8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Brief Summary of LPA MD on 19 June 2012 Jose Abelleira, Xavier Buffat, Chandra Bhat, Karel Cornelis, Riccardo De Maria, Stephane Fartoukh, Rossano Giachino,
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
LHC Status Fri Morning 3-June
Y.Papaphilippou Thanks to
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Machine Coordinators: G. Arduini, J. Wenninger
Longitudinal beam parameters and stability
Wire, flat beams and beam-beam MDs in 2017
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
MD#4 Summary MD Coordinators: Giulia Papotti, Frank Zimmermann
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Monday 18 October : Collimation system
LHC MD block#3 Ralph Assmann, Giulia Papotti, Frank Zimmermann
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Beam dynamics requirements after LS2
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
MD Planning Fri – Sat (1. – 2.7.)
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Thursday Morning/Afternoon
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

MD#2 News & Plan Tue – Wed (19. – 20.6.) Day Time MD EiC MP Tue 06:00 450 GeV  4 TeV: Ramp for chromaticity - missed A 08:00 Ramp down 10:00 450 GeV: Large Piwinski Angle MD + precycle 2 bunches 2.4e11 – started with 3:30 h delay 18:00 450 GeV  4 TeV: Octupole instability threshold Single full physics beams – successful Ramp for chromaticity + octupole effect C Wed 02:00 04:00 450 GeV  4 TeV: Longitudinal dynamics studies B 12:00 450 GeV  4 TeV: Beta* leveling 2 nominal bunches 20:00 22:00 450 GeV  4 TeV: Long-range beam-beam with high bunch intensity 84b 50 ns 1.7e11 Giulia Alick Ghislain Giulia Mirko Alick Ghislain 21-06-12 MD#2 News & Plan 21 June 2012

Draft MD Planning Thu – Fri (21. – 22.6.) Day Time MD EiC MP Thu 06:00 Ramp down 08:00 450 GeV  4 TeV: High beta* (1) A 16:00 18:00 450 GeV: MKI UFO studies C Fri 04:00 450 GeV  4 TeV: Scraping, diffusion and Repopulation Study and fast losses (with ADT) C+C 12:00 14:00 450 GeV: Injection and Q20 optics 22:00 450 GeV: RF cavity phase modulation for 25ns B Ghislain Mirko Alick Ghislain Verena Mirko 21-06-12 MD#2 News & Plan 21 June 2012

Draft MD Planning Sat – Mon (23. – 25.6.) Day Time MD EiC MP Sat 06:00 450 GeV  4 TeV: High beta* (2) A 14:00 Ramp down 16:00 450 GeV: Transverse Damper studies 22:00 Sun 00:00 450 GeV  4 TeV: Collimation (impedance, nominal settings) C 08:00 450 GeV: Beam Instrumentation (BSRT, BGI, wire scan, BPM nonlinearities) A/B/C 450 GeV  4 TeV: Test ramp for emittance calibration B/C 20:00 450 GeV: Dynamic Aperture MD D Mon Technical Stop Alick Enrico Mirko Alick Enrico Mirko Alick 21-06-12 MD#2 News & Plan 21 June 2012

longitudinal dynamics studies Fill w/o ramp: 8 bunches of different intensity (7E10-2.4E11) with minimum possible uniform bunch length - 1.1 ns in LHC; measured: stable phase shift, peak detected Schottky, and bunch profile during almost 2 hours, giving also dependence on bunch length (1.7 ns at the end). Terminal server cerntsab35blocked for 68 min. Phase loop off after injection. At the end transverse tune measurements by kicking each bunch with ADT off (and on) and phase loop on. Fill w ramp: first 4 bunches with different intensity; last 4 with maximum intensity and different bunch length. Ramp with phase loop off. Longitudinal blow up off. Some bunches unstable during the ramp; oscillations continued on the flat top for long time, even when switching phase loop on. Bunch length for beam 1 was growing much faster than for beam 2. Length of 1.1 ns was sufficient to stabilize beam 1. Beam 2 with 1 ns unstable till beam dump. Impedance measurements on flat top. Tune measurements at the end. → longit. & trans. impedance

longitudinal dynamics studies Injected 8 “indivs” with different intensities but similar bunch lengths, longitudinal measurements being taken with phase loop off (was on for injecting). E. Shaposhnikova, J. Esteban Muller, R. Calaga et al fill 1 synchronous phase, synchrotron frequency, tune shift , etc. for different intensity and bunch length lost 1 h due to IT upgrade at 6:30

longitudinal dynamics studies fill 2 ramp

beta* leveling 1. filled with pilot and two nominal bunches, ramped and squeezed to b*=3 m as normally done; then collapsed separation at IP1 and 5, and squeezed in steps down to b*=0.6 m, with lumi scans at each point. Luminosity optimization done at each step, and increased as expected. Optimization for the end of squeeze caused some beam-2 loss when optimizing in the crossing angle plane. 2. measured Q’ with beams separated; then re-optimised the collisions, and reduced octuple strength to 50%, 40%, 30%,20%, 10% and 0, with Q’ measurements ( with beams separated) at several points. Finished with zero octupole strength and beams separated by 100 mm at IPs 1 and 5. Beams were stable throughout.

beta* leveling - overview S. Redaelli, J. Wenninger, L. Ponce, M. Pojer, et al luminosity increase

lifetime during beta* leveling

losses for bunch 1885 of B2 when doing luminosity optimization of crossing angle plane at b*=0.6 m

bunch length evolution during beta* leveling

Q’ variation w. octupole current in squeeze consistent with previous night

chromaticity varies w. octupoles on flat top 20 June 2012 Giulia Papotti, Nicolas Mounet, Alexey Burov, et al

long-range beam-beam study first fill - long range losses with high intensities. 36 bunches, 1.6e11 ppb with e~2micron was brought into collision. Crossing angle reduced in IP1 & IP5 first in steps of 10% starting from 145mrad. Lifetime was observed and significant losses appeared due to the reduced distances at the long-range encounters of IP1 at around 50% of the initial angle in IP1. After finding the limit IP1 reduced IP5 crossing angle till same crossing for both IPs was set. second fill - effect of the reduced beta* with respect to 2011 and same intensity. Injected 36 bunches of 1.2e11 ppb, collide them and reduce the crossing angle of IP 1. Lifetime was observed and a reduced crossing angle of 45% nominal shows reduction in lifetime.

long-range beam-beam study luminosity increase as crossing angle is reduced

long-range beam-beam study W. Herr, T. Pieloni, G. Papotti, R. Assmann, G. Roy, R. Giachino et al losses along train show effect of LR encounters

long-range beam-beam study W. Herr, T. Pieloni, G. Papotti, R. Assmann, G. Roy, R. Giachino et al fill 1

long-range beam-beam study W. Herr, T. Pieloni, G. Papotti, R. Assmann, G. Roy, R. Giachino et al fill 2