IEEE Session #52 Indian Wells, CA Opening Plenary

Slides:



Advertisements
Similar presentations
25 March 2008 (updated January 2012) The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: l Show slides #1 through #4 of this.
Advertisements

Doc.: IEEE /0021r0 Submission January 2011 Stephen McCann, RIMSlide 1 TGu Agenda Date: Authors:
Doc.: IEEE /0698r0 Submission May 2015 Xiaoming Peng (I2R)Slide 1 Date: Authors: IEEE aj Task Group March 2015 Report.
Doc.: IEEE /0075r0 Report Nov 2011 Jon Rosdahl, CSRSlide 1 First Vice Chair Report 2011 Date: Authors:
Doc.: IEEE /0507r0 Submission TGaj CC12 on 10 April 2014 Report Author: Date: NameCompanyAddressPhone Haiming WANGSEU/CWPAN 2.
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4r Opening and Closing for.
1 Patents / Intellectual Property Slides. 2 Membership & Affiliation SISO-ADM-002 requires PDG/PSG members to be SISO members Membership obtained through.
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
IEEE Session #56, Big Island, HI, USA WG Opening Plenary
IEEE ah Sub 1 GHz license-exempt operation Agenda for July 2014
Month Year doc.: IEEE /0xxxr0 January 2014
Instructions for the WG Chair
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2018 Plenary] Date Submitted:
IEEE Session #59, Dallas, TX, USA WG Opening Plenary
Instructions for the WG Chair
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2018 Plenary] Date Submitted:
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda May 2018 Interim] Date Submitted:
November 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda November 2018 Plenary]
doc.: IEEE <doc#>
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2018 Plenary] Date Submitted:
< Sept > Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Opening and Closing Report Sep.
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
November 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for November.
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4md Agenda May 2018 Interim] Date Submitted:
doc.: IEEE <doc#>
Instructions for the WG Chair
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2018 Plenary] Date Submitted:
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
Instructions for the WG Chair
January 2010 VHTL6 (TGac) Meeting Agenda
IEEE Session #50 Atlanta, GA, USA Opening Plenary
IEEE Session #47 Atlanta, USA Opening Plenary
IEEE Session #46 Bangkok, Thailand Opening Plenary
IEEE Session #51 San Diego, USA Opening Plenary
Sub 1 GHz license-exempt operation Agenda for September 2010
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2018 Plenary] Date Submitted:
July 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda July 2018 Plenary] Date Submitted:
TGu Agenda Date: Authors: November 2010 November 2010
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Interest Group ELR Opening Report.
January 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda January 2019 Interim] Date.
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Study Group EIR Opening Report.
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG Profiles Agenda March 2019 Plenary] Date.
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4md Agenda May 2018 Interim] Date Submitted:
doc.: IEEE <doc#>
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2019 Interim] Date Submitted:
March 2018 Project: IEEE P MD
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2019 Interim] Date Submitted:
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda March 2019 Interim] Date Submitted:
<month year> <January 2019>
TGae Agenda Date: Authors: March 2011 September 2009
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Study Group EIR Opening Report.
TGac – Coexistence Ad Hoc Meeting #3
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda May 2018 Interim] Date Submitted:
HEW SG March 2014 Meeting Agenda
HEW SG January 2014 Meeting Agenda
IEEE Session #51 San Diego, USA Opening Plenary
May 2013 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG SRU Opening Information for May 2013] Date.
Submission Title: [15.4k LECIM Opening Report for Singapore 2011]
May 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for TG w May 2019 Interim Meeting]
July 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG Profiles Agenda July 2019 Plenary] Date.
July 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda July 2019 Plenary] Date Submitted:
IEEE aj Task Group Sept 2012 Report
WNG SC Agenda Date: Authors: March 2009 March 2009
Submission Title: IG SEC Opening Report for July 2014 Session
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4md Agenda May 2018 Interim] Date Submitted:
IEEE Session #92 WG Opening Plenary
September 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG Profiles Agenda September 2019 Interim]
September 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG Profiles Agenda September 2019 Interim]
September 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4y SECN Agenda September 2019 Interim]
Presentation transcript:

