airfield / Group / Area; Arrivals to an Airfield / Group / Area; Traffic flying between Airfield / Group / Area; Overflying traffic.

RAD Restriction Structure Each restriction is hierarchical and specific and has been arranged to facilitate parsing of the information into computer systems. For the usage of the restricted object (significant point, ATS route segment, defined DCT, airspace volume (ATC Unit, AoR of relevant ATC Unit - CTA/UTA, TMA, CTR or individual control sector/s within an ATC unit, etc.)) there are 3 (three) main types of restrictions: Not available for … Flight planning via restricted object is forbidden for described flow(s). Only available for … Flight planning via restricted object is allowed exclusively for described flow(s). Compulsory for … Flight planning via restricted object is the only valid option for described flow(s). For the combination of elements that define the flow of traffic, there are 2 (two) types of restrictions - inclusive and exclusive: INCLUSIVE restriction - traffic must meet ALL of the conditions to be subject to the restriction. The implicit logical operator between the listed conditions is an “AND” - Logical Conjunction. EXCLUSIVE restriction - traffic only needs to meet ONE of the numbered sub-conditions to be subject to the restriction. The implicit logical operator between the numbered conditions is an “OR” - Logical Disjunction.

RAD Restriction Identification Restrictions shall be uniquely identified by a 6 digit alpha/numeric identifier which comprises the ICAO nationality letters for location indicators assigned to the State of origin or 2 letter Regional / FAB naming convention prefix code, together with a 4 digit number (LF2016, DU2001, RE2001). Exception from above rules is allowed for DCT identification in Appendix 4 where a maximum 9 digit alpha/numeric identifier containing 5 digit number might be used (LF50001, DU52345, RE54999, DSYX50000) and FUA restrictions in Appendix 7. The FUA restrictions shall be identified as follows: Restricted Airspaces Identifier (RSA ID) as published in State AIP followed by 1 letter R, S, T, U, V, W, X, Y (LBTSA11R); or Restricted Airspaces Identifier (RSA ID) as published in State AIP followed by 1 letter Z indicating FBZ existence followed by 1 letter R, S, T, U, V, W, X, Y (LBTSA11ZR).

RAD Period of Validity The routeing organisation is permanently effective and applies daily H24, except where otherwise specified. When it can be identified that capacity is surplus to demand the RAD restrictions may be relaxed from the H24 time constraints. The RAD may be suspended, or temporarily relaxed, in cases where it has an abnormally adverse impact upon the traffic flows. This action will always be co-ordinated through the CDM process between the Network Manager and its Operational Stakeholders.

RAD Tactical Operations The Network Manager in conjunction with the FMPs will monitor the actual situation during the day of operation to ensure the RAD is achieving the balance of traffic required. If, due to a major unexpected event, there is a significant disturbance to traffic patterns, after co-ordination with the relevant parties (FMPs and AO’s), the Network Manager may suspend part of the RAD and provide alternative routeings.

RAD Structure - 2018 7 (six) Appendices: Appendix 1 - General Description; Appendix 2 - Area Definition; Appendix 3 - Flight Level Capping limits; Appendix 4 - En-route DCT limits; Appendix 5 - Airport connectivity; Appendix 6 - Flight Profile Restrictions; Appendix 7 - FUA Restrictions (as from RAD1404 - 3 APR 2014). Network wide Pan-European Annex Annex for special events, if necessary (restrictions of temporary nature for European Sport Events, World Sport Events, Olympic Games, Large scale Military exercises, Economic forums, etc.

RAD Management

RAD Control and Management The NM RAD Team is responsible for the maintenance and publication of the RAD; this is coordinated through liaison with the National RAD Coordinators (NRCs) on an AIRAC cycle basis. Development of the RAD is through the RAD Management Group (RMG) established to monitor the evolution of the RAD; the NRCs are contacted if and when necessary on matters of procedure. The NM RAD Team shall refuse and/or remove any RAD requirement, if not properly co-ordinated until the coordination process is completed; this might include as an example request for a cross-border restriction/s not properly coordinated with the neighbouring State / FAB / ANSP or restriction that following the internal NM RAD validation (or in an impact assessment) is in conflict with another one (often in another State / FAB / ANSP) The final content of any amendment to the RAD shall be positively agreed between the NM RAD Team and State concerned.

RAD Publication Coordination The RAD is created in accordance with ICAO publication procedures and is published 28 days prior to the relevant AIRAC cycle. “Last minute” changes are changes required due to exceptional circumstances and/or only when they have a significant impact on operational requirements. They are promulgated on the NM NOP portal via the “Increment File”. The RAD including the “Increment File” are published via EUROCONTROL NM NOP website as xls files and via B2B. Cycle Ident RAD Cut-Off (D -56) Publication (D -28) AIRAC 1 1801 09 NOV 17 07 DEC 17 04 JAN 18 2 1802 01 FEB 18 3 1803 01 MAR 18 4 1804 29 MAR 18 5 1805 26 APR 18 6 1806 24 MAY 18 7 1807 21 JUN 18 8 1808 19 JUL 18 9 1809 16 AUG 18 10 1810 13 SEP 18 11 1811 11 OCT 18 12 1812 08 NOV 18 13 1813 06 DEC 18 DAY PROCESS ACTION D-63 Notification to States "One week to Cut-off". EUROCONTROL NM D-56 Finalisation of States requirements. States / FABs / ANSPs Cut-off date. States provide amendments to NM. Three weeks to compile the RAD and to resolve errors/conflicts. D-28 Publication. Two weeks to assess impact of new restrictions. D-14 Results of impact assessment of new restrictions. Changes/amendments to be promulgated via the “Increment File” on the NOP Portal. D-10 Freeze of ENVironment tape for AIRAC.