1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Advertisements

LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Critical Steps in Process Design
Market Systems Release Update Modifications Committee Meeting 55 June 19 th
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Thursday August 20, 2009 John Anderson Page 1 Accelerator Interlock System Issues Flow Down of Requirements from the Safety Order to Engineered Safety.
Injector RF and Synchrotron RF Present Status, Activities, Plans PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 1.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
ACD Down-Select Criteria and Time Scales for HLRF ML-KOM FNAL September 27 、 2007 S. Fukuda, KEK & Ray Larsen, SLAC For the ILC HLRF Collaboration.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
Installation Package - Electrical
Security Development Lifecycle (SDL) Overview
Director’s Progress Review Closeout Meeting
Cryoplant Controls Installation
Accelerator Readiness Review October 31, 2006
Cryogenic Plant Controls – Cost and Schedule
Supportability Design Considerations
Installation Procurement Package
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
Cryogenic Plant Electrical and Controls
2K Cold Box FDR Introduction
Scope Planning.
Process Control System Requirements
2K Cold Box PDR Introduction
R. Denz, A. Gomez Alonso, AT-MEL-PM
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LCLS-II 2K Cold Box Controls Design Review
Document Plan & Milestones WP7
Overview of Mechanical Design
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
LCLS-II Cryoplant Controls Readiness to Procure
Social Media in the Automation Industry
2K CB FDR Overview:  Agenda, Charge, Review Process
2K Cold Box Mechanical Design
LCLS Linac Technical Design Review Charge
2K CB FDR Conclusion:  Project Summary, Procurement Plan / Status
GLAST Large Area Telescope:
BU IS GIG Chemical, Oil & Gas
Managerial Accounting Second Edition Weygandt / Kieso / Kimmel
Director’s Progress Review Closeout Meeting
JEFFERSON LAB LCLSII CRYOPLANT INSTALLATION PACKAGE DIRECTOR’S PROGRESS REVIEW Welcome and Introduction Stuart Henderson June 1, 2017.
Cryoplant Installation Design Summary
2K Cold Box Cost, Schedule & FDR Summary
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
PLC Coding and Local HMI
Charge 2. Equipment Protection 3. Definition and Documentation
Scope, Requirements Deliverables & Schedule
Documentation Chris Scanlon and Ritendra Bhattacharya
Overarching Commissioning Plan
Far Experimental Hall Hutches Civil Construction
LERF Readiness Review: Charge
Operator Training Requirements
Testing Plan and Status
The Technology Integration Planning Model
CryoPlant Commissioning
DG Environment, Unit D.2 Marine Environment and Water Industry
PSS verification and validation
Conventional Facilities Status
LCLS Personnel Protection System and Beam Containment System
DOE Review of the LCLS Project October 2006
Onsite Training at JLab
Atefeh Sadeghzadeh Control engineer – Target safety and control
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
GLAST Large Area Telescope:
LERF CM Supplemental Testing & Change Management
LCLS-II Operations in LERF
Our Process CMSC 345, Version 1/04.
Presentation transcript:

Control Hardware & Status Ritendra Bhattacharya LCLS-II Software Review November 14, 2018

Charge 3. DEFINITION AND DOCUMENTATION 1. GENERAL a) Is the documentation and coding maturity consistent with the schedule? 2. EQUIPMENT PROTECTION Are all equipment protection functions (in particular responses to abnormal conditions such as trips, alarms and interlocks) comprehensive, clearly identified, documented, implemented and traceable to the PLC code? 3. DEFINITION AND DOCUMENTATION Are all automated functions (Alarms, Trips, Interlocks / Permissive, Cause and Effects, Control Loops, and Automated Sequences) sufficiently documented for Coding, Testing, Commissioning, Operation and Troubleshooting? LCLS-II Software Review, November 14, 2018

Outline Introduction Development Phases Control Hardware – Phase I, Phase II and Phase III Control Hardware Status Manufacturing - Phase I, Phase II and Phase III LCLS-II Software Review, November 14, 2018

Introduction Control hardware provides the physical layer on which developed software will be running Equipment protection function is achieved with the combinations of control hardware and developed software in the PLC systems for each sub-systems Control hardware includes PLC enclosures and Many small electrical enclosures covering gas management, utility, 4.5 K cold box and 2 K cold box LCLS-II Software Review, November 14, 2018

Development Phases Drawing preparation Review and approve Control Hardware FDR Sept 13, 2017 PRR Nov 2017 Phase I Delivery SLAC June 2018 Phase II Delivery SLAC Sept 2018 Phase III Delivery JLAB Oct 2018 LCLS-II Software Review, November 14, 2018

Phase I Control Hardware NOTES: Phase I hardware comprises 29 drawings and 18 enclosures 6 CWS enclosures are at JLAB for further integration Delivery Status is based on availability of the enclosure at SLAC LCLS-II Software Review, November 14, 2018

Phase II Control Hardware NOTES: Phase II hardware comprises 33 drawings and 33 enclosures 8 enclosures for 2 K CB are at JLAB for further integration Delivery Status is based on availability of the enclosure at SLAC LCLS-II Software Review, November 14, 2018

Phase III Control Hardware NOTES: Phase III hardware comprises 06 drawings and 10 enclosures All 10 enclosures are at JLAB for further integration Delivery Status is based on availability of the enclosure at SLAC LCLS-II Software Review, November 14, 2018

Control Hardware Status Total 68 approved “Issue for Construction” drawings are part of the package. All the 61 enclosures are manufactured, factory tested and accepted 37 enclosures are delivered to SLAC Remaining 24 enclosures are delivered to JLAB for further integrations LCLS-II Software Review, November 14, 2018

Pictures – Phase I PLC at Factory Small ENCL at Factory Delivery Shipping Protection PLC at SLAC LCLS-II Software Review, November 14, 2018

Pictures – Phase II 4.5 K PLC at Factory 2 K PLC at Factory Small ENCL at Factory Delivery Shipping Protection PLC at SLAC LCLS-II Software Review, November 14, 2018

Pictures – Phase III ENCL 79120-1520 Dust protection Small ENCL at Factory ENCL 79720-1000 LCLS-II Software Review, November 14, 2018

Charge 3. DEFINITION AND DOCUMENTATION 1. GENERAL Is the documentation and coding maturity consistent with the schedule? - Yes, partially addressed in this talk w.r.t. control hardware availability consistent with schedule 2. EQUIPMENT PROTECTION Are all equipment protection functions (in particular responses to abnormal conditions such as trips, alarms and interlocks) comprehensive, clearly identified, documented, implemented and traceable to the PLC code? – Yes, partially addressed in this talk. 3. DEFINITION AND DOCUMENTATION Are all automated functions (Alarms, Trips, Interlocks / Permissive, Cause and Effects, Control Loops, and Automated Sequences) sufficiently documented for Coding, Testing, Commissioning, Operation and Troubleshooting? – Yes, partially addressed in all electrical drawing packages; manufactured hardware are now available LCLS-II Software Review, November 14, 2018

THANK YOU FOR KIND ATTENTION LCLS-II Software Review, November 14, 2018