APE Update Nate Lipkowitz 9/13/2011.

Slides:



Advertisements
Similar presentations
22-23/06/20093 rd Libera Users Meeting, ESRF1 3 years of experience of Libera BPMs at SOLEIL Nicolas HUBERT Synchrotron SOLEIL On behalf of Diagnostics.
Advertisements

Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
Beam Based Survey and Alignment of Ring Magnets David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik.
November 12, 2008 Controls Software D. Fairley LCLS Feedback.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Direct Wakefield measurement of CLIC accelerating structure in FACET Hao Zha, Andrea Latina, Alexej Grudiev (CERN) 28-Jan
CLIC programme at FACET Update on CERN-BBA A. Latina, J. Pfingstner, G. De Michele, D. Schulte (CERN) E. Adli (Univ. of Oslo), J. Resta Lopez (IFIC) In.
Tests of Dispersion-Free Steering at FACET (CERN-BBA) A. Latina, J. Pfingstner, D. Schulte (CERN) E. Adli (Univ. of Oslo/SLAC) In collaboration with: F.J.
FACET Machine Performance and Expectations M. Sullivan for the FACET Accelerator group SAREC Review July 25, 2013.
Beam Tests of DFS & WFS at FACET Andrea Latina, J. Pfingstner, D. Schulte, D. Pellegrini (CERN), E. Adli (Univ. of Oslo) With the help of F.J. Decker,
ILC Start-End Simulations Glen White, SLAC May 13, 2014 AWLC14, Fermilab.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Michael Borland Advanced Photon Source Using SDDS for Accelerator Commissioning and Operation Michael Borland Operations Analysis Group Advanced Photon.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
1 Henrik Loos 1 13 Sep 2011 APE Meeting Recent Activities H. Loos 09/13/2011.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
1 P. Chu 1 Adapting XAL for LCLS EPICS Meeting, Vancouver Adapting XAL for LCLS Paul Chu - SLAC May 1, 2009.
SASE optimization with OCELOT Sergey Tomin other co-workers: I. Agapov, G. Geloni, I. Zagorodnov.
… Work in progress at CTF3 … Davide Gamba 01 July 2013 Study and Implementation of L INEAR F EEDBACK T OOLS for machine study and operation.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
FEL Simulations: Undulator Modeling Sven Reiche Start-end Workshop DESY-Zeuthen 08/20/03.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Tools in CTF3 Simona Bettoni for the CTF3 operation team.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Direct Wakefield measurement of CLIC accelerating structure in FACET Hao Zha, Andrea Latina, Alexej Grudiev (CERN) 18/06/2015 High Gradient work shop 2015.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
LCLS MD Downtime William Colocho June 2014 to June 2016.
Overview Preparatory work at the MML BBA to define the reference orbit
LCLS Commissioning & Operations High Level Software
FACET Tests Update A. Latina, J. Pfingstner, D. Schulte,
Weiming Guo Accelerator Physics Group / ASD Advanced Photon Source
A monitoring system for the beam-based feedbacks in the LHC
Linear optics from closed orbits (LOCO)
Coupling Correction at the Australian Synchrotron
LCLS-II Lattice 26FEB16: updates in the areas from bypass to dump
Accelerator Physics and Engineering Update Jan 6, 2010
HXRSS operation experiences at LCLS
LCLS Commissioning & Operations High Level Software
Work Update J. Rzepiela 8/17/10.
Phase II Commissioning
Non-user time 2/7 of total
Data Mining Ideas.
Phase Adjustments: K vs
Machine Studies/Software Update
G. Marcus, Y. Ding, J. Qiang 02/06/2017
Status and experience of Liberas at Soleil
Beam-Based Alignment Results
Accelerator Physics and Engineering Update Jan 6, 2010
Wednesday Ramp single nominal bunches for loss maps
OCELOT orbit correction and optimizer
CESR Beam Instrumentation DAQ
FACET Accelerator Overview
Overview Pre-Beam Checkouts
Undulator Line Design Liz Moog, Advanced Photon Source April 24, 2002
High Level Physics Applications for LCLS Commissioning
What are these kinks on dipole ramp and the associated beam loss?
Linac Physics, Diagnostics, and Commissioning Strategy P
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Bunch Compressor Beam Line Optics
Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
High Level Physics Applications Lehman Review February 7 - 9, 2006
Presentation transcript:

APE Update Nate Lipkowitz 9/13/2011

In Development LCLS: FEE mirror GUI Goal: fast, reproducible mirror steering J. Turner, J. Lewandowski First test on Wednesday night MD Also: undulator pointing In Development

LCLS: Energy Calculator Goal: better predict needed beam energy Invert J. Welch’s reckoning of photon energy Include spontaneous, wakefield losses, orbit compensation In Development

FACET: Energy feedbacks EP01 (scav extraction) energy, using BPM 185 only LI20 (FACET chicane) energy using user-configurable set of LI20 BPMs and orbit fit To do: add orbit correction (SLC magnet control), bugfixes

Other things … FACET commissioning Code maintenance, CATERs

Other things … FACET commissioning Code maintenance, CATERs Vacation!!