MOD Flow Swap Scenario’s – Initial Thoughts

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
RIIO Gas Transmission Workshop - 5 th Sept Supplementary information 1 Hypothetical examples to illustrate the impact of combining the constraint management.
Review Group -140 Thoughts on additional information requirements.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transmission Workstream 6 January 2011
Moffat - Capacity System Entry Point
Transitional Exit Capacity Proposals -Update
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Entry Capacity Overrun price calculation
Offtake Workstream : 8th September 2010
Transmission Workgroup 4th October 2012
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
UNC Trader User – Licence obligations
OAD Telemetry Requirements for “SOMSA” Exit
Transmission Workgroup – 1st December 2011
UNC 0407 Analysis Scope - Update
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
Assignment of NTS Entry Capacity – Background and UNC Obligations
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
Transmission Workgroup June 7th 2012
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Draft Capacity & Connection Plan
MOD National Grid NTS Initiated Flow Swaps
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
QSEC auction timetable
Mod 0621 Amendments to Gas Transmission Charging Regime
Flow Swaps at NTS / LDZ offtakes
Flow Swap Scenarios – Agreed Logic
Long Term Non Firm Capacity Update
MOD Deemed applications – User pays initial thoughts.
Interruptible to Firm – NTS Supply Point Transition
UNC Transmission Workstream 7th December 2006
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Richard Fairholme E.ON UK
Assured Pressures Proposal
Mark Freeman 29th January 2007
Entry Overrun Calculation
Reinstatement of NTS Interruption
Measurement Error Notification Guidelines for NTS to LDZ and LDZ to LDZ Measurement Installations Review 2014.
February 2007 Note: Source:.
Information Provision for Transitional Exit Capacity
Stefan Leedham Transmission Workstream 2nd November 2006
Proposed Changes to UNC Section Q Emergencies - Mod 035
Exit Constraint 23rd January 2013.
Exit Overruns in the Enduring Regime
Transmission Workstream, 1 Mar 07
Transmission Workstream 4th December 2008
OAD Telemetry Requirements for “SOMSA” Exit
Gas Customer Forum 28 July 2008
MOD Flow Swap Scenario’s – Initial Thoughts
Transmission service (approved tariffs) (approved tariffs) Variation
Presentation transcript:

MOD 0365 - Flow Swap Scenario’s – Initial Thoughts April 4th 2011 Transmission Work stream 2 December 2010

Overrun Adjustment Principles – initial thoughts NTS Exit Capacity can not, effectively, be created through the flow swap process An NTS Exit Overrun adjustment only occurs: Post 30th September 2012 Where an NTS or DN initiated flow swap has been agreed between the relevant DNO and National Grid NTS If the resulting increase in offtake flow has resulted in a chargeable NTS Exit Overrun at the increasing NTS/LDZ Offtake At the NTS/LDZ Offtakes at which the flow swap occurred

Flow Swap Scenarios Example 1

Flow Swap Scenarios Example 2

Flow Swap Scenarios Example 3

Flow Swap Scenarios Example 4

Wrap Up Based on feedback received, go through internal governance regarding the scenarios discussed and the potential withdrawal of Modification 0365 Views sought on how to formalise agreement to the scenarios?