8th SG meeting ERI South-West Europe

Slides:



Advertisements
Similar presentations
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Advertisements

Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Gas Regional Initiative – North West Region Bonn 28 April 2009 Fiete Wulff Capacity Project C1 Short-Term Capacity (STC) Operators’ Group Update.
Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Feedback on the SWE coupling Public Consultation Imeplementation Group meeting – 7th april 2014.
Draft document – Work in progress
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
European Federation of Energy Traders 1 8th SG meeting ERI South-West Europe 6 th October 2014, Madrid.
Amine Abada 06/10/2014 ERI SWE TERRE #2 Trans European Replacement Reserve Exchange.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
EFET comments on obstacles to trading November 2007 Obstacles to Electricity Trading in Central & Eastern Europe – latest development.
Open market coupling 1 Open Market Coupling 2nd Miniforum/ Stakeholder Meeting in ERI Northern Europe Copenhagen, June 27, 2006 Dr. Frank-Peter Hansen.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Bjørn W Melaa Excom Vice Chairman The Gas Regional Initiatives and the CBP "working towards a standardised European gas network"
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
1 Identification of the needs to modify auction rules in the FUI region Congestion management meeting – 11 January 2007.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
6th Stakeholder Group meeting Stockholm – 26 November 2009 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer,
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
Gas Regional Initiative South South-East
Congestion Management
2nd Mini-Forum for Central West Electricity REM
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Transparency Project GRI NW Region
New transparency guidelines
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
26th IG meeting 23th January 2014
43th IG Meeting South Gas Regional Initiative
Continuous Cross-Border Implicit Intraday Trade Status update
Feedback on the SWE coupling Public Consultation
Background and Process
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
Regulators’ update on Congestion Management and Balancing
SG meeting FR/UK/IR region 14 June 2007 Congestion management
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Draft document – Work in progress
29th April 2014 Teleconference
Transparency Project GRI NW Region.
43th IG Meeting South Gas Regional Initiative
Gas balancing – where next
ERGEG Benchmarking report on long term transmission rights
Proposer: National Grid NTS Panel Date: 17th April 2014
Gas Regional Initiative South South-East
Trans European Replacement Reserve Exchange
ERGEG comment to KEMA study on Art. 3 and 7
Gas Regional Initiative South South-East
Presentation transcript:

8th SG meeting ERI South-West Europe 6th October 2014, Madrid

Single nomination of IFE LT Transmission Rights EFET welcomes the possibility of single nomination of Transmission Rights. This possibility should be applied in all timeframes. Any nomination of capacity (to TSOs) should be independent from the energy market transactions (through PXs or OTC).

Intraday hybrid model EFET strongly requests the implementation of ID continuous trading model (IDC) with a direct nomination to the TSOs as soon as possible and this is the preferred model. Auctions in the ID market must not affect the IDC operation, namely, the allocation of the capacity in the borders and firmness of IDC transactions, and must be voluntary. EFET also asks the Implementation Group for analyzing a possible transitory solution to move the present Iberian ID model (6 auctions, closing around H-4) closer to Real Time operation. EFET supports a model with a voluntary Opening Auction to trade the energy linked to the Ancillary Services allocated by the TSOs before starting the IDC. Any further auction when IDC is already working, should not interrupt the IDC, nor allocate interconnection capacity and must be voluntary.

BALIT & TERRE BALIT has been a relevant improvement in the development of cross-border balancing mechanisms, but still with very few transactions. EFET suggests a pilot project of a BSP-TSO model (alongside the TSO-TSO model). TERRE project has to define the new balancing products according to the BC Network Code: Replacement Reserve Manual Frequency Restoration Reserve Greater degree of stakeholder involvement needed

Thank you!