Guidance on the New 10CFR50.59 Rule

Slides:



Advertisements
Similar presentations
Course Material Overview of Process Safety Compliance with Standards
Advertisements

Configuration Management
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Safety Software QA at BNL’s Collider-Accelerator Department (C-AD) Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
2007 CMBG Conference Temporary Configuration Changes Tony Hathcock Duke Energy - Oconee June 18-20, 2007 Charleston, SC.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Temporary Configuration Change Mike Hayes Exelon Nuclear.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Environmental Management Systems An Overview With Practical Applications.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Informed Consent and HIPAA Tim Noe Coordinating Center.
Configuration Management
Project Execution.
Session 6: Data Integrity and Inspection of e-Clinical Computerized Systems May 15, 2011 | Beijing, China Kim Nitahara Principal Consultant and CEO META.
Configuration Management for Transportation Management Systems Establishing and Maintaining System Integrity.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Software Quality Assurance Implementation Plan June 15, 2004 Defense Nuclear Facilities Safety Board Chip Lagdon Director Office of Quality Assurance Programs.
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
1313 CHAPTER SYSTEMS ANALYSIS AND DESIGN. © 2005 The McGraw-Hill Companies, Inc. All Rights Reserved Competencies Describe the six phases of the.
Standards and Standardization. Standard Levels Standards preside according to the level. Their effect, image and their scope of work change from one level.
System Planning- Preliminary investigation
Company duties under the ISM Code
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
2006 CMBG Conference Sam Melton Supervisor, Configuration Management Brunswick Nuclear Plant Progress Energy June 11-14, 2006 Richmond, VA CM04 Facility.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
ISM at the Savannah River Site
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
2010 CMBG Conference Temporary Design Changes Tony Hathcock Duke Energy - Oconee June , 2010 Charlotte, NC.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
Standard Design Process Overview
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
Planning for Succession
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Configuration Management
NEI Configuration Control Benchmarking – Sequoyah
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
DESIGN BASIS INTEGRATION
Configuration Management
NEI Configuration Control Benchmark – Palo Verde
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
Configuration Management Benchmarking Group (www. cmbg
CMMI – Staged Representation
Raytheon Parts Management
Managing Design and License Basis Info
How to Manage Guidance from Multiple Organizations into CM
Emulsion Task Force Meeting
Controlling Project Cost and Schedule
Temporary Alterations in Support of Maintenance and Temporary Modifications Beth Kernes Krause - Cooper Station February 24, 2019 Cleveland 2005.
Break Out 7: Operation & Maintenance Interfaces
TRTR Briefing September 2013
What Is VQIP? FDA required to establish a program to provide for the expedited review of food imported by voluntary participants. Eligibility is limited.
Software Reviews.
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Guidance on the New 10CFR50.59 Rule Presented By: Sam Melton, Progress Energy 8th Configuration Management Benchmarking Conference October 29 – 31, 2001 Raleigh, NC

Problem Statement The change in the 50.59 rule has the potential to allow bypassing an Engineering design impact review for procedure changes and for temporary alterations for Maintenance where previously the 50.59 requirement drove an Engineering review.  The definition of what is or is not a Temp Mod has become more important and more difficult to define.

Contributors      Lack of well-defined boundaries for areas where Maintenance can work without Engineering approval We haven’t built the design impact review for some change processes outside the mod process. Maintenance and Operations training does not prepare them to make decisions in light of the design bases requirements, 50.59 process, and control of temporary design changes. Procedure Qualified Reviewers lack training on verifying technical adequacy.

Solution Training: Maintenance and Operations get 50.59 training, possibly “short form”. Training: Maintenance needs System Functional Training. Training: Procedure Reviewer needs training on design impact review and affected facility configuration information review. Establish boundary guidelines that trigger design impact review for typical temporary changes. Examples are pre-engineered scaffolding, shielding, and rigging configurations that are well-bounded. Flowchart for temporary change determination (to control trouble shooting, work requests, maintenance under procedures). CP&L has one.

Solution (cont.) Assess how effective my technical review program for assuring technical adequacy and preservation of the design basis. Are the right people involved? Assess a sampling of Maintenance Work Requests and Procedure Changes to determine if they meet the temporary change determination flow chart. Assess change authorization processes to ensure adequate design review is required. Establish a single design impact review procedure that change authorization processes can point to. Proceduralize NEI 96-07; develop an electronic procedure hyper-linked to the NEI 96-07 guidelines and FAQs

Summary 10CFR50.59 Rule change has had minimal impact on Configuration Management. The potential loss of engineering review because a 10CFR50.59 is not required is a concern which must be addressed. Classification of temporary changes and determination of Temporary Modification applicability is of greater concern and the question comes to Configuration Management.