Before any other work can start inside the house the joiners have to return and put a floor on top of the ceiling joists.

Slides:



Advertisements
Similar presentations
Hoop House Construction. Parts of the hoop house Frame Hoops Braces Plastic cover.
Advertisements

Readyville Mill Restoring the Readyville Mill. March 2006 Forgotten and Neglected for 40 years.
Sunny day, installing exterior casings on the windows.
NGfL CYMRU GCaD WOOD OCCUPATION SKILLS SHOPFITTING.
CEILING FRAMES Created by Michael Martin March 2004 / Revised Feb 2007.
CEILING FRAMES Created by Michael Martin March 2004
LVL along south wall acts as lintels for windows.
Mezzanine Floor.
Revision Quiz Click your mouse, read the question, click again to reveal the answer M. S. Martin October 2007.
When the floors are in position they are left a few weeks to dry. Meanwhile various tradesmen can start to put the finishing touches to the building, both.
Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution.
Kubota on hand to remove rubble. Farmall H with tilt trailer.
How to Make a Hot Air Balloon
Unit 61 Interior Trim Wood Molding • Composite Molding • Trimming Door Openings • Trimming Window Openings • Installing Base Molding • Installing Ceiling.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Burglar Alarm Leaving Certificate Technology. Parts List.
Australian inhibitor / Safe pack ARN Date 21 Mar 2012 Howitzer M198 Field Gun -Long term Storage.
Unit 204: Common plumbing processes
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
ASSIGNMENT Begin on page 197 “The Foundation”.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
How to build a two storey house
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
Energy Conservation in the roof structure. Energy conservation Conservation of energy within a roof structure can be at two different positions i.e. Ceiling.
The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing.
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
Wall and Ceiling Construction
Ceiling Framing Unit 32.
Finishing the Building
Drywall Theory. Dry Wall Saw Dry wall T-Saw Dry Wall Lift.
Wall Framing Grimsby Secondary School Technology Dept.
Chapter 23 Elevation Layout and Drawing Techniques.
1 FRENCH RED CROSS in Grenada CONSTRUCTION OF WOODEN HOUSES ACCORDING TO STANDARDS Tel: / Sugar Mill, St George’s.
Making a Rail Car by Stan Pope and Victor and Rob.
Pencil Case. Cut 1 square 8.25” by 8.25”. Cut another square 8” by 8.25” (this square is the lining and the width needs to be slightly smaller). Mark.
ELEVATION END ELEVATION Enlarged SECTION XX Standard conventions and symbols make it easier for people to interpret and understand technical information.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Week 6 Timber based columns
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P / 169 HIGH STREET VINYL.
Designing and constructing a traditional half span hipped end roof  Roof to a domestic extension.
Lesson 5.  The carpentry trade covers many items. That is, it is not confined to a few specific items such a reinforcing steel, painting etc.  Common.
Copyright © Texas Education Agency, All rights reserved. Architectural Design Architectural Models.
House Construction.
by: Maryam Musab Amine We use bricks and tiles to build a house. We use bricks to build the walls. We use tiles to build the floors. The bricks and tiles.
When all the walls have been coated with Carlite finish and dried the plumbers can return to fit all the necessary pipe work and the radiators. Then a.
CARPENTRY By: Jason Burkhart. The installation of your floor system will depend on the design of your house. The guidelines we will use are 24ft wide.
Installation Walkthrough Image Guide
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
Construction Framing Mr. Brock.
UPPER FLOORS TIMBER AND CONCRETE.
Elevation Layout and Drawing Techniques
Craft Occupations in the Construction Industry
When the building is at first floor level it is time for the joiners to fix the ceiling joists as the brick layers are ready to start building the second.
Building section A vertical cut or slice through a structure that illustrates the type of foundation, wall, and roof construction to be used.
Wood Frame Construction
WOOD OCCUPATION SKILLS SHOPFITTING
C++ Classes and Objects
Building Drawing.
Vocab. Vocab Wall Layout Floor Layout Ceiling Layout.
Ашық сабақ 7 сынып Файлдар мен қапшықтар Сабақтың тақырыбы:
Windows басқару элементтері
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
Wates CBE Learning Operation defects: Snag sheet slide presentation
Қош келдіңіздер!.
Monitor Producer Consumer.
Timber Frame Panel with opening Typical panel comprises a series
Информатика пән мұғалімі : Аитова Карима.
Evaluating an expression with one variable
Presentation transcript:

Before any other work can start inside the house the joiners have to return and put a floor on top of the ceiling joists

Cutting the floor sheeting to size

Using a nail gun to fix the floor sheets in place

The floor in place

The house is fast reaching the stage when the electricians and plumbers will arrive so the building has to made secure. The windows have then to be fitted

Ready for the windows

The windows arrive

Fixing bracket in place

Windows nailed in place

Windows being sealed in place on the inside

Window in place ready to be trimmed and sealed