Production Status 39 modules produced

Slides:



Advertisements
Similar presentations
Electrical and thermal testing at Glasgow and Liverpool.
Advertisements

Z x 725 Sensor Mark 140 x Sensor Coordinates Bump Bond Pad Ø = 12/ FE PAD#2 110 x 210 LM Structure FE Chip Coordinates Bump.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
1 Module produced with low R int sensors-Anthony AffolderSensor Meeting, Feb 11, 2004 Modules Produced With Low R int Sensors Anthony Affolder UCSB.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 CMN Problem Review-Anthony AffolderTPO, December 11, 2003 Review of CMN Problem/Studies Ariella requested me to review the current understanding of the.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
Noise study 6/May/’13 Kazuki Motohashi - Tokyo Tech.
IC Controls Quality Water Solutions for pH pH / ORP Conductivity Dissolved Oxygen Chlorine Standards R1.0 © 2004 IC CONTROLS Concerns.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Scan of piezo drive trigger delay For this timing scan, we picked an amplitude of 7.5V (a little more than required to give minimum rms vibration as identified.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Module Bench Tests CMS Pixel Upgrade Workshop, Aug, 2012 University of Puerto Rico – Mayaguez Alejandro Carlo Joseph Cordero Angel López University of.
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
Noise in Cell 12-An example of a calorimeter measurement Simple procedures reduce measurement noise drastically Isolate the probe from the cryostat ground.
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
Electronics status September 2017
Success is when preparation meets opportunity
FPGA.
Maki KUROSAWA VTX Group 2014 Feb 20
APV Lectures APV FE Basic Building Blocks How Our Testing Works
Robert Gomez-Reino Garrido
Update of US Testing Status
APV Lectures APV FE Basic Building Blocks How Our Testing Works
Review of CMN Problem/Studies
UCSB Short-term Testing Plan
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
Recent TOB Developments
Module Failures on RODs
FNAL Module Testing Status
On behalf of the US TOB testing group
Discoloration of Passitivation
UCSB Short-term Testing Plan
The measurement set-up
What we learned today Made test bonds on Al plate using bonding parameters of channel and bias bonds Inspected 10 bonds of each type None of them showed.
Damage under UCSB bias bonds
Noise in TOB modules and sensor quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
Hybrid & Module Electrical Testing
Hybrid Status/Deliveries
Sensor probing (Summary)
First UCSB TEC Module (Pictures)
Summary of Key Results from the SLAC ESTB
Passitivation Location
Modules Produced With Low Rint Sensors
Encapsulation Studies
Noise in TOB modules and sensor quality
FNAL Hybrid Testing Status
Is Increased Bias Current and CMN Correlated?
Full list of devices of May09
Hybrid & Module Testing Status
Recent TOB Developments
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
FNAL Hybrid Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Status of the laser test setup and test beam news
Status of Hamamatsu Silicon Sensors
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
Presentation transcript:

Production Status 39 modules produced 28 of which have been tested at both 250 & 550 V Of those 28 modules, 10 modules have entire chips with >2x regular noise All have a larger bias current than expected from sensor probing The four modules that have been visually scanned have no obvious sensor damage. To reduce the noise of chip to normal values, 9-15 wire bonds have to be removed. 666

Module 869 Module 869 Modules with as little as 2 mA extra bias current relative to sensor probing data have exhibited extremely large noise. Module 869 shows increased noise on first chip at ~425 V. Other chips have had increasing noise starting at 100-450 V.

Noise Vs. Voltage ~1-2 channels per module have increasing noise with bias voltage In most cases, sensor flaws can be seen optically We are concerned that these channels may be less extreme examples of same problem It is NOT clear how these modules will change with time, radiation damage, and temperature.