Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters

Slides:



Advertisements
Similar presentations
Friday 2 nd November 08:45 Stable beams Fill 3253 Initial luminosity ~7.3e33 cm-2s-1 09:45 Increase RF voltage from 10 MV to 12 MV 12:00 ADT to wideband.
Advertisements

09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Machine Coordinators: G. Arduini, J. Wenninger
Wednesday September 14th
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Monday fill with 1092 bunches (6 h stable beams)
LHC Morning Meeting - G. Arduini
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Barbara Holzer, Jorg Wenninger
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Coordination: Gianluigi Arduini & Jan Uythoven
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Monday Morning – recovery from cryo.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wire almost entirely through beam before BLM triggers dump
Not the most productive 24 hours on record
Wednesday 03/11 – The Plan Finish electron-cloud program:
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
LHC Morning Meeting - G. Arduini
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
LHC Morning Meeting - G. Arduini
Monday 14:00 beam dump Access:
Saturday Nov Stop proton operation. Switch back to ions
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Saturday :42 stable beams fill 3541
LHC - Week 38 Technical stop: Katy Foraz
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Monday 27th August & night
Wednesday 26 October 2011.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Friday :47 stable beams fill 3273
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Tuesday
Presentation transcript:

Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters QPS 17/11/2012 LHC 8:30 meeting

Friday 16th November 05:16 STABLE BEAMS fill 3292. 6.3x1033 cm-2s-1 08:56 Beam dump (SW interlock TCDQ reading - old data). 68 pb-1 in 3h40m. 11:27 Stable beams fill 3293. Initial lumi 6.85e33 cm-2s-1. Longitudinal blow-up 1.4 ns B2 only. 12:44 Beam dump, QPS trigger on RQT13.L5B2. Integrated lumi 28 pb-1 in 43m. 14:17 Start ramp fill 3294. 14:27 Dump during ramp at 2.86 GeV, slow losses at Q6.R5. 17:14 Start ramp fill 3295. 18:29 Operator dump before colliding in LHCb. Steering problems. 20:43 Injection fill 3296. Stop, problem corrector RCBH.23L6B1. 21:00 Access for RCBH.23L6B1 and warm up beam screen Q6.R5 near TOTEM. 17/11/2012 LHC 8:30 meeting

This Saturday, so far 00:18 Sector 56 tripped while setting to stand-by after access. Problem with RQ10.R5, QPS problem suspected. 02:30 Problem RQ10.R5 identified to be due to power converter problem. 04:50 Access for power converter RQ10.R5. 05:29 Access finished. 06:42 Injecting fill 3296, clean without steering. 07:35 Start ramp. 08:23 Stable beams, initial lumi around 7.1e33 cm-2s-1 17/11/2012 LHC 8:30 meeting

Fill 3294, Slow loss Q6.R5 Right of TOTEM Takes about 5 seconds to develop, lots slower than UFO 17/11/2012 LHC 8:30 meeting

Beam Dump Losses Q6.R5 Losses go together with vacuum increase Beam dump signal goes up before vacuum increase Time correlation tricky BLM VAC 17/11/2012 LHC 8:30 meeting

Good ramps: usual vac spike, small losses BLM 17/11/2012 LHC 8:30 meeting

Fill 3295 Lumis ATLAS end CMS at end of adjust too low Need to re-optimise a lot get lumi’s back Traced down to steering problems Correctors masked for the orbit feedback system were used by the orbit feedback calculation, resulting in non standard orbit corrections This is a bug which is not understood and appears on rare ocasions. Did not want to start the LHCb collision exercise with an orbit which is not good and maximum beam in the machine. Decide to dump. 17/11/2012 LHC 8:30 meeting

Fill 3296 Injection orbit with missing corrector RCBH.23L6B1. The corrector was 23urad at injection, orbit bump is at the limit (~2.25 mm). Need to repair corrector Same time warm up beam screen Q6.R5 and access ALICE Power reset on the RQD.A12 for the QPS. 17/11/2012 LHC 8:30 meeting

Fill 3296bis – beam unstable end of squeeze Clean injection and going into physics. BSRT B1 at 1 m BSRT B1 at 0.6 m 17/11/2012 LHC 8:30 meeting

Ramp Saturday morning Vacuum 5R6 well behaved during the ramp Possibly positive effect of warm-up of the beam screen 17/11/2012 LHC 8:30 meeting

The Plan Physics: Repositioning of the 6 bunches (B1/B2) postponed Parameters being scanned (one at a time): Batch-by-batch blow-up (now off) Damper gain during the ramp to try and minimize blow-up now that gated BBQ is operational Tune split during the squeeze to get rid of instability at the end of the squeeze Pending access: ALICE Access wire scanner requested for Monday, including tunnel (RP). PM32 : CV to check / remove sand. Access system CMS (Hadronic Forward Calorimeter) > 1 h BI: wall current monitor (1 h – point 4 RF zone) 17/11/2012 LHC 8:30 meeting