CCIMM/JCIMS Audit Readiness

Slides:



Advertisements
Similar presentations
2012 Navy Medicine Audit Readiness Training Symposium
Advertisements

1 Contract Inactivation & Replacement Fly-in Action ( Continue to Page Down/Click on each page…) Electronic Document Access (EDA)
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Service Provider Support of Audit Readiness Office of the Under Secretary of Defense (Comptroller) March 14, 2011.
SPS FPDS-NG Integration: Functional User
Financial Improvement and Audit Readiness (FIAR) Office of the Under Secretary of Defense (Comptroller) Inventory and OM&S Audit Readiness Status October.
1 State of Connecticut Core-CT Project Projects/Contracts Subject Matter Expert (SME) Kickoff March 7, 2007.
Financial Improvement and Audit Readiness (FIAR)
I NSPECTOR G ENERAL U.S. Department of Defense INTEGRITY  EFFICIENCY  ACCOUNTABILITY  EXCELLENCE 2014 INSPECTOR GENERAL MARINE CORPS TRAINING SYMPOSIUM.
Document Management Proposed Scanning Solution September 22nd 2008.
SOFTWARE PRESENTATION ODMS (OPEN SOURCE DOCUMENT MANAGEMENT SYSTEM)
 Every stage from phase DESIGN in Software Development Process will have “design document” especially in analysis and design phases.  “Design document”
1-1 Create and Enforce Sell-Side Contracts with Oracle Sales Contracts.
LEARN. NETWORK. DISCOVER. | #QADexplore Implementing Business Process Management: Steps to Success WCUG – November 18, 2014.
Proposal to Implement a HSE Letter of Assurance Process for Contractors from 1 January 2010 “Must Win” Project: Contractor HSE.
® VisualPlex Exchange Project Definition Phase June 23, 2000 Prepared James M. Dutcher Oracle Consulting Services.
Proposal to Implement a HSE Letter of Assurance Process
S/W Project Management
Transforming Army Management of Individual Chemical Protective Equipment Mobility Inventory Control and Accountability System Used in Individual Protective.
SDLC Project: Alibi—Custom Clothes PLAN ANALYZE DESIGN DEVELOP TEST IMPLEMENT MAINTAIN Ahmed Balogun Kasey Bennett Bryan Borcher.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Service Transition & Planning Service Validation & Testing
Relationships July 9, Producers and Consumers SERI - Relationships Session 1.
SacProNet An Overview of Project Management Techniques.
Slide 1 Internal Controls 101 June 23, Slide 2 Introductions Tim Waterman – General Dynamics Advanced Information Systems (GDAIS) Keith Rivers –
Financial Reporting (Overview & EFIS Users). 2 General Reporting Requirements  Reporting requirements are outlined in the 2011/12 Child Care Business.
Okalo Daniel Ikhena Dr. V. Z. Këpuska December 7, 2007.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
State of Georgia Release Management Training
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
Marine Stewardship Council MSC Online Transaction Solution (MOTs) Pilot Background Information | June 2015.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
CMMI for Services, Version 1.3 Speaker: Business Excellence Date:
PRODUCTION/ DEPLOYMENT
Procurement Development Programs
Title of presentation Name(s) of author / presenter / co-authors
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
DoD Template for Application of TLCSM and PBL
Module 1 - BASICS AND NAVIGATION/SEARCH
Contract Management in electrical engineering
Software Configuration Management
BEA 10.0 CCB Architecture Artifact Approval Brief Acquisition
Module 1 Configuration Status Accounting (CSA)
Software Configuration Management
Project Management Processes
TechStambha PMP Certification Training
SPS FPDS-NG Integration: Functional User
Readiness and Test Approach
Microsoft 365 powered device offers Execution Guidance
Performance Management Workday Module
Enterprise Content Management Owners Representative Contract Approval
Change Control Module P5 LEARNING OBJECTIVES: LEARNING OUTCOMES
Performance Process STEP PROCESS GUIDELINE DATES ACTION
Guidance notes for Project Manager
ECF Enhancements Programme
IS&T Project Reviews September 9, 2004.
Financial Management Modernization Program
Amendment Invoice Task Force Progress Report
Project Management Processes
Registration and Role Request for DAAs
Configuration Management
Enterprise Content Management (ECM) Project
Executive Project Kickoff
Software Reviews.
Ms. Kristyn E. Jones Director, Financial Information Management
DSC ChMC Switching Programme Update 10th July 2019
HOME AFFAIRS IDENTIFICATION SYSTEM (hanis)
Presentation transcript:

CCIMM/JCIMS Audit Readiness In-Progress Review 28 April 2017 Enter the project name Enter the Project Manager name Enter the date of the meeting Switch master slide background info/format to the approved standard for briefings (remove SPI logo, and PAL Template info etc..) U.S. Army Human Resources Command , Fort Knox, KY

Agenda Purpose Background BLUF CCIMM JCIMS Milestones Questions/Discussion

Purpose Provide USACC stakeholders a status on CCIMM/JCIMS Audit Readiness solution.

Background During 2010-2012, GAO conducted audit reviews on DoD financial systems. The Army received an unqualified rating. SecDef tasked the Army to achieve full financial statement audit readiness by 2017. The desired outcome is to provide USACC capability to upload, store and retrieve financial records from all USACC locations.

Upload and Store Financial Documents BLUF Upload and Store Financial Documents Includes both CCIMM and JCIMS CCIMM has five document categories JCIMS has three document categories Development completed Production fielding on 15 September 2017 Search and Retrieve Financial Documents CCIMM only Currently in requirements elicitation and validation Development will commence immediately upon establishment of requirements baseline

Upload and Store Financial Documents Identified and defined requirements for document categories and types Identified and defined document attributes required to allow for accurate and efficient retrieval Created user interface to enter the required data and perform upload Implemented “handshake” with document repository (Documentum) using EES v2 services

CCIMM

JCIMS

Critical Path Tasks Initial plan was to deploy in two phases. CCIMM 2.11.01 will not impact CST (v2.10) or Branching (v2.12) releases. Critical Path Tasks 29 September – AAR/Project Complete 15 September – Product FIelding 14 September – User Decision Meeting (UDM) TBD – EUT Search and Retrieve 1 August – Test Readiness Review (TRR) TBD – EUT Upload and Store 1 June – Design Review #2 28 April - Upload and Store Development Complete 22 December 16 – Design Review #1

Questions/Discussion

BACKUP

Audit Readiness Application Development CCIMM RRT #3323, JCIMS RRT #3371: Upload and store financial documents Documents identified as belonging to 5 categories (Supply, Delegation of Authority, Gov’t Purchase Card, Contract and Gov’t Unit Travel Cards) Scanned documents to be uploaded within the 5 Document Categories from CCIMM and within 3 Document Categories from JCIMS (Supply, DoA, GPC) Establish asynchronous handshake with Documentum using EES v2 – to send the metadata and receive confirmation that document has been stored within Documentum

Cybersecurity JCIMS CCIMM Fortify scans in Development and Test Mitigate/justify all findings prior to fielding CCIMM Code Peer review against CCIMM established standards