IEEE 802.21 Session #52 Indian Wells, CA Opening Plenary Month 20xx doc.: IEEE 802.21-02/xxxr0 IEEE 802.21 Session #52 Indian Wells, CA Opening Plenary Subir Das sdas at appcomsci dot com Subir Das, Chair 802.21 WG XXXX, His Company

WG Officers Office Officer Chair Subir Das Vice Chair Anthony Chan doc.: IEEE 802.21-02/xxxr0 WG Officers Office Officer Chair Subir Das Vice Chair Anthony Chan Secretary Charles E. Perkins Editor David Cypher 802.11 Liaison Clint Chaplin 802.16 Liaison Peretz Feder IETF Liaison Yoshihiro Ohba September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

IEEE 802.21 Meeting Server Details Month 20xx doc.: IEEE 802.21-02/xxxr0 IEEE 802.21 Meeting Server Details http://mentor.ieee.org/802.21/documents September 2012 Slide 3 Subir Das, Chair 802.21 WG XXXX, His Company

Session Time and Location Month 20xx doc.: IEEE 802.21-02/xxxr0 Session Time and Location   Monday (Sept 17, 2012) Tuesday (Sept 18, 2012) Wednesday (Sept 19, 2012) Thursday (Sept 20, 2012) AM-1 8:00-10:00a NA 802.16 HetNet SG AM-2 10:30-12:30 802.21 WG Opening Plenary 802.11 PAD SG 802.21 WG mid week Plenary 802.21c TG PM-1 1:30 – 3:30p 802.21d TG   802.21c TG PM-2 4:00 – 6:00p 802.11 PAD/802.16 HetNet SG 802.21d TG 802.21 WG Closing Plenary Eve 6:30 – 10:30p Social Event (7:00- 9:00 pm) Default Location: 802.21 - Salon G; 802.16 HetNet -Salon C; 802.11 PAD- Dessert Vista E September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Attendance Electronic Attendance ONLY Electronic Attendance Month 20xx doc.: IEEE 802.21-02/xxxr0 Attendance Electronic Attendance ONLY Electronic Attendance IMAT System Changed from earlier version: one view https://imat.ieee.org/attendance Mark attendance during every session Total number of 802.21 WG sessions: 15 12 sessions for 75% attendance to be counted towards WG voting membership All attendance records are reported on the meeting minutes Please check the attendance records for any errors September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Voting Membership 802.21 Voting Membership described in Month 20xx doc.: IEEE 802.21-02/xxxr0 Voting Membership 802.21 Voting Membership described in DCN#: 21-06-0075-02-0000 Maintenance of Voting Membership Two Plenary sessions out of four consecutive Plenary sessions on a moving window basis One out of the two Plenary session requirement, could be substituted by an Interim session WG Letter Ballots WG members are expected to vote on WG LBs Failure to vote on 2 out of last 3 WG LBs could result in loss of voting rights September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Miscellaneous Meeting Logistics Month 20xx doc.: IEEE 802.21-02/xxxr0 Miscellaneous Meeting Logistics Network Information: http://802world.org/wireless Mobile Device website: http://802world.org/attendee Room Internet should be complimentary Network Help Desk: Date Palm Breakfast/Coffee/Snacks: Verde Vista Terrace + LM Foyer 802.21 WG would break as follows: AM Coffee break: 10:00-10:30 am PM Coffee break: 3:30 - 4:00 pm Wednesday Night Social 6:30 onwards; Venue: See Notice Board September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Registration and Media Recording Month 2002 doc.: IEEE 802.21-02/xxxr0 Registration and Media Recording Each Attendee must provide contact information and pay conference fee Conference fee has to be paid through the registration desk at the hotel or through sponsor Failure to pay conference fee results in loss of credit for voting rights Photography not permitted unless approved by WG Chair Audio taping of IEEE 802.21 meetings is NOT allowed Media – Press and Analyst briefings Only the 802.21 WG Chair and WG Vice-Chair are allowed to give verbal statements/interviews to the media on behalf of the IEEE 802.21 working group September 2012 Subir Das, Chair 802.21 WG 17 XXXX, His Company

