ET 494: Senior Design II Completion of the Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward Rode
Overview Objective: Design - AutoCAD Estimate - Microsoft Excel Analyze - Primavera
Site Location 20368 E. Highway 190 Hammond, La. 70401 2.63 acres of cleared land Priced at $399,900 Ideal location Multi-family Homes Highway 190
Site Location Aerial View
Elevation Point 1 – 33.2 ft Point 2 – 35.0 ft Point 3 – 36.4 ft Base Flood – N/A Finished Elevation – 36 ft
Ground Work Existing ground only Leveled to a height above flood zone Slope away from building
Building Codes Hammond Zoning Ordinance booklet. Part 1: Principles and Objectives Part 3: Schedule of District Regulations Adopted Part 5: Off-Street Parking and Loading Requirements
Fire Codes NFPA 101: Life Safety Code booklet 1994. Chapter 26: New Building Occupancies Section 26-1 - General Requirements Section 26-2 – Means of Egress Requirements Section 26-3 – Protection
L.E.E.D. Look into L.E.E.D. improvements for our building.
Working Drawings Base Floorplan Electrical Plan Foundation Plan With Details Ceiling Plan Final Elevation Site Plat Plan
Floor Plan
Any Questions?