Testbeam analysis on module #1

Slides:



Advertisements
Similar presentations
Status of DHCAL Slice Test Data Analysis Lei Xia ANL-HEP All results preliminary.
Advertisements

Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
2 Introduction   MiniCal test-beam studies started at the beginning of March (till March 6 we only had 17 APD’s, then 33 APD’s)   A few days were.
Adil Khan Kyungpook National university Korea-Japan Joint ScECAL Group Meeting kobe University Japan 3 rd September 2010.
AHCAL Saturation Study CALICE week – Casablanca, Morocco 2010/09/22 Jaroslav Zalesak Institute of Physics, Prague / DESY Study of single SiPM response.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
Calibration issues for the CALICE 1m 3 AHCAL LCWS11 - International Workshop on Future Linear Colliders Granada, Spain 2011/9/28 Jaroslav Zalesak Institute.
K1.8 meeting Report from E05 group Toshiyuki Gogami 26 Dec 2014.
Status of scintillator KLM study P. Pakhlov (ITEP)
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
Update on Material Studies - Progress on Linearity using calib-hits (very brief) - Revisiting the material problem: - a number of alternative scenarios.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
G4 Validation meeting (5/11/2003) S.VIRET LPSC Grenoble Photon testbeam Data/G4 comparison  Motivation  Testbeam setup & simulation  Analysis & results.
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Min-DHCAL: Measurements with Pions Benjamin Freund and José Repond Argonne National Laboratory CALICE Collaboration Meeting Max-Planck-Institute, Munich.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Calibration issues for the CALICE 1m3 AHCAL ALCPG11 - Linear Collider Workshop of the Americas Eugene, Oregon, USA 2011/3/22 Jaroslav Zalesak Institute.
CALO Meeting–September 2 nd 2015 Calorimeter Upgrade Electronics: June 2015 Test Beam E. Picatoste Universitat de Barcelona, Institut de Ciències del Cosmos.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
G. Eigen, Paris, Introduction The SiPM response is non-linear and depends on operating voltage (V-V bd ) and temperature  SiPMs need monitoring.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
Testbeam analysis Lesya Shchutska. 2 beam telescope ECAL trigger  Prototype: short bars (3×7.35×114 mm 3 ), W absorber, 21 layer, 18 X 0  Readout: Signal.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
DESY BT analysis - updates - S. Uozumi Dec-12 th 2011 ScECAL meeting.
Scintillator HCAL prototype commissioning and calibration J.Cvach Institute of Physics AS CR, Prague Calibration basics Test results Outlook LCWS 06.
1 CALICE Tail-Catcher Muon-Tracker(TCMT) Preliminary Test Beam Results Kurt Francis NICADD/Northern Illinois University For CALICE Collaboration ALCPG.
or getting rid of the give-away particles in a test-beam environment
SiPM linearization status update
Analysis of LumiCal data from the 2010 testbeam
PreShower Characterisations
LED notched fibre system short HBU0 party with QMB6
Scintillation Detectors in High Energy Physics
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Preparation for CERN test beam
CALICE scintillator HCAL
CMS ECAL Calibration and Test Beam Results
ScECAL+AHCAL+TCMT Combined Beam FNAL
Installation and Run Plan
E. Garutti - Main Meeting
Scintillator HCal Prototype
The MPPC Study for the GLD Calorimeter Readout
Presentation transcript:

Testbeam analysis on module #1 Lightyield calibration 2. Absorber studies 19/01/06 HCAL main meeting - Marius Groll

History of module #1 and setup features First produced module: suffered under debugging SiPMs: #35 -502 2MW quenching resistor bias voltage: 63 - 67 V ~ 60 long discharge candidates (30 with low frequency) Light coupling: prototype, no „reflector caps“ Use final VFE electronics (better protected DAC settings)  no unforced losses of DAC values (single user mode) No electronic temperature measurement No CMB: only stand-alone LED wo PIN readout 19/01/06 HCAL main meeting - Marius Groll

DESY test beam: 1st module test e-/e+ beam: 1-6 GeV VME crate very FE electronics beam trigger ~150 ns HCAL Module 1 NIM trigger logic 19/01/06 HCAL main meeting - Marius Groll

Calibration procedure SiPM Gain calibration with low intensity LED light MIP calibration of each tile with 3 GeV e- beam 0 pixel 1 pixel 2 pixels Noise spectrum Minimum ionizing energy gain / noise ~ 4 using ASIC chip in 2 modes: “calibration mode” “physics mode” short shaping time (40ns) longest shaping time (180 ns) highest gain medium gain 19/01/06 HCAL main meeting - Marius Groll

Uncertainty estimation Pedestal shift: mean value stable s = 5 ch (MIP ~ 250 ch)  no pedestal correction during data taking  use as systematic error Temperature corrections: big LED fluctuations: 25% NO Pin correction possible!  analog temperature measurement available: temperature in hall 2: 20 -22 °C  1°C = 3 s error on the meas. SiPM amplitude: 7% / 1 °C  2.5% temperature variation uncertainty Pedestal change in one week 176 19/01/06 HCAL main meeting - Marius Groll

LY calibration on module #1 197 ch. MIP average: 410 ADC ch +/- 18% Gain calibration MIP calibration Intercalibration Beam (sept. 05) LY: 13 pix/MIP, RMS 2 pix/MIP Tile tester (dec. 04) LY: 15 pix/MIP, RMS 2 pix/MIP Error on LY: 13.0 ± 0.3 ± 0.7 pix/MIP stat. syst.  D 1 pix/MIP due to temp. 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll Bug report Reasons for failed calibration: MIP fit failed: 19 channels Gain fit failed: 11 channels (Intercalibration failed: 16 channels  use Chip mean) in total: for 25 channels no LY calibration possible (out of which 5 dead channels) 19/01/06 HCAL main meeting - Marius Groll