Membership & Anti-Trust Month 2002 doc.: IEEE 802.21-02/xxxr0 Membership & Anti-Trust Individual membership In all IEEE standards meetings, membership is by individual, hence you do not represent a company or organization. Anti-Trust laws The Anti-Trust laws forbid the discussion of prices within our meetings. September 2012 Subir Das, Chair 802.21 WG 26 XXXX, His Company

Month 2002 doc.: IEEE 802.21-02/xxxr0 (Optional to be shown) The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: Show slides #1 through #4 of this presentation Advise the WG attendees that: The IEEE’s patent policy is consistent with the ANSI patent policy and is described in Clause 6 of the IEEE-SA Standards Board Bylaws; Early identification of patent claims which may be essential for the use of standards under development is strongly encouraged; There may be Essential Patent Claims of which the IEEE is not aware. Additionally, neither the IEEE, the WG, nor the WG chair can ensure the accuracy or completeness of any assurance or whether any such assurance is, in fact, of a Patent Claim that is essential for the use of the standard under development. Instruct the WG Secretary to record in the minutes of the relevant WG meeting: That the foregoing information was provided and that slides 1 through 4 (and this slide 0, if applicable) were shown; That the chair or designee provided an opportunity for participants to identify patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) of which the participant is personally aware and that may be essential for the use of that standard Any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom. The WG Chair shall ensure that a request is made to any identified holders of potential essential patent claim(s) to complete and submit a Letter of Assurance. It is recommended that the WG chair review the guidance in IEEE-SA Standards Board Operations Manual 6.3.5 and in FAQs 12 and 12a on inclusion of potential Essential Patent Claims by incorporation or by reference. Note: WG includes Working Groups, Task Groups, and other standards-developing committees with a PAR approved by the IEEE-SA Standards Board. September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Participants, Patents, and Duty to Inform Month 2002 doc.: IEEE 802.21-02/xxxr0 Slide #1 Participants, Patents, and Duty to Inform All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents “Personal awareness” means that the participant “is personally aware that the holder may have a potential Essential Patent Claim,” even if the participant is not personally aware of the specific patents or patent claims “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of such potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2 Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Month 20xx doc.: IEEE 802.21-02/xxxr0 Slide #2 Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws http://standards.ieee.org/guides/bylaws/sect6-7.html#6 IEEE-SA Standards Board Operations Manual http://standards.ieee.org/guides/opman/sect6.html#6.3 Material about the patent policy is available at http://standards.ieee.org/board/pat/pat-material.html If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at patcom@ieee.org or visit http://standards.ieee.org/board/pat/index.html This slide set is available at http://standards.ieee.org/board/pat/pat-slideset.ppt September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Call for Potentially Essential Patents Month 20xx doc.: IEEE 802.21-02/xxxr0 Slide #3 Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Other Guidelines for IEEE WG Meetings Month 2002 doc.: IEEE 802.21-02/xxxr0 Slide #4 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. --------------------------------------------------------------- See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

2.7 LMSC Chair’s Guidelines on Commercialism at meetings Month 20xx doc.: IEEE 802.21-02/xxxr0 2.7 LMSC Chair’s Guidelines on Commercialism at meetings http://www.ieee802.org/misc-docs/802_chair_guidelines_rev1.9.6.pdf IEEE 802 Plenary Sessions are held to develop standards. Commercial activity in conjunction with these meetings is discouraged. The Executive Committee of IEEE 802 has expressed a clear desire to avoid product promotions, or anything that can be construed as a product promotion, at the IEEE 802 meetings. We do not want IEEE standards meetings to turn into trade shows, where vendors avail themselves of the opportunity to show their wares to a captive audience. Any discussion of pricing information in the IEEE 802 meeting can bring our body under suspicion of anti-trust violations and therefore cannot be allowed. IEEE 802 meetings make no provision for hospitality suites, product demos, and receptions (collectively referred to as "vendor events"). However, if any vendor embarks on such an activity they are asked to adhere to the following guidelines: A) No announcements or notifications regarding vendor events should be made inside the IEEE 802 meeting rooms or in the vicinity of the IEEE 802 meeting rooms or IEEE 802 registration office. B) No brochures or other collateral material should be distributed inside the IEEE 802 meeting rooms, or in the adjacent areas that constitute the IEEE 802 meeting area. An exception is made for brochures and collateral related to current and upcoming meeting venues, such as travel brochures, and for IEEE publications. C) No posters outside IEEE 802 meeting rooms. D) No notification using IEEE WG EMAIL reflectors. E) No commercial mailing notification using the address lists obtained from IEEE or IEEE 802. September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Month 2002 doc.: IEEE 802.21-02/xxxr0 Copyright Under the current US copyright law — the author of information is deemed to own the copyright from the moment of creation The IEEE Bylaws require copyright of all material to be held by the IEEE Must consult with IEEE for re-use of copyright material The IEEE Standards accomplishes transfer of copyright ownership through the Project Authorization Request (PAR) process September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

New Members New Member Count = doc.: IEEE 802.21-02/xxxr0 Month 2002 September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Objectives for the September Meeting Month 20xx doc.: IEEE 802.21-02/xxxr0 Objectives for the September Meeting Task Group Activities 802.21c: Single Radio Handovers Finalize Draft document 802.21d Finalize Use cases and requirements document Call for proposal discussion PAR discussion September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Month 20xx doc.: IEEE 802.21-02/xxxr0 Future Sessions – 2012 Plenary: 11-16 Nov 2012, Grand Hyatt, San Antonio, TX Co-located with all 802 groups September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

November, 2012 Sessions Details Month 20xx doc.: IEEE 802.21-02/xxxr0 November, 2012 Sessions Details Plenary: 11-16 Nov 2012, Grand Hyatt, San Antonio, TX Registration Fees & Deadlines: Early:  Before 6pm Pacific Time, Friday, October 5, 2012 $400 US for attendees staying at the Grand Hyatt San Antonio $700 US for all others (including local attendees not staying at the group hotel)   Standard:  After Early Registration and before 6pm Pacific Time, November 2, 2012 $500 US for attendees staying at the Grand Hyatt San Antonio $800 US for all others (including local attendees not staying at the group hotel) Late/On-site:  After 6pm Pacific Time November 2, 2012 $600 US for attendees staying at the Grand Hyatt San Antonio $900 US for all others (including local attendees not staying at the group hotel)   Registration Website:  http://802world.org/plenary IEEE 802 Plenary Session Group Hotel Rates: Grand Hyatt San Antonio : 600 E. Market Street , San Antonio, Texas, USA  78205 GROUP RATE (SINGLE):  $195/Night (plus applicable taxes)* Rate applies to Single Occupancy Run of House Rooms, Internet access included.  GROUP RATE (DOUBLE):  $215/Night (plus applicable taxes)*.  EXTENDED DATES:  November 2-26, 2012; subject to availability September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Month 20xx doc.: IEEE 802.21-02/xxxr0 Future Sessions – 2013 Interim: 13-18 January, 2013, Hyatt Regency, Vancouver, BC, Canada Plenary: 17-21 March, 2013, Caribe Royale, Orlando, FL, USA Co-located with all 802 groups Interim: 12-17 May 2013, Hilton Waikoloa Village, 2013 Co-located with all 802 wireless groups Plenary: 14-19, July 2013, Geneva, Switzerland Interim: 15-20, September 2013, Nanjing , China Plenary: 10-15 Nov 2013, Hyatt Regency Reunion, Dallas, TX, USA September 2012 Subir Das, Chair 802.21 WG XXXX, His Company

Month 20xx doc.: IEEE 802.21-02/xxxr0 Future Sessions – 2014 Interim: 19-24 January, 2014, Century Plaza, Los Angeles, CA, USA Co-located with all 802 groups Plenary: 16-21 March, 2014, Hyatt Regency, Atlanta, GA, USA Interim: 11-16 May 2014, Hilton Waikoloa Village, HI Co-located with all wireless groups Plenary: 13-18, July 2014, Manchester Grand Hyatt, San Diego, CA, USA Interim: 14-19, September 2014, TBD Co-located with all 802 wireless groups Plenary: 2-7 Nov 2014, Grand Hyatt, San Antonio, TX, USA September 2012 Subir Das, Chair 802.21 WG XXXX, His Company