Absorber studies on module #1 HCAL module 5x5 cm scintillator 1 X0 lead 3x3 cm scintillator with Hammatsu R5505 e+ 1-6 GeV Lead: RM = 0.9 cm X0 = 0.56 cm PMT1 PMT2 PMT3 Peter Smirnov and Yuri Soloviev Data has been taken in one week at the end of september Energy scan (e+ 2-6 GeV) PMT calibration wo absorber 1X0 shower data collected with 3 GeV beam  many entries at 1-3 MIPS  better determination of the lower part of the SiPM response function 5X0 shower data collected with 5 GeV beam  high amplitude (~30 MIPS)  SiPM non-linearity correction 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll MIP calibration and MC MIP calibration of PMTs Pedestal stable at the 1% level SiPM MIP calibration taken from runs before and after MC: standalone Geant3 with beam smearing: s beam = 1.5mm data before module PMT2 MC: s/mean = 0.08 Data: s/mean = 0.16  Good PMT resolution data after module PMT3 MC before module 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll PMT calibration and MC Leakage check with 5 X0 & MC comparison PMT2 & PMT3: non-linear behaviour at 5-6 GeV  ok Possible explanation: PMT2: leakage to the side (3x3cm2); checked with bigger 9x9cm2 scintillator SiPM data correction will follow! 19/01/06 HCAL main meeting - Marius Groll

Monte Carlo understanding MC work done by Y. Soloviev Geant 3 code Nice agreement in the PMTs  MC ok Disagreement for our module if no corrections are applied  non-linearity… Be aware! Shower fluctuation does not decrease with statistics. Approx. 30% energy spread 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll 1X0 analysis MC: PMT2: 5.9 MIPs SiPM: 6.5 MIPs SSIPM: 7.4 MIPS PMT3: 4.8 MIPs Data: chip 5 chan 13 PMT2: 6.2 MIPs SiPM: 6.8 MIPs SSIPM: 7.8 MIPs PMT3: 5.0 MIPs 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll 1X0 analysis But of course you have to do something before: ½ MIP cut  cut away SiPM noise Non-linearity correction Light xtalk correction  2.5% in agreement with ITEP meas. Long discharge handling PMT2 SIPM SSiPM PMT3 MC 5.9 6.5 7.4 4.8 >½ MIP cut 6.2 6.3 7.9 5.0 Linearity correction 6.8 8.5 Light xtalk correction 7.8 Long discharge w or w/o 2% difference in SSiPM  For 100000 events it seems to be not important 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll PMT2: plot explanation The following plots are done by dividing the data/MC into subsamples, which are determined by the numbers of MIP the PMT2 has seen 19/01/06 HCAL main meeting - Marius Groll

1X0 analysis: data MC comparison 19/01/06 HCAL main meeting - Marius Groll

1X0 analysis: data MC comparison SiPM central: wo linearity correction SiPM neighbours: wo xtalk correction 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll Summary: 1X0 analysis For 25 3x3 cm tiles: General agreement to MC only 5% spread between channels w/o any temperature & pedestals corrections Some physics: determination of lead moliere radius data: RM = 0.76 ± 0.07 cm MC: RM = 0.92 cm MC prediction 19/01/06 HCAL main meeting - Marius Groll

SiPM non-linearity correction Vassilly Morgunov correction proposal: comparison to Hendriks measurement in lab. correction maintained by LED measurements is too small; even after SiPM x-talk correction  open question 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll 5X0 @ 5 GeV analysis Electromagnetic shower maximum MC: PMT2: 30.3 MIPs SiPM: 25.9 MIPs SSIPM: 37.4 MIPS PMT3: 11.4 MIPs wo correction Data: chip 5 chan 9 PMT2: 30.0 MIPs SiPM: 20.7 MIPs SiPM_corrected: 26.2 MIPs SSiPM: 36.4 MIPs SSiPM_corrected: 39.9 MIPs PMT3: 10.9 MIPs w correction 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll 5X0 @ 5 GeV analysis Central tile/SiPM uncorrected Central tile/SiPM corrected 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll 5X0 analysis PMT2 SIPM SSiPM PMT3 MC 30.3 25.9 37.4 11.4 >½ MIP cut 30.0 20.7 36.4 10.9 Linearity correction 26.2 42.5 Light xtalk correction 39.9 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll MiniCal comparison SIPM SSiPM MiniCal 1X0 steal 3 GeV 7.4 8.1 Module 1 1X0 lead 3 GeV 6.8 7.8 MiniCal 5X0 steal 5 GeV 28.0 31.0 Module 1 5X0 lead 5 GeV 26.2 39.9 not completly possible to compare due to the different geometry: MiniCal: 5x5 cm tiles Module 1: 3x3 cm tiles  missing energy in MiniCal due to lateral leakage at the shower maximum  MC crosscheck is needed 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll Summary We have collected first beam data with our detector! We have learned a lot how to operate it and to collect data with the DAQ BUT: Next time minimisation of blind data taking time The importance of a good monitoring system is tremendous! Alternating data taking: data – led monitoring – pedestal is mandatory! Better knowledge of SiPM saturation curve with our electronics is needed Data correction procedure for SiPM non-linearity has to be improved 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll Backup 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll error bars = error on mean error bars = RMS 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll 5X0 analysis Analysis needs input for the correct SiPM response function correction MiniCal correction is doing for the first approximation a good job wo correction w correction 19/01/06 HCAL main meeting - Marius Groll

HCAL main meeting - Marius Groll 1X0 vs. noise black: shower red: noise 1X0 data have in the neighbouring tiles hit amplitudes comparable to noise hits 19/01/06 HCAL main meeting - Marius Groll